$10+BILLION 10YEARS OF DESIGN WORK OVER THE PAST
14.1 sq km 0.6
42
sq km
sq km
238 sq km 55.3 sq km
SERVICES Development Inception Development Finance Development Management Pre-Development Studies Economic Feasibility Studies Market Analysis Vision Architecture Branding Construction Management Engineering Infrastructure Design Interior Design Landscape Architecture Masterplanning Project Management Retail Consultancy Site Supervision Structural Design Sustainable Design
MARKET SECTORS Residential Developments Healthcare Hospitality Tall Buildings Retail + F&B Masterplanning Destination Development Education Commercial
Taking Projects from
Visioning To
Masterplanning Design
9Offices
across three continents Abu Dhabi Amman Bratislava Cleveland Doha Dubai Oberhausen Pittsburgh Riyadh
350sq km
of masterplanning & developments
Creating the DNA of the City
Through
Construction
Design at World Scale
Creating the DNA of the City – Waterfront Life The Heritage Canal from Past to Future SITE 16
Over 26 Kilometers of Canal
SITE 1
SITE 15
SITE 2 SITE 14 SITE 3 SITE 4 SITE 9
SITE 13
SITE 5 SITE 6 SITE 7
SITE 12
SITE 8
SITE 11
SITE 10
The Kaleidoscope of Living Experiences
COMMUNITY EXPLORATION
CONNECTION
DESTINATION
HEALTH
RESPECT
PLAY
IMPACT
NATURE
INNOVATION
LIVE LEARN
FAMILY
INCLUSION
WELLNESS
CELEBRATION
Dubai Water Canal – Site 1, 2 & 3 USD 2 Bil.
SITE 1
Status of Project Phase 1 • Construction Completed • 5 KM Boardwalk • 3 Iconic Award-Winning Bridges • RTA Water Taxis Operational
SITE 2 SITE 3
Phase 2 • Under Construction • 3.1 KM Boardwalk • Peninsula Reclamation Completed
Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision
Land Area
GFA
Residential Units
1.85 mil sq.m 20 mil sq.ft
1.9 mil sq.m 20.1 mil sq.ft
8,400
Iconic Pedestrian Bridges Dubai Water Canal Development
Pedestrian Bridge 3
Pedestrian Bridge 2
Pedestrian Bridge 1
Boardwalk
Status – Construction Completed
Bridge of Tolerance Outdoor Space + Design of the Year Award
Dubai Water Canal Development REGIONAL + URBAN DESIGN: Certificate of Merit
Pedestrian Bridges
2017 2017
Location Plan
Site 1 – Peninsula Beachfront and Marina Lifestyle Luxury Marina Apartments and Hotels
SITE 1
Location Plan
Site 2 – Water’s Edge Living Luxury Water Villas and Apartments with Private Boat Docks
SITE 2
Location Plan
Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa A Mixed-Use Residential Development Status – Under Construction
SITE 3
Under Construction
Location Plan
Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa B Mixed-Use Residential Development Status – Under Construction
SITE 3
Under Construction
Location Plan
Site 3 – Canal Community – Boardwalk, Plazas and Parks Safa Towers Residential Development Status – Under Construction
SITE 3
Location Plan
Site 3 – Canal Community – Boardwalk, Plazas and Parks Gate Tower – Hotel, Branded Apartments, Retail and Residential Development
SITE 3
Location Plan
Site 4 – Floating City Godolphin Racetrack and Stables Redevelopment Status of Project Vision Master Plan and Market Study Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision
SITE 4
Land Area
GFA
Residential Units
1.15 mil sq.m 12.42 mil sq.ft
1.9 mil sq.m 20.4 mil sq.ft
9,000
Location Plan
Site 5 – Private Lagoon Community Man-made Freshwater Lagoon with Private Beaches and Boardwalk
SITE 5
District One, Mohammad Bin Rashid Al Maktoum City USD 4 Bil. Status of Project Phase 1 & 2 • Construction Completed • 628 Villas & Mansions handed over • Fresh Water Lagoons completed and operational • 14 KM Beach and Boardwalk • 200,000 SQM Fresh Water Lagoon Body of Water • 9 KM Dedicated Bicycle and Jogging Track
Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision
Land Area
GFA
Residential Units
3.9 mil sq.m 42.7 mil sq.ft
2 mil sq.m 22 mil sq.ft
5,800 (628 Villas & Mansions)
2016
Contemporary Mansion Residential Interior & Exterior Award
District One Phase 1 and 2 Community 4, 5 and 6 Bedrooms – Handover in early 2017 Status – Construction Completed
District One Mansions – Modern Arabic Style 7+ Bedrooms, BUA 2,438 m2 | 26,242 ft² Status – Construction Completed
7+ Bedrooms, BUA 2,523 m2 / 27,157 ft² Status – Construction Completed
Contemporary Mansion Residential Interior & Exterior Award
District One Mansions – Contemporary Style
2016
District One Mansions – Mediterranean Style 7+ Bedrooms, BUA 2,362 m2 | 25,424 ft² Status – Construction Completed
District One, Mohammad Bin Rashid Al Maktoum City Phase 3 Status of Project Phase 3A • 9 Apartments Completed • 3 KM Boardwalk and Beach • 90,000 SQM Fresh Water Lagoon
Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision
Land Area
GFA
Residential Apartments
1.1 mil sq.m 12.7 mil sq.ft
663,000 sq.m 7.1 mil sq.ft
5,755
Site 6 – District 7 Transit Oriented Development Masterplanning and Infrastructure Design for Plot Sales, USD 700 mil. Status of Project Under Construction
Location Plan
Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Sustainable Design Vision
SITE 6
Land Area
GFA
Development Plots
2.2 mil sq.m 23.7 mil sq.ft
2.2 mil sq.m 23.3 mil sq.ft
53
Site 7 – District 12 Connected Communities Vision Masterplanning, USD 10 Billion
Location Plan Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Vision
Land Area
GFA
8.4 mil sq.m 90.4 mil sq.ft
8 mil sq.m 86 mil sq.ft
SITE 7
Location Plan
Site 8 – Meydan One Masterplan Destination Development on the Canal Developed Land Status of Project Under Construction
Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision
47.5%
Population (estimate)
ROW & Infrastructure
Community Amenities
30.7%
5.2%
84,000
Open Space
16.6%
Land Area
GFA
Residential Units
3.7 mil sq.m 40.2 mil sq.ft
5 mil sq.m 54.3 mil sq.ft
27,765
SITE 8
Meydan One Mall USD 1.6 billion Status of Project Under Construction
Total GFA: 660,952 sqm Total BUA: 1,554,826 sqm Total GLA: 336,652 sqm
12,000 parking spaces Parking Area: 689,675 sqm 540 Retail Stores 188 Restaurants 30 Anchor Stores 80 Flagship Luxury Stores 13,200 sqm Hypermarket 5,430 sqm Medical Center
Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Retail Consultancy Site Supervision Structural Design Sustainable Design Vision
Skylight Canyon Atrium 60m wide by 400m long 21 Screen Cinema 650m Ski Slope and Winter Village – expandable to 1km 25,000 sqm Multi-Purpose Experience Zone 25,800 sqm Dancing Water Fountain 5,248 sqm Kids Exploration Zone 1,945 sqm Mosque 100x80 m Retractable Skylight Grand Civic Plaza with capacity of over 30,000 occupants Luxury Plaza Hotel - 232 keys Class A Office Building – 20,000 sqm
Meydan One Mall USD 1.6 billion
Location Plan
Site 9 – Ras Al Khor Wildlife Sanctuary Project Size: 630,000 sqm, 6,781,300 sqft Status of Project Under Development
Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision
SITE 9
Site 9 – Ras Al Khor Wildlife Sanctuary Ecological Light Touch Approach to Regenerative Design
Site 10 – Meydan Horizon Canal Front District Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil. Status of Project Phase 1 • Construction Completed • 100% Plots sold Phase 2 • Under Construction • 20% Plots sold
Phase 1 Location Plan
Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Sustainable Design Vision
Phase 2
SITE 10
Land Area
GFA
Development Plots
1.8 mil sq.m 19.4 mil sq.ft
3.7 mil sq.m 39.8 mil sq.ft
230
Site 11 – Meydan Creek Regenerative Eco-Living Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil.
Economic Feasibility Studies Market Analysis Masterplanning Pre-Development Studies Vision
Location Plan
SITE 11
Site 10 – Meydan Horizon Canal Front District Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil. Status of Project • Vision Masterplan Completed
Market Analysis Pre-Development Studies Vision
Land Area
GFA
FAR
1.4 mil sq.m 15.2 mil sq.ft
1.1 mil sq.m 12 mil sq.ft
0.8
Location Plan
Site 13 – Creek Park Family Destination “Creek Life” Man-made Freshwater Lagoon with Private Beaches and Boardwalk
Architecture Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision
SITE 13
Location Plan
Site 14 – Canal Front Urban Renewal “City Life” Value Creation and Rejuvenation of Under-Utilized Parking Plots
Architecture Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision
SITE 14
Land Area
GFA
59,983 sq.m 645,417 sq.ft
92,550 sq.m 995,838 sq.ft
Location Plan
Site 15 – Deira Waterfront Development Culture and Heritage Waterfront, USD 1.4 billion Status of Project Plot 3 • Construction Completed Plot 4 • Construction Completed • First Transit Oriented Development in Middle East Plot 11 • Construction Completed
SITE 15
Plot 12 • Under Construction Plot 13 • Under Construction
Architecture Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision
Land Area
GFA
Residential Units
610,000 sq.m 6,566,000 sq.ft
584,000 sq.m 6,286,000 sq.ft
2,200
Plot 03
Site 15 – Deira Waterfront Development Culture and Heritage Waterfront, USD 1.4 billion
Total BUA: 163,650 sqm MAIN PLAZA
Total GFA: 100,994 sqm No. of Parking: 959
12 14
03
Consist of 4 Mixed use Towers, 1 main plaza (2 residential towers, 1 Office tower and 1 Hotel Tower)
04
I CRE DUBA
11
16
EK
Plot 04
13
Total BUA: 37,140 sqm Total GFA: 25,000 sqm
DEIRA SOUQ
19
No. of Parking: 158 Consist of Transition hub Designed within a Mixed-Use Building (Retail Podium, Bus Station, Metro Station, Office Tower, Hotel Tower)
GOLD SOUQ
Plot 11
Plot 12
Plot 13
Total BUA: 14,000 sqm
Total BUA: 54,050 sqm
Total BUA: 108,260 sqm
Total GFA: 11,412 sqm
Total GFA: 28,430 sqm
Total GFA: 62,659 sqm
No. of Parking: 0
No. of Parking: 307
No. of Parking: 725
Consist of 3 G+5 Mixed Use Buildings
Consist of 5 Mixed use Buildings with 2 common basements
Consist of 13 Mixed use Buildings
Plot 14
Plot 16
Plot 19
Total BUA: 64,300
Total BUA: 60,650 sqm
Total BUA: 35,170 sqm
Total GFA: 42,686 sqm
Total GFA: 36,977 sqm
Total GFA: 25,187 sqm
No. of Parking: 393
No. of Parking: 436
No. of Parking: 144
Consist of 4 Mixed use Buildings
Consist of 14 Mixed use Buildings.
Consist of 5 Star Hotel Compound
Plot 03 – Hotel, Residential and Commercial Deira Waterfront Development Status – Construction Completed
One Deira, Plot 04 – Transit Oriented Development Deira Waterfront Development Status – Construction Completed
Plot 11 – Mixed Use Residential Deira Waterfront Development Status – Construction Completed
Plot 16 – Mixed Use Residential Deira Waterfront Development Status – Under Design
Plot 14 and 19 – Hotels Deira Waterfront Development Status – Desgin Completed
Plot 19 Five Star Hotel
Plot 19 Four Star Hotel, Service Apartment
Plot 19 Four Star Hotel, Service Apartment
Plot 19 Five Star Hotel
Location Plan
Site 16 – Deira Islands “Island Community” Culture and Heritage Waterfront, USD 3.7 billion Status of Project Phase 1 • Night Market Construction Completed • Infrastructure and ROW • Under Construction Phase 2 • Planning Completed
SITE 16
Engineering Infrastructure Design Landscape Architecture Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision
Total Land Area
Phase 1 Land Area
16 mil. sq.m 172.2 mil. sq.ft
8.3 mil. sq.m 89.3 mil. sq.ft
Phase 1 GFA
7.8 mil. sq.m 83.9 mil. sq.ft
Phase 1 Development Plots
807
Project Locations in the UAE
Deira Islands – 16.7 sq km
Dubai, UAE Over 90 sq km Master Planned
Deira Islands Towers & Boulevard Night Markets
Deira Waterfront Development 0.6 sq km
Entisar Tower Fattan Downtown Towers
ubai Water Canal – 1.85 sq km
Fattan Sky Towers Meydan One 3.7 sq km
District One – 3.9 sq km
Meydan Horizon 1.7 sq km
Meydan Residence 1
Meydan Avenue
JBH Renovations Sofitel Dubai Palm Jumeirah Masterplan Improvement Meydan Beach Hotel
District 7 – 1.8 sq km
District 11 – 3.3 sq k
District 12 – 9.3 sq k
The Valley 8.9 sq km
Marsa Meydan 1.75 sq km Nakheel Valley 22 sq km
Abu Dhabi, UAE Over 140 sq km Master Planned
Mina Zayed Zone 2 3 sq km Fisherman’s Wharf 0.6 sq km
Aldar Yas Epicurean
Family Park Courniche Pier W10
Aldar Water Edge
Emirates Palace Yacht Club
Khalifa Park – 0.6 sq km
Al Hosn & Al Manhal Vision 3.7 sq km Zayed Military Hospital Sports Park
SKMC Dialysis Center
Al Jinaan – 0.2 sq km Bloom District – 2.2 sq km
Al Riyadh City 84.7 sq km
9712 BMC 0.2 sq km Bawabat Al Sharq – 1.5 sq km Mafraq Hospital – 0.16 sq km New Zayed City – 39.4 sq km
Select Projects Internationally
Valley of Gabala, Azerbaijan Mountain Resort Rejuvenation and River Rehabilitaion, USD 4 Bil. Status of Project • Vision Masterplan Complete • Completed market research • Completed financial feasibility • Presented white paper on feasibility for free zone status • Completed Preliminary Development Strategy • Presented to the Government • Preliminary application for Export Finance
Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision
Land Area
GFA
Residential Units
Hotel Keys
10.1 mil sq.m 108.7 mil sq.ft
3.7 mil sq.m 39.8 mil sq.ft
3,200
2,600
• •
•
•
• • •
Enhance and develop existing Ski Resort and Slopes will improving the Infrastructure Rejuvenate river and improve the water level on the seasonal canal to nurture a continual water flow allowing for monetization of the riverbank Development of a Sports and Lifestyle Corridor connecting the existing Sport Complex to the Ski Resort and utilizing existing flood plane Create residential and hospitality developments along the new rivers and lake for value creation Urban infill of existing village to foster and increase tourism Develop versatile residential products Create plot subdivision for land and parcel sales
Sports Village River Walk Mountain Village Golf Estates
The River Center Parcs
Private Mansions Lagoon Village Show Village and Trial Lagoon Wellness Village Basin Village
Mountain Village I Master Plan I Proposed Assets
Mountain Village I Après-ski Plaza
Mountain Village I Flavors of Azerbaijan Food Pavilions
Mountain Village I Ski Chalets
Mountain Village I Event Plaza
Gabala Golf Estate I Aerial View
Gabala Golf Club Gabala 18 hole Golf Course Golf Estate Villas
Center Parcs
Center Parcs I Cottages
North Waterfront, Minsk, Belarus Prime Waterfront and Greenfield Plots Outside City Edge Status of Project • Concept Masterplan Complete • Master Plan submitted to the Authorities for Review and Approval • Detail Master Plan Stage in Progress
08
02 03 07
01 Architecture Branding Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision
LEGEND
04
06
01 - Waterfront Community 02 - Woodland Living 03 - Wellness Community 04 - Arts & Culture District 05 - Riverfront Community 06 - Canal Side Community 07 - Lakeside Community 08 - Expo Communities 05
Total Land Area
Developed Land Area
GFA
Residential Units
13.5 mil sq.m 145.3 mil sq.ft
6.2 mil sq.m 66.7 mil sq.ft
8.2 mil sq.m 88.2 mil sq.ft
48,600
Concept Diagram
Land Use Plan
SWOT Analysis
Almaty Hills, Almaty, Kazakhstan Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel USD 208 Mil. Status of Project • Concept Masterplan Complete • Master Plan Approved by The Almaty Municipal Government City Planning Agency • Master Plan Approved by The Municipal Government Agency “Tourism and Foreign Affairs Department of Almaty City” • Detail Master Plan Stage in Progress
Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision
Land Area
GFA
Residential Units
Hotel Keys
Town Center GFA
3.48 mil. sq.m 37.44 mil. sq.ft
690,308 sq.m 7.43 mil. sq.ft
1,234
80
61,100 sq.m 657,436 sq.ft
8 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 2,345 square meter (25,232 square feet)
7 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 1,415 square meter (15,225 square feet)
5 Bedroom Luxury Residence Updated Contemporary Kazakh Vernacular – 668 square meter (7,188 square feet)
Ohio Riverfront Development, Pittsburgh, PA,USA Redevelopment of Ohio River Waterfront Warehouse Plots Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Approved by Community Review Board • Master Plan Approved by Board of Cultural District • Detail Master Plan Stage in Progress
Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision
Land Area
GFA
Residential Units
Hotel Keys
Retail GLA
60,703 sq.m 653,400 sq.ft
243,000 sq.m 2.6 mil sq.ft
1,600
400
12,000 sq.m 129,120 sq.ft
Ninth & Penn Mixed-use Development, Pittsburgh, PA, USA Urban Renewal – Development of City of Pittsburgh Parking Authority Parking Site Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust
Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision
Land Area
GFA
Residential Units
Hotel Keys
Retail GLA
10.594 sq.m 114,000 sq.ft
74,350 sq.m 800,000 sq.ft
420
160
4,768 sq.m 51,300 sq.ft
Reed District Mixed-use Development, Nashville, TN, USA Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust
Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision
Land Area
GFA
Residential Units
Hotel Keys
Retail GLA
37,009 sq.m 398,222 sq.ft
122,491 sq.m 1,318,000 sq.ft
324
250
2,221 sq.m 23,900 sq.ft
Site Plan Relationship Diagram
Broadway Corridor Diagram – Urban Anchor and Corner View Corridor
Broadway Corridor Diagram – Ground Level Permeability
Contextual Height Diagram
Bloom Riverfront Development, USA Urban Revitalization of Downtown Parking Site – Hotel, Luxury Residential, Mayo Clinic, Post-Op Service Apartments and Retail Status of Project • Concept Masterplan Completed • Detailed Masterplan Completed • Schematic Design for Hotel Design Completed • Master Plan Approved by City Planning Commission
Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision
Land Area
GFA
Residential Units
Hotel Keys
Retail GLA
8,985 sq.m 96,679 sq.ft
92,903 sq.m 1.0 mil. sq.ft
550
160
3,200 sq.m 34,432 sq.ft
Reed District Mixed-use Development, Nashville, TN, USA Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust
Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Structural Design Sustainable Design Vision
Land Area
GFA
Residential Units
Hotel Keys
Retail GLA
37,009 sq.m 398,222 sq.ft
122,491 sq.m 1,318,000 sq.ft
324
250
2,221 sq.m 23,900 sq.ft
Site Plan Relationship Diagram
Broadway Corridor Diagram – Urban Anchor and Corner View Corridor
Broadway Corridor Diagram – Ground Level Permeability
Contextual Height Diagram