1 2 3 4 5 6
VIEW FROM VASKILAHTI
birdview east, highly built stage
FORM The geometry of the project bases on two tilted elongated building masses flapping over each other. These connected masses are geometrically analogic to each other but with their materials, functions and details they form opposites to each other. One earthy perforated Corten steel mass literarly rises from the ground as metro lifts which it enfolds. Besides metro it runs a lot of simple need based functions inside of it (grocery, restaurants, bath, laundry). It attaches to the water, brings people and activities closer to the sea and enriches the boulevard next to it. The other with its lighter visual appearance leans on the top of it and stretches over the road and towards the water with more complex functions and architecture. Colorful boxes push through its glass curtain wall like containers getting wild in a ship. Vertical steel cylinders sustain part of the weight of the building as well as they take care of the natural ventilation and vertical movement inside the building. Despite of its partly floating appearance modular glass building attaches strongly to the urban pedestrian way and its prefabricated blocks form interesting and human scale streetscape.
pedestrian street in highly built state
facade system simplified
”LÄNSIVÄYLÄN PORTTI” Steel studio 2011 & student competition
PianoMobile
12 3 4 5 6
SITE PLAN 1:500
Melontakerho
Vaskilahdensalmi
view along northern ramp
a
VI
view towards main entrance VI
STEEL Steel is on its best, ecological, most beautiful when it appears in - lightweight structures, high spans - devices whose parts are renewable and recyclable - prefabricated products, which are installed in place literally as they are planned - closed monitored processes of steel reduce errors in the product and therefore in the building process
Koiv usaa ren puis toka tu
II
XI IV
+3,0
!
+9,5
!
III c
!
Metro
II
! +3,5
!
+9,0
b
+3,5
!
CONSTRUCTION CHALLENGES - How to build large-scale projects with high quality and costeffectiveness? - How to implement and control a community project, in which the ownership of the premises and user relationships vary? c - How to get users participate into expensive and heavy construcb tion and design process? - How to make building last time physically and functionally? PLAN > solve everything in one complex! > make an open lightweight modular steel frame and versatile modular facade > prepare infra which is easy to maintain and qualified common space on the core of the building > design space and building elements attractive products to place II on the facade zone VI > rent and sell modules and plots inside the the building >let the users and investors take care of the rest > allow the building live and see how it produces good
+9,5
I +3,0
!
!
IX
b
+3,0 I(II)
avanto
+1,5 V
How does the city and the community benefits from this? -How the community benefits from entrepreneurs, real public +3,0 space, activities and services?
a +0,0
I
Vaskilahti
V
”LÄNSIVÄYLÄN PORTTI” Steel studio 2011 & student competition
PianoMobile
12 3 4 5 6
1ST. FLOOR “DESK” review 1:200 services, shops & showrooms PE IL BU GV DIN
JK
ES VIC SE0 R m
COMMUNITY One needed space for events. One needed a place to organize a weekend workshop mean while one needed a place to put his/her drawing or reception table but cannot afford renting 45sqm of extra space, which is quite the smallest option in conservative building markets. One also could have need for entrepreneur services to gain more visibility or safety but cannot afford nor find it because of renting 45sqm of empty space alone in the outskirts of city. With shared spaces the needed investment is less and the collaborators and customers are near.
ED ITT RM
udio +st ents lem all-e s+w room m2 100
OL
2
UM
86
E
1
SPACE ELEMENT
EAK BR
T PLO 2 T PLO
STUDIO
38 PLO
ent lem io-e stud 2 m 26
UP ET ME S
T
S
IES ILIT FAC PLIC PU
X BO
the 2 13m
PR
6
ent em p-el ksho wor 2 m 65
INT
T PLO
FREEDOM TO ACCOSSIATE/ BUILDABLE FLOORSPACE
7 T PLO
SHOWROOM
CONTEMPORARY Space is limited, why do we treat buildings as monuments? When it is something is erected/built the space is dedicated for one thing and for one thing only, despite of the fact that at least 1/3 or even 50% of the time the built space is without use. All that time the enfolded structure is ventilated, heated, lit and wached over but it’s running empty. Does this make any sense? Buildings take about 40% of all the used energy. If we used built space more socially, more effieciently, we would need 1/3 less off new constructions and that would also mean 1/3 savings in energy consumption.
9
!
T PLO
34 PLOT
RECE
" LAZA KET P "MAR
PTION
2
TION/ EXHIBI S SALE
t 1,5 fl -elemen studio2 26 m
e n facad +gree
USE
WORKSHOP
MON COM
m 1060
dios ined stu comb2 55 m
31
rs locke
PLOT
GALLERIE
14 PLOT
VERSATILE FACADE
29 PLOT S DESK RVICE LES/SE
SA
CO
BOX
ON
MM
CAFE
+ studio2 45 m
2
BU ITTED PERM
PLOT
PLOT
ILDIN
27
FACADE ELEMENTS
N TCHE RAL KI CENT
LUME G VO
BOUTIQUE
E US
63,0 m
17
19 PLOT S CILITIE IC FA PUPL
t lemen facad2e-e 10m
POP-UP-SHOP
24 PLOT
KIOSK
TECHNICAL HELP DESK
papers
22
Wholeness is more than the sum of its parts! Get big -> go SMALL Park your office here, we will take care of the rest! It is a good idea! You should just FRAME it! Get you own BOX OFFICE, WORKSHOP CAMP or just a CHAIR and start working. You can rent it for an hour, for an weekend, or get your own building stock, partnership!
PLOT
!
+9,5
“RENT YOUR OWN ROOFGARDDEN”
INFO
+9,500
! AUDITORIUM/KINO
+9,500
230 m2 +6,00
The estimated extents of the complex are : +9,500
tor projec TICKE
TS
" CAFE CASE "SHOW 2
"BACKSTAGE"
COFFEE/BAR
760m
Upper building 13000m2 +/- 4500m2(facade zone) Base 2200m2 (metro excluded)
OR “OFFICE FOR A DAY” “WORKSHOP APPARTMENT FOR A WEEKEND” “DESK FOR AN HOUR” “LOCKER FOR A MONTH” “BANQUET ROOM FOR A NIGHT”
STAG E
+9,500
”LÄNSIVÄYLÄN PORTTI” Steel studio 2011 & opiskelijakilpailu
PianoMobile
12 3 4 5 6
2ND. (- 4th) FLOOR “ASSOCIATE” review 1:250 workshops labs & lectures
E EAT CR0 m 2
86
EAK BR
io stud yle "-st turo "ven
RM STO AIN S BR S
X BO The
IES ILIT AC CF PLI PU OP SH RK O W
00 +14,5
00 +14,5
RY LIBRA
RGY" "SYmNE 2
1060
LAB
rs locke
review of eastern facade
00 +14,5
E STAG URES LECT
WHAT IS THERE? +FLEXIBLE MODULAR STRUCTURE +ALL THE INFRA THAT AN ENTREPRENEUER NEEDS +ADAPTABLE BUILDING SYSTEM +VERSATILE SPACE
E STAG ES CILITI IC FA PUPL
KIOSK
00 +14,5
extension INFO
make your own colony of “venturo-blocks”
00 +14,5
WHAT CAN BE ADDED ++PREFABRICATED SPATIAL OR WALL BLOCK S ++LARGE VARIATION OF ELEMENTS TO SELECT AND DESIGN FROM
+12,2 +13,1
p" -EX "roofto
POSP
OT
tor projec
2
225 m
CONFERENCE 2 ROOM 103 m
00 +14,5
+42,2
+30,5
The BOX
+++COMMUNITY & CREATIVITY +++OPENNES IN SAFE ENVIRONMENT +++ECOLOGY
stage
steel cylinder/ lift
SECTION a-a 1:250
recreation-center
club-house
modular curtain wall/ steel shades
banquet-room
conference-room
+14,7
expo-spot "backstage"
+9,5
auditorium
painted, crosslaminated timber
perforated Corten steel
+3,0 +1,5
5TH. (- 6TH.) FLOOR “REGENERATE” REVIEW 1:250 banquet rooms, sports, culture & leisure
2 3 4 5 6
TEL OS PH NA
TE REA ors 2 REt/C 2flo 00m 1.s m2 /15 750
NAP
+26,50
STEL HO
+26,50
top floor recreation & banquet s clas
om n ro gree
s clas
yoga
S
ace terr
S S
a& saun
RECE
ace terr
PTION
+26,50
+26,50
N TERR
GREE
ACE
OUSE
H KLU,5B floors
2
1st/1 2 /300m 150m
night view from Vaskilahdensalmi
race a & ter saun
OOM UET R BANGfloors ,5 2nd/1 m2 00 100/3
+22,50
+22,50
ACE
TERR
ramp -view towards Vakilahti
“rooftop” exhibition spot
”LÄNSIVÄYLÄN PORTTI” “venturo” -style view Vaskilahdensalmi Steel studio 2011 & opiskelijakilpailu
“showcase” -cafe
studio + green room
PianoMobile
workshop apartment
12 3 4 5 6
+28,7
+23,5
elevator
steel frame prefabricated block polyfibre panel
+9,5
shared functions
+18,9
steel frame prefabricated block wood panel
+20,0
printed glass wall & tilted steel columns
Corten steel
metro-entrance
bus-stop
SECTION c-c 1:250 SECTION b-b 1:250 +18,9 +17,2
+14,5
+9,5
+7,0
metro-entrance
+3,5
! BUSSTOP
!
LUNCH SPOT
LOCAL FOOD S GROSER Y
lockers
lockers
SNACKBAR
loading nce staff/ maintena
TRAINING
S TREATMENT
PUPLIC FACILITIES LE
METRO
ce aintenan storage/m
INFO
S S
!
POOL
!
LAUNDRY & CARE
R& CENTE SAUNA R'S DOCK2 SAILO 500 m
!
+3,5
”LÄNSIVÄYLÄN PORTTI” Steel studio 2011 & opiskelijakilpailu
!
PianoMobile