Abi pf

Page 1

Portfolio


CONTENTS..... Cafeteria

Primary school Affordable housing Market marphology

Daylight analysis and simulation Daylight analysis and simulation Other works


Cafeteria

cafeteria

PROJECT BRIEF The problem sheet was to design a cafeteria inside a college campus.

entry out door dinning

PROCESS The plan was generated to give a sense of direction to the open spaces.

DESIGN INTENT The form is evolve from the hexogon. The main space of cafeteria is dinning so central open space is given.

SITE PLAN

VIEWS

Interplay of open and semi open spaces

FLOOR PLAN

SECTION


Primary PROJECT BRIEF The problem sheet was to design a space for learning for the primary school children using ecofriendly materials.

school

FIRST FLOOR PLAN

PROCESS The plan was generated to give a lighting to the space of the building. SITE PLAN 3 4

GROUND FLOOR PLAN

2 5 1

1

parking

3

2

admin

4

play ground

5

kinder garden

primary block

The admin block and the primary block is connected with the connecting corridor. The common interaction space is given for interaction purposes.

Typical classroom layout


Affordable housing PROJECT BRIEF The problem sheet was to provide affordable housing for migrant population with basic aminities.

CONCEPT The main concept is arranging the units with the common communication space without affecting the privacy. Depending on family sizes these houses may be combined to form 1.5 or 2 times of the single unit.

One of the first principles of sustainable and environmentally friendly architecture is to reduce the embodied energy of the materials used in construction. Embodied energy is the sum of all energy inputs–for manufacturing, all transportation, human resources etc–that are needed to make a product. Transportation plays a major role here so, if a material can be sourced locally, it can reduce the embodied energy (and carbon footprint) quite substantially.

FORM EVOLUTION BED ROOM

BED ROOM TOILET

KITCHEN

TOILET

BED ROOM

FOOTPATH ,DRIVEWAY AND PARKING OPEN CELLPERMIABLE PAVING porous pavements let air and water pass through. filtering pollutants on the spot reduces the heat island effect and keeps the surrounding cool open cell concerete block is one solution that have enough open space that water can drain and grass can grow.

TOILET

LIVING

LIVING

KITCHEN

KITCHEN

KITCHEN

LIVING

TOILET

LIVING

BED ROOM

COURTYARD

BED ROOM

TOILET

LIVING

KITCHEN

KITCHEN

KITCHEN

LIVING

LIVING

TOILET

MATERIAL USAGE EPS (expanded polysterine) pannels are used in the interior walls and

BED ROOM

LIVING

TOILET

exterior walls

KITCHEN

TOILET BED ROOM

BED ROOM

FLEXIBILITY OF UNITS BED ROOM TOILET

BED ROOM TOILET

KITCHEN

KITCHEN

Module 2

BED ROOM

KITCHEN

Module 1

BED ROOM TOILET

TOILET

TOILET

LIVING

BED ROOM

LIVING

Module 3

LIVING


Market

SITE PLAN

marphology

PROJECT BRIEF The problem sheet was to analyse the marphological pattern of market of a town and the proposal is to given based on analysis.

PROCESS The analysis was based on 0-5 km around the site location.

Male working population is more than female working population. About 3,37,419 people worked in nagapatinam from neighborhood town and rural areas

based on user: based on location: 1 parking based on analysis:

2 block

The proposed site is located near the public office road. This road is a main accses for colleges. Total number of college 15 in this area

3 play ground 4 open air theatre

PROPOSAL IS BASED ON DEMAND AND SUPPLY ANALYSIS:

SITE LOCATION -

Nagapatinam

Empty land Post of

MM

ON

fice ro

CO

Residence

RO

PROPOSED SITE

ad

OM IND

OO

WA

ITIN

G

SP

RP

LAY

AR

EA

AC

E CO

MM

KIT

CH

EN

ST

thu Thambh park

ON

OR

E

Residences

rai

WA

ITIN

G

SP

AC

E

PA

NT

RY

Based on analysis the market value of the land and building cost is approximetly 51,75,000 with in 4years the client get the inversement amount

0FF

ICE DIN

NIN

G

SP

AC

E

PROPOSAL

GROUND FLOOR PLAN

FIRST FLOOR PLAN

SECOND FLOOR PLAN

:

DORMITORY

A hall of residence or hostel, is a building primarily providing sleeping and residential quarters for large numbers of people, often boarding school, college or university students and working people.


Day light simulation and analysis Simulation result for ground floor

Project Name : Iocl , Noida Certification : IGBC GH

R

E IDO ID W ORR MM E C 00 10 RVIC SE

The prime intent of the criterion is to ensure connectivity between the interior and the exterior environment, by providing adequate day lighting within the living spaces. The analysis would help in: Optimizing the type of glass used Assessing the availability of daylight in living areas and finalizing the credit points as per IGBC Green Homes Types of living spaces Kitchen Kitchen Living

Space name

Non Veg Kitchen Veg Kitchen Dinning

VLT of Glazing

Total day Recommended lighted DF as per SPF1 area GROUND FLOOR FLAT

Whether complying

Effective Daylight Area

23.36

0.49

0

2.5

NO

0

19.75 41.57

0.49 0.49

0 0

2.5 2.5

NO NO

0 0

84.68

Total

-

Area of the space

0

TPCO

POT WASH NON VEG KITCHEN

STORE

STORE NON VEG R COUNTE

TUCK SHOP

G.TOI

L. HAND WASH

BUFFET COUNTER

VE CO G UN T

ER

VEG KITCHEN

G. HAND WASH

CANTEEN 72 PERSONS CAPACITY

M FRO EXIT ENT M BASE

L.TOI

TICKET BOOTH

TEA / COFFEE VENDING MACHINES WATER DISPENSER

EXECUTIVE DINING AREA

RAMP UP FOR PHYSICALLY CHALLENGED PERSONS

Simulation result for First floor

UP

FHCO

LOBBY

CONNECTING CORRIDOR ABOVE

0

% of Total day lighted area

69%

% of Effective day lighted area

39% SHOWE

R

Types of living spaces Living

Space name

Dormitory

Total

Area of the space

41.57

84.68

VLT of Glazing

Total day Recommended lighted DF as per SPF1 area FIRST FLOOR FLAT 0.49

20.8

2.5

Whether complying

Effective Daylight Area

TPCO

TOILET

CANTEEN STAFF DORMITORY

WC

WC SHOWER

WC

SHOWER

Yes

20.8

20.8 20.8

% of Total day lighted area

23.03%

% of Effective day lighted area

23.03%

SHOWER

DN

TERRACE

UP

Canteen

ecotect model

Sun

path diagram for canteen

FHCO

LOBBY

CONNECTING CORRIDOR ABOVE


Day light simulation and analysis Project Name : Simple tree light house, Bangladesh The prime intent of the criterion is to ensure connectivity between the inteCertification : LEED rior and the exterior environment, by providing adequate day lighting within

Project Name

the living spaces. The analysis would help in: Optimizing the type of glass used Assessing the availability of daylight in living areas and finalizing the

Point

Specifications

Description Type VLT (%) SHGC U-Value

Properties Single Glazed 59 0.32 1.50

as per LEED

Percentage of day lighting in regularly occupied spaces

Points

≥75%

1

Lighting for basement floor SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

PERCENTAGE OF DAYLIGHTED AREA

Certification Total Regularly Occupied Space Regularly Occupied Space With Specified Illuminance Percentage Day lighted Area Simulation Tool Used

30.77

30.77

TOTAL

30.77

30.77

100.00%

DAYLIGHTED AREA

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

100.0%

DN

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

UP

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

57.66

57.66

100.00%

Commercial space

205.81

205.81

100.00%

TOTAL

263.47

263.47

FIREMAN/ SERVICE LIFT LOBBY

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY LEVEL {±} 0.00 m

GREEN

I

N

F

O

RAMP DOWN TOWARDS BASEMENT>

LOUNGE

500

RAMP UP TOWARDS GROUND FLOOR>

UP

DN

RAIN GUTTER

LEVEL {±} 0.00 m

GREEN

UP

LEVEL {-} 1.05 m

GREEN

GREEN

N

CONTROL

GREEN

Simulation result for longue

GROUND FLOOR PLAN

-

PERCENTAGE OF DAYLIGHTED AREA

Lounge

GREEN

UP

98.92% ECOTECT

DAYLIGHTED AREA

GROUND FLOOR

GREEN

SERVICE RAMP UP TOWARDS PLINTH>

4243.35 4197.68

Lighting for ground floor

BASEMENT 01 FLOOR Lounge

tree light house Commercial Dhaka, Bangladesh Tropical wet and dry climate

Project Type Location Climate Type

credit points as per LEED V 3.0 – Core and Shell

Glazing

Simple

Simulation result for commercial area

100.0%


Day light simulation and analysis FIREMAN/ SERVICE LIFT LOBBY

UP

DN

DN

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

UP

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

1ST FLOOR Commercial space

202.43

184.21

TOTAL

202.43

184.21

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

91.00%

91.00%

FIREMAN/ SERVICE LIFT LOBBY

UP

DN

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

UP

DN

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

2ND FLOOR Commercial space

303.29

272.66

TOTAL

303.29

272.66

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

UP

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

89.90%

FIREMAN/ SERVICE LIFT LOBBY

UP

DN

DN

89.90%

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

89.20%

89.2%

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

99.2%

99.2%

3RD FLOOR

UP

Commercial space

303.3

270.54

TOTAL

303.30

270.54

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

FIREMAN/ SERVICE LIFT LOBBY

DN

DN

UP

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

4TH FLOOR Commercial space

281.64

279.4

TOTAL

281.6

279.4


Day light simulation and analysis UP

FIREMAN/ SERVICE LIFT LOBBY

DN

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

100.0%

100.0%

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

5TH FLOOR

UP

Commercial space

303.28

303.3

TOTAL

303.3

303.3

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

FIREMAN/ SERVICE LIFT LOBBY

DN

DN

UP

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

6TH FLOOR

UP

Commercial space

280.68

279.6

TOTAL

280.7

279.6

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

99.6%

99.6%

FIREMAN/ SERVICE LIFT LOBBY

DN

DN

UP

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

7TH FLOOR

UP

Commercial space

282.18

279.9

TOTAL

282.2

279.9

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

FIREMAN/ SERVICE LIFT LOBBY

DN

DN

UP

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

99.2%

PERCENTAGE OF DAYLIGHTED AREA

99.2%

DAYLIGHTED AREA

8TH & 9TH FLOOR Commercial space

279.75

264.1

TOTAL

279.8

264.1

94.4%

94.4%


Day light simulation and analysis FIREMAN/ SERVICE LIFT LOBBY

UP

DN

DN

UP

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

10TH & 11 TH FLOOR Commercial space

302.87

300.8

TOTAL

302.9

300.8

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

99.3%

99.3%

FIREMAN/ SERVICE LIFT LOBBY

UP

DN

DN

UP

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

99.3%

99.3%

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

12TH FLOOR Commercial space

304.77

302.6

TOTAL

304.8

302.6

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

FIREMAN/ SERVICE LIFT LOBBY

UP

DN

DN

UP

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

LIFT LOBBY

13TH & 14TH FLOOR Commercial space

248.37

246.4

TOTAL

248.4

246.4

SPACE NAME

REGULARLY OCCUPIED TOTAL REGUAREA WITH LARLY OCCUPIED SPECIFIED ILAREA (Sqm) LUMINANCE LVL. (Sqm)

99.2%

99.2%

FIREMAN/ SERVICE LIFT LOBBY DN

DN

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2250 X 2300 1000 KG/ 15 PAX DOOR 1000 SPEED 2.5 m/s

LIFT CORE 2150 X 2800 (FIREMAN/ FREIGHT) 1350 KG/ 20 PAX DOOR 1000 SPEED 2.5 m/s

PLANT ROOM LOUNGE

CHANGE

LIFT LOBBY

UP

SWIMMING POOL [INFINITY EDGE]

PERCENTAGE OF DAYLIGHTED AREA

DAYLIGHTED AREA

ROOF FLOOR POOL SIDE DECK/ TERRACE & BARBECUE

Lounge

25.55

22.4

TOTAL

25.6

22.4

87.5%

87.5%

On the basis of the above observations, it is deduced that 99.82% of the regularly occupied areas are achieving daylight illuminance levels of minimum 269 lux& maximum of 5382 lux at the working plane. Project is aiming 1 point under EQ Cr 8.1 as Daylight Area is 99.9% which is > 75% as per credit requirement and therefore project can also achieve 1 additional point under Innovation (Daylight Area > 95%).


Cardboard furniture model..........

Other works

Photography

Renderings Composition of shapes..........

Abstract art...........

‘The first 10,000 photographs are your worst’ -Henry cartier- bresson

Dispersion using point..........

Clay model..........

illusion..........

Texture........


Thank you


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.