Urban Hydrology Analysis: Jakarta: Indonesia

Page 1

JAKARTA HYDROLOGY - THE WATER STORY REGIONAL SCALE

ISLAND WIDE SCALE

WATER MEMORIES

SOCIO - TECHNOLOGICAL WATER MANAGEMENT SYSTEM

GROUND WATER BASINS WEST-JAVA

1918 west canal flood construction

MANADO, SULAWESI

1973 west and east drain

2661mm/year

2125mm/year

PONTIANAK

2003 east canal flood construction

3181mm/year

Batavia 1618-1650

water management and works

MEDAN, SUMATRA

Van Breen 1649

1955

1649

1980

JAKARTA 1755mm/year

urbanization

INFILTRATION : 50 % - 70 % SURFACE RUNOFF : 30 % - 50 % 1441mm/year

1700

1600 dutch colonialism

0 100

1800

1900

2000

1945 independence

BOGOR

JAVA SEA

MM / YEAR

decades + power flood flood regimes intensity history

1600

KUPANG, TIMOR

250 500 750 1250 2500

Jakarta city located on a 5000 year old delta built on alluvial soil.

INFILTRATION : 5 % - 27 %

INFILTRATION : 50 % - 70 %

SURFACE RUNOFF : 73 % - 95 %

SURFACE RUNOFF : 30 % - 50 %

Water is both an essential material component and concept-dependant object at the same time.

FLOODING RAPID URBANISATION

BOGOR

BOGOR

JAVA SEA LEVEL RISE

JAVA SEA

Today, urban populations become specialized in their professions while water is bottled through mass production, discinnected from black water flowing along the nearby waterways

NORTH

SOUTH

WATER FOOTPRINT WATER FOOTPRINT

FLOOD MAP

LAND ELEVATION & CONFINED ACQUIFER

LAND SUBSIDENCE

JAVA SEA

INFILTRATION : 5 % - 27 %

-4.1 m

SURFACE RUNOFF : 73 % - 95 %

FLOODING

Muara Karang WTP

RAPID URBANISATION

BOGOR

-1.4 m

-2.1 mJAVA SEA LEVEL RISE

Taman Kota WTP

-0.7 m

Flooded parts in 2013

TANGGERANG

DC R4

Pejompongan WTp

Slum area SOUTH footprint 40% of Urban area vulnerable to flood

Pulogadung WTP

Buaran WTP

<0m Tar u

m

Cilandak WTP

Sarpong WTP

water treatment plant

5 - 10m

can

al

DC R5

max rate of subsidence 26cm/yr due to ground water extraction

BEKASI

CA CIPINANG-SUNTER RIVER

lakes-public water bodies

We st

CA KRAKUT RIVER

CA ANGKE RIVER

flood canal/ polder rivers/streams

NORTH

25 - 30m 35 - 40m >40m

scale 1:150000

Cisadane river

confined acquifer system

scale 1:150000

N

Sunter river

Ciliwung river

-0.25 m

max rate of subsidence 26cm/yr due to pressure from extensive development

Cikarung river

DEPOK

15 - 20m

N

0 km

2 km

0 km

10 km

CONSUMPTION

SOURCES

Bekasi river

2 km

DISTRIBUTION

10 km

WASTE WATER

scale 1:150000 N

0 km

2 km

10 km

TREATMENT AND DISPOSAL

CA CILIWUNG RIVER

Cibeet river

Citarum river

JAVA SEA Jathiluhur dam

Water Treatment Plant Weir Canal lakes-water bodies-private lakes-public

scale 1:150000 N

0 km

BOGOR

2 km

10 km

NEIGHBOURHOOD SCALE

SITE 1 HYDROLOGY & BIO DIVERSITY

SITE 2 SOCIO-HYDROLOGY

Site 1

scale 1:5000

scale 1:5000

Street along the river

Flood plains

scale 1:10000

river

ciliwung river 20m-23m wide

Smaller Streams 8-10m wide

canals 4m-5m wide

Banjir canal/polder 20m wide

streams canals flood canal\ polder

Banjir canal

Road

Kampung houses

slums built on flood plains

slums built on flood plains

TEAM: ADELIA, ABHIMANYU, AAKANKSHA, FARAH, XIN BIN, RAM, TEN, WINNY


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.