AE7 Firm portfolio

Page 1

AE7 PORTFOLIO MARCH 2022

ABU DHABI, AMMAN, BRATISLAVA, DOHA, DUBAI, JACKSONVILLE, LANCASTER, OBERHAUSEN, PITTSBURGH, RAS AL KHAIMAH, RIYADH WWW.AE7.COM


AE7 PORTFOLIO MARCH 2022

DESIGN AT WORLD SCALE

ABU DHABI, AMMAN, BRATISLAVA, DOHA, DUBAI, JACKSONVILLE, LANCASTER, OBERHAUSEN, PITTSBURGH, RAS AL KHAIMAH, RIYADH WWW.AE7.COM


Design at World Scale Limitless creativity. Expert strategy. Unparalleled results. Established by internationally renowned American design professionals with over 40 years of experience in the Middle East, Europe, Asia and the USA, AE7 is a global leader in destination development, healthcare, higher education, residential, corporate and commercial design, and planning. The Partners from AE7 have been working as a group for over 20 years. Now with offices in Abu Dhabi, Dubai, Europe, Jordan, and the USA, the firm’s design practice is led by industry innovators committed to delivering the extraordinary. At AE7, our goal is to listen to our clients and to comprehensively understand their needs so we can provide superior service, iterate to the best possible outcome, and deliver groundbreaking projects that are responsive to our clients’ vision on every level. We are passionate about the power of exceptional design: Our philosophy is to nurture a better future and environment, to improve life and to motivate the human spirit through thoughtful and inspired design. With a multidisciplinary team of more than 350 people who collaborate in 8 offices across three continents, we bring together a diverse set of international talent to provide full-service prestigious projects in the world. Our expertise covers nine market sectors: healthcare and wellness; development; science and technology; higher education; destination developments; commercial and corporate; hospitality; residential; and primary and secondary schools. Our innovative designs continue to enrich and inspire, from sophisticated hospitals to skyscrapers exceeding 700 meters in height to the largest crystalline lagoon in the heart of one of the most premier luxury communities in the world. No matter what we undertake, all of our planning and design work stems from creative solutions, attentiveness to client needs, knowledge-based strategy, and a drive to make life better through inspiring and intuitive design. A holistic, interdisciplinary approach allows us to realize the most unique end-user experiences, offer the best commercial results to clients, and consistently create new benchmarks for excellence around the globe.


$10+BILLION 12YEARS OF DESIGN WORK OVER THE PAST

14.1 sq km 0.6

42

sq km

sq km

238 sq km 55.3 sq km

SERVICES Development Inception Development Finance Development Management Pre-Development Studies Economic Feasibility Studies Market Analysis Vision Architecture Branding Construction Management Engineering Infrastructure Design Interior Design Landscape Architecture Masterplanning Project Management Retail Consultancy Site Supervision Structural Design Sustainable Design

MARKET SECTORS Residential Developments Healthcare Hospitality Tall Buildings Retail + F&B Masterplanning Destination Development Education Commercial

Taking Projects from

Visioning To

Masterplanning Design

11Offices across three continents

Abu Dhabi Amman Bratislava Doha Dubai Jacksonville Lancaster Oberhausen Pittsburgh Ras Al Khaimah Riyadh

350sq km

of masterplanning & developments

Creating the DNA of the City

Through

Construction

Design at World Scale


Deira Islands – 16.7 sq km

Dubai, UAE Over 90 sq km Master Planned

Deira Islands Towers & Boulevard Night Markets

Deira Waterfront Development 0.6 sq km

Fattan Sky Towers Entisar Tower Fattan Downtown Towers

ubai Water Canal – 1.85 sq km

Meydan One 3.7 sq km

District One – 3.9 sq km

Meydan Horizon 1.7 sq km

Meydan Residence 1

Meydan Avenue

JBH Renovations

District 7 – 1.8 sq km

Sofitel Dubai

District 11 – 3.3 sq k Palm Jumeirah Masterplan Improvement Meydan Beach Hotel

District 12 – 9.3 sq k

The Valley 8.9 sq km

Marsa Meydan 1.75 sq km Nakheel Valley 22 sq km


Abu Dhabi, UAE Over 140 sq km Master Planned

Mina Zayed Zone 2 3 sq km Fisherman’s Wharf 0.6 sq km

Al Dar Yas Epicurean

Family Park Courniche Pier W10

Al Dar Water Edge

Emirates Palace Yacht Club

Khalifa Park – 0.6 sq km

Al Hosn & Al Manhal Vision 3.7 sq km Zayed Military Hospital

Sports Park

SKMC Dialysis Center

Al Jinaan – 0.2 sq km Bloom District – 2.2 sq km

Al Riyadh City 84.7 sq km

9712 BMC 0.2 sq km Bawabat Al Sharq – 1.5 sq km Mafraq Hospital – 0.16 sq km New Zayed City – 39.4 sq km


Creating the DNA of the City Dubai - Waterfront Life The Heritage Canal from Past to Future

SITE 16

Over 26 Kilometers of Canal SITE 1

SITE 15

SITE 2 SITE 14 SITE 3 SITE 4 SITE 9 SITE 13 SITE 5 SITE 6 SITE 7

SITE 12

SITE 8

SITE 11

SITE 10


COMMUNITY EXPLORATION

CONNECTION

HEALTH

RESPECT

DESTINATION

LIVE LEARN

FAMILY

INCLUSION

PLAY

IMPACT

NATURE

INNOVATION

WELLNESS

CELEBRATION

The Kaleidoscope of Living Experiences


Dubai Water Canal – Site 1, 2 & 3 USD 2 Bil.

SITE 1

Status of Project Phase 1 • Construction Completed • 5 KM Boardwalk • 3 Iconic Award-Winning Bridges • RTA Water Taxis Operational

SITE 2 SITE 3

Phase 2 • Under Construction • 3.1 KM Boardwalk • Peninsula Reclamation Completed

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

1.85 mil sq.m 20 mil sq.ft

1.9 mil sq.m 20.1 mil sq.ft

8,400


Iconic Pedestrian Bridges Dubai Water Canal Development

Pedestrian Bridge 3

Pedestrian Bridge 2

Pedestrian Bridge 1

Boardwalk


Status – Construction Completed

Bridge of Tolerance Outdoor Space + Design of the Year Award

Dubai Water Canal Development REGIONAL + URBAN DESIGN: Certificate of Merit

Pedestrian Bridges

2017 2017


Location Plan

Site 1 – Peninsula Beachfront and Marina Lifestyle Luxury Marina Apartments and Hotels

SITE 1


Location Plan

Site 2 – Water’s Edge Living Luxury Water Villas and Apartments with Private Boat Docks

SITE 2


Location Plan

Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa A Mixed-Use Residential Development Status – Under Construction

SITE 3

Under Construction


Location Plan

Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa B Mixed-Use Residential Development Status – Under Construction

SITE 3

Under Construction



Location Plan

Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa Towers Residential Development Status – Under Construction

SITE 3


Location Plan

Site 3 – Canal Community – Boardwalk, Plazas and Parks Gate Tower – Hotel, Branded Apartments, Retail and Residential Development

SITE 3


Location Plan

Site 8 – Meydan One Masterplan Destination Development on the Canal Developed Land

47.5%

Status of Project Under Construction

Population (estimate)

84,000

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

ROW & Infrastructure

Community Amenities

30.7%

5.2%

Open Space

16.6%

Land Area

GFA

Residential Units

3.7 mil sq.m 40.2 mil sq.ft

5 mil sq.m 54.3 mil sq.ft

27,765

SITE 8


Meydan One Mall USD 1.6 billion Status of Project Under Construction

Total GFA: 660,952 sqm Total BUA: 1,554,826 sqm Total GLA: 336,652 sqm

12,000 parking spaces Parking Area: 689,675 sqm 540 Retail Stores 188 Restaurants 30 Anchor Stores 80 Flagship Luxury Stores 13,200 sqm Hypermarket 5,430 sqm Medical Center

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Retail Consultancy Site Supervision Structural Design Sustainable Design Vision

Skylight Canyon Atrium 60m wide by 400m long 21 Screen Cinema 650m Ski Slope and Winter Village – expandable to 1km 25,000 sqm Multi-Purpose Experience Zone 25,800 sqm Dancing Water Fountain 5,248 sqm Kids Exploration Zone 1,945 sqm Mosque 100x80 m Retractable Skylight Grand Civic Plaza with capacity of over 30,000 occupants Luxury Plaza Hotel - 232 keys Class A Office Building – 20,000 sqm


Meydan One Mall USD 1.6 billion


Location Plan

Site 4 – Floating City Godolphin Racetrack and Stables Redevelopment Status of Project Vision Master Plan and Market Study Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

SITE 4

Land Area

GFA

Residential Units

1.15 mil sq.m 12.42 mil sq.ft

1.9 mil sq.m 20.4 mil sq.ft

9,000



Location Plan

Site 5 – Private Lagoon Community Man-made Freshwater Lagoon with Private Beaches and Boardwalk

SITE 5


District One, Mohammad Bin Rashid Al Maktoum City USD 4 Bil. Status of Project Phase 1 & 2 • Construction Completed • 628 Villas & Mansions handed over • Fresh Water Lagoons completed and operational • 14 KM Beach and Boardwalk • 200,000 SQM Fresh Water Lagoon Body of Water • 9 KM Dedicated Bicycle and Jogging Track

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

3.9 mil sq.m 42.7 mil sq.ft

2 mil sq.m 22 mil sq.ft

5,800 (628 Villas & Mansions)


2016

Contemporary Mansion Residential Interior & Exterior Award


District One Phase 1 and 2 Community 4, 5 and 6 Bedrooms – Handover in early 2017 Status – Construction Completed


District One Mansions – Modern Arabic Style 7+ Bedrooms, BUA 2,438 m2 | 26,242 ft² Status – Construction Completed


7+ Bedrooms, BUA 2,523 m2 / 27,157 ft² Status – Construction Completed

Contemporary Mansion Residential Interior & Exterior Award

District One Mansions – Contemporary Style

2016


District One Mansions – Mediterranean Style 7+ Bedrooms, BUA 2,362 m2 | 25,424 ft² Status – Construction Completed


District One, Mohammad Bin Rashid Al Maktoum City Phase 3 Status of Project Phase 3A • 9 Apartments Completed • 3 KM Boardwalk and Beach • 90,000 SQM Fresh Water Lagoon

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Apartments

1.1 mil sq.m 12.7 mil sq.ft

663,000 sq.m 7.1 mil sq.ft

5,755



Site 6 – District 7 Transit Oriented Development Masterplanning and Infrastructure Design for Plot Sales, USD 700 mil. Status of Project Under Construction

Location Plan

Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Sustainable Design Vision

SITE 6

Land Area

GFA

Development Plots

2.2 mil sq.m 23.7 mil sq.ft

2.2 mil sq.m 23.3 mil sq.ft

53


Site 7 – District 12 Connected Communities Vision Masterplanning, USD 10 Billion

Location Plan Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Vision

Land Area

GFA

8.4 mil sq.m 90.4 mil sq.ft

8 mil sq.m 86 mil sq.ft

SITE 7


Location Plan

Site 9 – Ras Al Khor Wildlife Sanctuary Project Size: 630,000 sqm, 6,781,300 sqft Status of Project Under Development

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

SITE 9


Site 9 – Ras Al Khor Wildlife Sanctuary Ecological Light Touch Approach to Regenerative Design


Site 11 – Meydan Creek Regenerative Eco-Living Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil.

Economic Feasibility Studies Market Analysis Masterplanning Pre-Development Studies Vision

Location Plan

SITE 11


Site 10 – Meydan Horizon Canal Front District Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil. Status of Project • Vision Masterplan Completed

Market Analysis Pre-Development Studies Vision

Land Area

GFA

FAR

1.4 mil sq.m 15.2 mil sq.ft

1.1 mil sq.m 12 mil sq.ft

0.8


Location Plan

Site 13 – Creek Park Family Destination “Creek Life” Man-made Freshwater Lagoon with Private Beaches and Boardwalk

Architecture Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

SITE 13





Location Plan

Site 14 – Canal Front Urban Renewal “City Life” Value Creation and Rejuvenation of Under-Utilized Parking Plots

Architecture Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

SITE 14

Land Area

GFA

59,983 sq.m 645,417 sq.ft

92,550 sq.m 995,838 sq.ft




Location Plan

Site 15 – Deira Waterfront Development Culture and Heritage Waterfront, USD 1.4 billion Status of Project Plot 3 • Construction Completed Plot 4 • Construction Completed • First Transit Oriented Development in Middle East Plot 11 • Construction Completed

SITE 15

Plot 12 • Under Construction Plot 13 • Under Construction

Architecture Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

610,000 sq.m 6,566,000 sq.ft

584,000 sq.m 6,286,000 sq.ft

2,200


Plot 03

Site 15 – Deira Waterfront Development Culture and Heritage Waterfront, USD 1.4 billion

Total BUA: 163,650 sqm MAIN PLAZA

Total GFA: 100,994 sqm No. of Parking: 959

12 14 03

Consist of 4 Mixed use Towers, 1 main plaza (2 residential towers, 1 Office tower and 1 Hotel Tower)

04 11

16

Plot 04

13

Total BUA: 37,140 sqm Total GFA: 25,000 sqm DEIRA SOUQ

19

No. of Parking: 158 Consist of Transition hub Designed within a Mixed-Use Building (Retail Podium, Bus Station, Metro Station, Office Tower, Hotel Tower)

GOLD SOUQ

Plot 11

Plot 12

Plot 13

Total BUA: 14,000 sqm

Total BUA: 54,050 sqm

Total BUA: 108,260 sqm

Total GFA: 11,412 sqm

Total GFA: 28,430 sqm

Total GFA: 62,659 sqm

No. of Parking: 0

No. of Parking: 307

No. of Parking: 725

Consist of 3 G+5 Mixed Use Buildings

Consist of 5 Mixed use Buildings with 2 common basements

Consist of 13 Mixed use Buildings

Plot 14

Plot 16

Plot 19

Total BUA: 64,300

Total BUA: 60,650 sqm

Total BUA: 35,170 sqm

Total GFA: 42,686 sqm

Total GFA: 36,977 sqm

Total GFA: 25,187 sqm

No. of Parking: 393

No. of Parking: 436

No. of Parking: 144

Consist of 4 Mixed use Buildings

Consist of 14 Mixed use Buildings.

Consist of 5 Star Hotel Compound


Plot 03 – Hotel, Residential and Commercial Deira Waterfront Development Status – Construction Completed


One Deira, Plot 04 – Transit Oriented Development Deira Waterfront Development Status – Construction Completed


Plot 16 – Mixed Use Residential Deira Waterfront Development Status – Under Design


Plot 14 and 19 – Hotels Deira Waterfront Development Status – Desgin Completed

Plot 19 Five Star Hotel

Plot 19 Four Star Hotel, Service Apartment

Plot 19 Four Star Hotel, Service Apartment

Plot 19 Five Star Hotel


Location Plan

Site 16 – Deira Islands “Island Community” Culture and Heritage Waterfront, USD 3.7 billion Status of Project Phase 1 • Night Market Construction Completed • Infrastructure and ROW • Under Construction Phase 2 • Planning Completed

SITE 16

Engineering Infrastructure Design Landscape Architecture Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Total Land Area

16 mil. sq.m 172.2 mil. sq.ft

Phase 1 Land Area

Phase 1 GFA

Phase 1 Development Plots

8.3 mil. sq.m 89.3 mil. sq.ft

7.8 mil. sq.m 83.9 mil. sq.ft

807



Marsa Meydan Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

1.75 mil sq.m 18.8 mil sq.ft

1.4 mil sq.m 15.4 mil sq.ft

14,200




The Square, Al Othaim Neighborhood, KSA Land Area: 1,227,085 sq.ft, 114,000 sq.m Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

GFA

GLA

655,576 sqm 7,056,560 sqft

450,000 sqm 4,843,760 sqft

# RETAIL: 350 # F&B: 100 # HOTEL KEYS: 450




Murcia Mall, KSA 2,314,240 sq.ft, 215,000 sq.m


No. of Retail

180

No. of F&B

118

BUA

376,700 sqm 4,054,765 sqft

GLA

150,350 sqm 1,618,350 sqft



Escape Island Villas, Doha, Qatar




Water Villas Maldives Family Resort Villas


Maldives Family Resort Villas


Private Villa Dubai, UAE



Private Villa Dubai, UAE




Majlis


Formal Dining


Family Living & Dining


Family Den


Private Villa Dubai, UAE





Mount Nebo 3.5 mil sq.ft, 325,000 sq.m, USD 2 Bil.





Valley of Gabala, Azerbaijan Mountain Resort Rejuvenation and River Rehabilitaion, USD 4 Bil. Status of Project • Vision Masterplan Complete • Completed market research • Completed financial feasibility • Presented white paper on feasibility for free zone status • Completed Preliminary Development Strategy • Presented to the Government • Preliminary application for Export Finance

Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

10.1 mil sq.m 108.7 mil sq.ft

3.7 mil sq.m 39.8 mil sq.ft

3,200

2,600


Mountain Village I Event Plaza


Center Parcs

Center Parcs I Cottages



North Waterfront, Minsk, Belarus Prime Waterfront and Greenfield Plots Outside City Edge Status of Project • Concept Masterplan Complete • Master Plan submitted to the Authorities for Review and Approval • Detail Master Plan Stage in Progress

08

02

03 07

01 Architecture Branding Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

LEGEND

04

06

01 - Waterfront Community 02 - Woodland Living 03 - Wellness Community 04 - Arts & Culture District 05 - Riverfront Community 06 - Canal Side Community 07 - Lakeside Community 08 - Expo Communities

05 Total Land Area

Developed Land Area

GFA

Residential Units

13.5 mil sq.m 145.3 mil sq.ft

6.2 mil sq.m 66.7 mil sq.ft

8.2 mil sq.m 88.2 mil sq.ft

48,600


Concept Diagram

Land Use Plan

SWOT Analysis



Almaty Hills, Almaty, Kazakhstan Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel USD 208 Mil. Status of Project • Concept Masterplan Complete • Master Plan Approved by The Almaty Municipal Government City Planning Agency • Master Plan Approved by The Municipal Government Agency “Tourism and Foreign Affairs Department of Almaty City” • Detail Master Plan Stage in Progress

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Town Center GFA

3.48 mil. sq.m 37.44 mil. sq.ft

690,308 sq.m 7.43 mil. sq.ft

1,234

80

61,100 sq.m 657,436 sq.ft




8 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 2,345 square meter (25,232 square feet)


7 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 1,415 square meter (15,225 square feet)


5 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 668 square meter (7,188 square feet)



Ohio Riverfront Development, Pittsburgh, PA,USA Redevelopment of Ohio River Waterfront Warehouse Plots Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Approved by Community Review Board • Master Plan Approved by Board of Cultural District • Detail Master Plan Stage in Progress

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

60,703 sq.m 653,400 sq.ft

243,000 sq.m 2.6 mil sq.ft

1,600

400

12,000 sq.m 129,120 sq.ft



Ninth & Penn Mixed-use Development, Pittsburgh, PA, USA Urban Renewal – Development of City of Pittsburgh Parking Authority Parking Site Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

10.594 sq.m 114,000 sq.ft

74,350 sq.m 800,000 sq.ft

420

160

4,768 sq.m 51,300 sq.ft





Reed District Mixed-use Development, Nashville, TN, USA Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

37,009 sq.m 398,222 sq.ft

122,491 sq.m 1,318,000 sq.ft

324

250

2,221 sq.m 23,900 sq.ft





Site Plan Relationship Diagram

Broadway Corridor Diagram – Urban Anchor and Corner View Corridor

Broadway Corridor Diagram – Ground Level Permeability

Contextual Height Diagram


Bloom Riverfront Development, USA Urban Revitalization of Downtown Parking Site – Hotel, Luxury Residential, Mayo Clinic, Post-Op Service Apartments and Retail Status of Project • Concept Masterplan Completed • Detailed Masterplan Completed • Schematic Design for Hotel Design Completed • Master Plan Approved by City Planning Commission

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

8,985 sq.m 96,679 sq.ft

92,903 sq.m 1.0 mil. sq.ft

550

160

3,200 sq.m 34,432 sq.ft



Um Ramool Towers 637,000 sq.ft, 77,800 sq.m, USD 75 Mil.

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Pre-Development Studies Site Supervision Structural Design Sustainable Design



Al Marmoom Desert Conservation Reserve, Dubai

Bird Observation Tower 1

Bird Observation Tower 1

Al Qudra Flamingo & Swan Lake

Al Qudra Lakes Bird Observation Tower 2

Bird Observation Tower 2

Bird Observation Tower 1

Al Qudra Lakes

The Dune, Yoga Structure

Covered Amphitheatre


The Nest - Bird Observation Tower 1 at Al Marmoom Desert Conservation Reserve BUA 72 sqm. 775 sq.ft



The Cocoon - Bird Observation Tower 2 at Al Marmoom Desert Conservation Reserve BUA 72 sqm. 775 sq.ft


The Dune, Yoga Structure at Al Marmoom Desert Conservation Reserve BUA 60 sqm. 645 sq.ft


Covered Amphitheater at Al Marmoom Desert Conservation Reserve BUA 300 sqm. 3,229 sq.ft



Al Mafraq Hospital – Abu Dhabi, UAE 1.8 million sq.ft, 167,000 sq.m, USD 850 mil.







The Kaleidoscope of Living Experiences


AE7 PORTFOLIO MARCH 2022

THANK YOU.

ABU DHABI, AMMAN, BRATISLAVA, DOHA, DUBAI, JACKSONVILLE, LANCASTER, OBERHAUSEN, PITTSBURGH, RAS AL KHAIMAH, RIYADH WWW.AE7.COM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.