Creating the DNA of the City

Page 1

$10+BILLION 10YEARS OF DESIGN WORK OVER THE PAST

14.1 sq km 0.6

42

sq km

sq km

238 sq km 55.3 sq km

SERVICES Development Inception Development Finance Development Management Pre-Development Studies Economic Feasibility Studies Market Analysis Vision Architecture Branding Construction Management Engineering Infrastructure Design Interior Design Landscape Architecture Masterplanning Project Management Retail Consultancy Site Supervision Structural Design Sustainable Design

MARKET SECTORS Residential Developments Healthcare Hospitality Tall Buildings Retail + F&B Masterplanning Destination Development Education Commercial

Taking Projects from

Visioning To

Masterplanning Design

9Offices

across three continents Abu Dhabi Amman Bratislava Cleveland Doha Dubai Oberhausen Pittsburgh Riyadh

350sq km

of masterplanning & developments

Creating the DNA of the City

Through

Construction

Design at World Scale


Creating the DNA of the City – Waterfront Life The Heritage Canal from Past to Future SITE 16

Over 26 Kilometers of Canal

SITE 1

SITE 15

SITE 2 SITE 14 SITE 3 SITE 4 SITE 9

SITE 13

SITE 5 SITE 6 SITE 7

SITE 12

SITE 8

SITE 11

SITE 10


The Kaleidoscope of Living Experiences


COMMUNITY EXPLORATION

CONNECTION

DESTINATION

HEALTH

RESPECT

PLAY

IMPACT

NATURE

INNOVATION

LIVE LEARN

FAMILY

INCLUSION

WELLNESS

CELEBRATION


Dubai Water Canal – Site 1, 2 & 3 USD 2 Bil.

SITE 1

Status of Project Phase 1 • Construction Completed • 5 KM Boardwalk • 3 Iconic Award-Winning Bridges • RTA Water Taxis Operational

SITE 2 SITE 3

Phase 2 • Under Construction • 3.1 KM Boardwalk • Peninsula Reclamation Completed

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

1.85 mil sq.m 20 mil sq.ft

1.9 mil sq.m 20.1 mil sq.ft

8,400


Iconic Pedestrian Bridges Dubai Water Canal Development

Pedestrian Bridge 3

Pedestrian Bridge 2

Pedestrian Bridge 1

Boardwalk


Status – Construction Completed

Bridge of Tolerance Outdoor Space + Design of the Year Award

Dubai Water Canal Development REGIONAL + URBAN DESIGN: Certificate of Merit

Pedestrian Bridges

2017 2017


Location Plan

Site 1 – Peninsula Beachfront and Marina Lifestyle Luxury Marina Apartments and Hotels

SITE 1


Location Plan

Site 2 – Water’s Edge Living Luxury Water Villas and Apartments with Private Boat Docks

SITE 2


Location Plan

Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa A Mixed-Use Residential Development Status – Under Construction

SITE 3

Under Construction



Location Plan

Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa B Mixed-Use Residential Development Status – Under Construction

SITE 3

Under Construction




Location Plan

Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa Towers Residential Development Status – Under Construction

SITE 3


Location Plan

Site 3 – Canal Community – Boardwalk, Plazas and Parks Gate Tower – Hotel, Branded Apartments, Retail and Residential Development

SITE 3


Location Plan

Site 4 – Floating City Godolphin Racetrack and Stables Redevelopment Status of Project Vision Master Plan and Market Study Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

SITE 4

Land Area

GFA

Residential Units

1.15 mil sq.m 12.42 mil sq.ft

1.9 mil sq.m 20.4 mil sq.ft

9,000




Location Plan

Site 5 – Private Lagoon Community Man-made Freshwater Lagoon with Private Beaches and Boardwalk

SITE 5


District One, Mohammad Bin Rashid Al Maktoum City USD 4 Bil. Status of Project Phase 1 & 2 • Construction Completed • 628 Villas & Mansions handed over • Fresh Water Lagoons completed and operational • 14 KM Beach and Boardwalk • 200,000 SQM Fresh Water Lagoon Body of Water • 9 KM Dedicated Bicycle and Jogging Track

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

3.9 mil sq.m 42.7 mil sq.ft

2 mil sq.m 22 mil sq.ft

5,800 (628 Villas & Mansions)



2016

Contemporary Mansion Residential Interior & Exterior Award


District One Phase 1 and 2 Community 4, 5 and 6 Bedrooms – Handover in early 2017 Status – Construction Completed


District One Mansions – Modern Arabic Style 7+ Bedrooms, BUA 2,438 m2 | 26,242 ft² Status – Construction Completed


7+ Bedrooms, BUA 2,523 m2 / 27,157 ft² Status – Construction Completed

Contemporary Mansion Residential Interior & Exterior Award

District One Mansions – Contemporary Style

2016


District One Mansions – Mediterranean Style 7+ Bedrooms, BUA 2,362 m2 | 25,424 ft² Status – Construction Completed


District One, Mohammad Bin Rashid Al Maktoum City Phase 3 Status of Project Phase 3A • 9 Apartments Completed • 3 KM Boardwalk and Beach • 90,000 SQM Fresh Water Lagoon

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Apartments

1.1 mil sq.m 12.7 mil sq.ft

663,000 sq.m 7.1 mil sq.ft

5,755



Site 6 – District 7 Transit Oriented Development Masterplanning and Infrastructure Design for Plot Sales, USD 700 mil. Status of Project Under Construction

Location Plan

Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Sustainable Design Vision

SITE 6

Land Area

GFA

Development Plots

2.2 mil sq.m 23.7 mil sq.ft

2.2 mil sq.m 23.3 mil sq.ft

53


Site 7 – District 12 Connected Communities Vision Masterplanning, USD 10 Billion

Location Plan Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Vision

Land Area

GFA

8.4 mil sq.m 90.4 mil sq.ft

8 mil sq.m 86 mil sq.ft

SITE 7


Location Plan

Site 8 – Meydan One Masterplan Destination Development on the Canal Developed Land Status of Project Under Construction

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

47.5%

Population (estimate)

ROW & Infrastructure

Community Amenities

30.7%

5.2%

84,000

Open Space

16.6%

Land Area

GFA

Residential Units

3.7 mil sq.m 40.2 mil sq.ft

5 mil sq.m 54.3 mil sq.ft

27,765

SITE 8


Meydan One Mall USD 1.6 billion Status of Project Under Construction

Total GFA: 660,952 sqm Total BUA: 1,554,826 sqm Total GLA: 336,652 sqm

12,000 parking spaces Parking Area: 689,675 sqm 540 Retail Stores 188 Restaurants 30 Anchor Stores 80 Flagship Luxury Stores 13,200 sqm Hypermarket 5,430 sqm Medical Center

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Retail Consultancy Site Supervision Structural Design Sustainable Design Vision

Skylight Canyon Atrium 60m wide by 400m long 21 Screen Cinema 650m Ski Slope and Winter Village – expandable to 1km 25,000 sqm Multi-Purpose Experience Zone 25,800 sqm Dancing Water Fountain 5,248 sqm Kids Exploration Zone 1,945 sqm Mosque 100x80 m Retractable Skylight Grand Civic Plaza with capacity of over 30,000 occupants Luxury Plaza Hotel - 232 keys Class A Office Building – 20,000 sqm


Meydan One Mall USD 1.6 billion


Location Plan

Site 9 – Ras Al Khor Wildlife Sanctuary Project Size: 630,000 sqm, 6,781,300 sqft Status of Project Under Development

Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

SITE 9


Site 9 – Ras Al Khor Wildlife Sanctuary Ecological Light Touch Approach to Regenerative Design


Site 10 – Meydan Horizon Canal Front District Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil. Status of Project Phase 1 • Construction Completed • 100% Plots sold Phase 2 • Under Construction • 20% Plots sold

Phase 1 Location Plan

Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Sustainable Design Vision

Phase 2

SITE 10

Land Area

GFA

Development Plots

1.8 mil sq.m 19.4 mil sq.ft

3.7 mil sq.m 39.8 mil sq.ft

230


Site 11 – Meydan Creek Regenerative Eco-Living Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil.

Economic Feasibility Studies Market Analysis Masterplanning Pre-Development Studies Vision

Location Plan

SITE 11


Site 10 – Meydan Horizon Canal Front District Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil. Status of Project • Vision Masterplan Completed

Market Analysis Pre-Development Studies Vision

Land Area

GFA

FAR

1.4 mil sq.m 15.2 mil sq.ft

1.1 mil sq.m 12 mil sq.ft

0.8


Location Plan

Site 13 – Creek Park Family Destination “Creek Life” Man-made Freshwater Lagoon with Private Beaches and Boardwalk

Architecture Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

SITE 13




Location Plan

Site 14 – Canal Front Urban Renewal “City Life” Value Creation and Rejuvenation of Under-Utilized Parking Plots

Architecture Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

SITE 14

Land Area

GFA

59,983 sq.m 645,417 sq.ft

92,550 sq.m 995,838 sq.ft




Location Plan

Site 15 – Deira Waterfront Development Culture and Heritage Waterfront, USD 1.4 billion Status of Project Plot 3 • Construction Completed Plot 4 • Construction Completed • First Transit Oriented Development in Middle East Plot 11 • Construction Completed

SITE 15

Plot 12 • Under Construction Plot 13 • Under Construction

Architecture Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

610,000 sq.m 6,566,000 sq.ft

584,000 sq.m 6,286,000 sq.ft

2,200


Plot 03

Site 15 – Deira Waterfront Development Culture and Heritage Waterfront, USD 1.4 billion

Total BUA: 163,650 sqm MAIN PLAZA

Total GFA: 100,994 sqm No. of Parking: 959

12 14

03

Consist of 4 Mixed use Towers, 1 main plaza (2 residential towers, 1 Office tower and 1 Hotel Tower)

04

I CRE DUBA

11

16

EK

Plot 04

13

Total BUA: 37,140 sqm Total GFA: 25,000 sqm

DEIRA SOUQ

19

No. of Parking: 158 Consist of Transition hub Designed within a Mixed-Use Building (Retail Podium, Bus Station, Metro Station, Office Tower, Hotel Tower)

GOLD SOUQ

Plot 11

Plot 12

Plot 13

Total BUA: 14,000 sqm

Total BUA: 54,050 sqm

Total BUA: 108,260 sqm

Total GFA: 11,412 sqm

Total GFA: 28,430 sqm

Total GFA: 62,659 sqm

No. of Parking: 0

No. of Parking: 307

No. of Parking: 725

Consist of 3 G+5 Mixed Use Buildings

Consist of 5 Mixed use Buildings with 2 common basements

Consist of 13 Mixed use Buildings

Plot 14

Plot 16

Plot 19

Total BUA: 64,300

Total BUA: 60,650 sqm

Total BUA: 35,170 sqm

Total GFA: 42,686 sqm

Total GFA: 36,977 sqm

Total GFA: 25,187 sqm

No. of Parking: 393

No. of Parking: 436

No. of Parking: 144

Consist of 4 Mixed use Buildings

Consist of 14 Mixed use Buildings.

Consist of 5 Star Hotel Compound


Plot 03 – Hotel, Residential and Commercial Deira Waterfront Development Status – Construction Completed


One Deira, Plot 04 – Transit Oriented Development Deira Waterfront Development Status – Construction Completed


Plot 11 – Mixed Use Residential Deira Waterfront Development Status – Construction Completed


Plot 16 – Mixed Use Residential Deira Waterfront Development Status – Under Design


Plot 14 and 19 – Hotels Deira Waterfront Development Status – Desgin Completed

Plot 19 Five Star Hotel

Plot 19 Four Star Hotel, Service Apartment

Plot 19 Four Star Hotel, Service Apartment

Plot 19 Five Star Hotel


Location Plan

Site 16 – Deira Islands “Island Community” Culture and Heritage Waterfront, USD 3.7 billion Status of Project Phase 1 • Night Market Construction Completed • Infrastructure and ROW • Under Construction Phase 2 • Planning Completed

SITE 16

Engineering Infrastructure Design Landscape Architecture Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision

Total Land Area

Phase 1 Land Area

16 mil. sq.m 172.2 mil. sq.ft

8.3 mil. sq.m 89.3 mil. sq.ft

Phase 1 GFA

7.8 mil. sq.m 83.9 mil. sq.ft

Phase 1 Development Plots

807



Project Locations in the UAE


Deira Islands – 16.7 sq km

Dubai, UAE Over 90 sq km Master Planned

Deira Islands Towers & Boulevard Night Markets

Deira Waterfront Development 0.6 sq km

Entisar Tower Fattan Downtown Towers

ubai Water Canal – 1.85 sq km

Fattan Sky Towers Meydan One 3.7 sq km

District One – 3.9 sq km

Meydan Horizon 1.7 sq km

Meydan Residence 1

Meydan Avenue

JBH Renovations Sofitel Dubai Palm Jumeirah Masterplan Improvement Meydan Beach Hotel

District 7 – 1.8 sq km

District 11 – 3.3 sq k

District 12 – 9.3 sq k

The Valley 8.9 sq km

Marsa Meydan 1.75 sq km Nakheel Valley 22 sq km


Abu Dhabi, UAE Over 140 sq km Master Planned

Mina Zayed Zone 2 3 sq km Fisherman’s Wharf 0.6 sq km

Aldar Yas Epicurean

Family Park Courniche Pier W10

Aldar Water Edge

Emirates Palace Yacht Club

Khalifa Park – 0.6 sq km

Al Hosn & Al Manhal Vision 3.7 sq km Zayed Military Hospital Sports Park

SKMC Dialysis Center

Al Jinaan – 0.2 sq km Bloom District – 2.2 sq km

Al Riyadh City 84.7 sq km

9712 BMC 0.2 sq km Bawabat Al Sharq – 1.5 sq km Mafraq Hospital – 0.16 sq km New Zayed City – 39.4 sq km


Select Projects Internationally


Valley of Gabala, Azerbaijan Mountain Resort Rejuvenation and River Rehabilitaion, USD 4 Bil. Status of Project • Vision Masterplan Complete • Completed market research • Completed financial feasibility • Presented white paper on feasibility for free zone status • Completed Preliminary Development Strategy • Presented to the Government • Preliminary application for Export Finance

Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

10.1 mil sq.m 108.7 mil sq.ft

3.7 mil sq.m 39.8 mil sq.ft

3,200

2,600


• •

• • •

Enhance and develop existing Ski Resort and Slopes will improving the Infrastructure Rejuvenate river and improve the water level on the seasonal canal to nurture a continual water flow allowing for monetization of the riverbank Development of a Sports and Lifestyle Corridor connecting the existing Sport Complex to the Ski Resort and utilizing existing flood plane Create residential and hospitality developments along the new rivers and lake for value creation Urban infill of existing village to foster and increase tourism Develop versatile residential products Create plot subdivision for land and parcel sales


Sports Village River Walk Mountain Village Golf Estates

The River Center Parcs

Private Mansions Lagoon Village Show Village and Trial Lagoon Wellness Village Basin Village


Mountain Village I Master Plan I Proposed Assets

Mountain Village I Après-ski Plaza

Mountain Village I Flavors of Azerbaijan Food Pavilions

Mountain Village I Ski Chalets


Mountain Village I Event Plaza


Gabala Golf Estate I Aerial View

Gabala Golf Club Gabala 18 hole Golf Course Golf Estate Villas


Center Parcs

Center Parcs I Cottages



North Waterfront, Minsk, Belarus Prime Waterfront and Greenfield Plots Outside City Edge Status of Project • Concept Masterplan Complete • Master Plan submitted to the Authorities for Review and Approval • Detail Master Plan Stage in Progress

08

02 03 07

01 Architecture Branding Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

LEGEND

04

06

01 - Waterfront Community 02 - Woodland Living 03 - Wellness Community 04 - Arts & Culture District 05 - Riverfront Community 06 - Canal Side Community 07 - Lakeside Community 08 - Expo Communities 05

Total Land Area

Developed Land Area

GFA

Residential Units

13.5 mil sq.m 145.3 mil sq.ft

6.2 mil sq.m 66.7 mil sq.ft

8.2 mil sq.m 88.2 mil sq.ft

48,600


Concept Diagram

Land Use Plan

SWOT Analysis



Almaty Hills, Almaty, Kazakhstan Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel USD 208 Mil. Status of Project • Concept Masterplan Complete • Master Plan Approved by The Almaty Municipal Government City Planning Agency • Master Plan Approved by The Municipal Government Agency “Tourism and Foreign Affairs Department of Almaty City” • Detail Master Plan Stage in Progress

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Town Center GFA

3.48 mil. sq.m 37.44 mil. sq.ft

690,308 sq.m 7.43 mil. sq.ft

1,234

80

61,100 sq.m 657,436 sq.ft




8 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 2,345 square meter (25,232 square feet)


7 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 1,415 square meter (15,225 square feet)


5 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 668 square meter (7,188 square feet)



Ohio Riverfront Development, Pittsburgh, PA,USA Redevelopment of Ohio River Waterfront Warehouse Plots Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Approved by Community Review Board • Master Plan Approved by Board of Cultural District • Detail Master Plan Stage in Progress

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

60,703 sq.m 653,400 sq.ft

243,000 sq.m 2.6 mil sq.ft

1,600

400

12,000 sq.m 129,120 sq.ft




Ninth & Penn Mixed-use Development, Pittsburgh, PA, USA Urban Renewal – Development of City of Pittsburgh Parking Authority Parking Site Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

10.594 sq.m 114,000 sq.ft

74,350 sq.m 800,000 sq.ft

420

160

4,768 sq.m 51,300 sq.ft








Reed District Mixed-use Development, Nashville, TN, USA Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

37,009 sq.m 398,222 sq.ft

122,491 sq.m 1,318,000 sq.ft

324

250

2,221 sq.m 23,900 sq.ft





Site Plan Relationship Diagram

Broadway Corridor Diagram – Urban Anchor and Corner View Corridor

Broadway Corridor Diagram – Ground Level Permeability

Contextual Height Diagram


Bloom Riverfront Development, USA Urban Revitalization of Downtown Parking Site – Hotel, Luxury Residential, Mayo Clinic, Post-Op Service Apartments and Retail Status of Project • Concept Masterplan Completed • Detailed Masterplan Completed • Schematic Design for Hotel Design Completed • Master Plan Approved by City Planning Commission

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

8,985 sq.m 96,679 sq.ft

92,903 sq.m 1.0 mil. sq.ft

550

160

3,200 sq.m 34,432 sq.ft



Reed District Mixed-use Development, Nashville, TN, USA Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust

Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision

Land Area

GFA

Residential Units

Hotel Keys

Retail GLA

37,009 sq.m 398,222 sq.ft

122,491 sq.m 1,318,000 sq.ft

324

250

2,221 sq.m 23,900 sq.ft





Site Plan Relationship Diagram

Broadway Corridor Diagram – Urban Anchor and Corner View Corridor

Broadway Corridor Diagram – Ground Level Permeability

Contextual Height Diagram


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.