ABU DHABI, AMMAN, BRATISLAVA, CAIRO, DUBAI, JACKSONVILLE, KOCHI, LANCASTER, OBERHAUSEN, PITTSBURGH, RAS AL KHAIMAH, RIYADH WWW.AE7.COM
The Kaleidoscope of Living Experiences
April 2023 AE7
The Kaleidoscope of Living Experiences
$10+BILLION OF DESIGN WORK OVER THE PAST13YEARS
Design at World Scale
MARKET SECTORS Residential Developments Healthcare Hospitality Tall Buildings Retail + F&B Masterplanning Destination Development Education Commercial SERVICES Development Inception Development Finance Development Management Pre-Development Studies Economic Feasibility Studies Market Analysis Vision Architecture Branding Construction Management Engineering Infrastructure Design Interior Design Landscape Architecture Masterplanning Project Management Retail Consultancy Site Supervision Structural Design Sustainable Design 9Offices across three continents Abu Dhabi Amman Bratislava Cleveland Doha Dubai Oberhausen Pittsburgh Riyadh 0.6 sq km 14.1 sqkm 238 sqkm 42 sqkm 55.3 sqkm 350sqkm of masterplanning& developments Creating the DNA of the City Taking Projects from Visioning Masterplanning Design Construction Through To 12 Abu Dhabi Amman Bratislava Cairo Doha Dubai Jacksonville Oberhausen Pittsburgh Portland Ras Al-Khaimah Riyadh
Creating the DNA of the City – Waterfront Life
The Heritage Canal from Past to Future
SITE 1 SITE 2 SITE 3 SITE 4 SITE 5 SITE 6 SITE 10 SITE 7 SITE 15 SITE 11 SITE 12 SITE 13 SITE 14 SITE 8 SITE 9 SITE 16
Over 26 Kilometers of Canal
INCLUSION RESPECT
LIVE FAMILYLEARNPLAY COMMUNITY CELEBRATION
DESTINATION EXPLORATION HEALTH WELLNESS CONNECTION
NATURE INNOVATION IMPACT
Dubai Water Canal – Site 1, 2 & 3 USD 2 Bil. Residential Units 8,400 GFA 1.9 mil sq.m 20.1 mil sq.ft Land Area 1.85 mil sq.m 20 mil sq.ft Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision Status of Project Phase 1 • Construction Completed • 5 KM Boardwalk • 3 Iconic Award Winning Bridges • RTA Water Taxis Operational Phase 2 • Under Construction • 3.1 KM Boardwalk • Peninsula Reclamation Completed SITE 1 SITE 2 SITE 3
Iconic Pedestrian Bridges Dubai Water Canal Development
Boardwalk
Pedestrian Bridge 3
Pedestrian Bridge 2
Pedestrian Bridge 1
Pedestrian Bridges
Dubai Water Canal Development
Bridge of Tolerance Outdoor Space + Design of the Year Award 2017 REGIONAL + URBAN DESIGN: Certificate of Merit 2017
Status – Construction Completed
Site 1 – Peninsula Beachfront and Marina Lifestyle
Luxury Marina Apartments and Hotels
Location Plan
1
SITE
Site 2
–
Water’s Edge Living
Luxury Water Villas and Apartments with Private Boat Docks
Location Plan SITE 2
Site 3 –
Canal Community – Boardwalk, Plazas and Parks
Safa A Mixed-Use Residential Development
Status – Under Construction
Under Construction
Location Plan SITE 3
Site 3 –
Canal Community – Boardwalk, Plazas and Parks
Safa B Mixed-Use Residential Development
Status – Under Construction
Under Construction
Location Plan SITE 3
Site 3 –
Canal Community – Boardwalk, Plazas and Parks
Safa Towers Residential Development
Status – Under Construction
Location Plan
3
SITE
Site 3 – Canal Community – Boardwalk, Plazas and Parks
Gate Tower – Hotel, Branded Apartments, Retail and Residential Development
Location Plan SITE 3
4 – Floating City Godolphin Racetrack and Stables Redevelopment Residential Units 9,000 GFA 1.9 mil sq.m 20.4 mil sq.ft Land Area 1.15 mil sq.m 12.42 mil sq.ft Status of Project Vision Master Plan and Market Study Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Sustainable Design Vision Location Plan SITE 4
Site
Site 5 – Private Lagoon Community
Man-made Freshwater Lagoon with Private Beaches and Boardwalk
Location Plan
SITE 5
District One, Mohammad Bin Rashid Al Maktoum City
Status of Project Phase 1 & 2
• Construction Completed
• 628 Villas & Mansions handed over
• Fresh Water Lagoons completed and operational
• 14 KM Beach and Boardwalk
• 200,000 SQM Fresh Water Lagoon Body of Water
• 9 KM Dedicated Bicycle and Jogging Track
Architecture
Branding
Economic Feasibility Studies
Engineering
Infrastructure Design
Interior Design
Landscape Architecture
Market Analysis
Masterplanning
Pre Development Studies
Site Supervision
Structural Design
Sustainable Design
Vision
Residential Units 5,800 (628 Villas & Mansions) GFA 2 mil sq.m 22 mil sq.ft
3.9
sq.m 42.7
sq.ft
USD 4 Bil.
Land Area
mil
mil
Contemporary Mansion Residential Interior & Exterior Award 2016
District One Phase 1 and 2 Community
4, 5 and 6 Bedrooms – Handover in early 2017
Status – Construction Completed
District One Mansions – Modern Arabic Style
7+ Bedrooms, BUA 2,438 m2 | 26,242 ft²
Status – Construction Completed
District One Mansions – Contemporary Style
7+ Bedrooms, BUA 2,523 m2 / 27,157 ft² Status – Construction Completed
Contemporary Mansion Residential Interior & Exterior Award 2016
District One Mansions – Mediterranean Style
7+ Bedrooms, BUA 2,362 m2 | 25,424 ft²
Status – Construction Completed
District One, Mohammad Bin Rashid Al Maktoum City
Phase 3 Residential Apartments 5,755 GFA 663,000 sq.m 7.1 mil sq.ft Land Area 1.1 mil sq.m 12.7 mil sq.ft Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision Status of Project Phase 3A • 9 Apartments Completed • 3 KM Boardwalk and Beach • 90,000 SQM Fresh Water Lagoon
Site 6 – District 7 Transit Oriented Development
Masterplanning
Development Plots 53 GFA 2.2 mil sq.m 23.3 mil sq.ft Land Area 2.2 mil sq.m 23.7 mil sq.ft Architecture Branding
Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis
Pre Development Studies
Supervision Sustainable Design Vision Status of Project Under Construction
Economic
Masterplanning
Site
Plan
6
and Infrastructure Design for Plot Sales, USD 700 mil. Location
SITE
Site 7 – District 12 Connected Communities
Vision Masterplanning, USD 10 Billion
GFA 8 mil sq.m 86 mil sq.ft Land Area 8.4 mil sq.m 90.4 mil sq.ft Architecture Branding Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre Development Studies Vision
Location Plan
SITE 7
Site 8 –
Meydan One Masterplan
Destination Development on the
Residential Units 27,765 GFA 5 mil sq.m 54.3 mil sq.ft Land Area 3.7 mil sq.m 40.2 mil sq.ft Architecture Branding Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre Development Studies Site Supervision Structural Design Sustainable Design Vision Status of Project Under Construction Developed Land 47.5% Open Space 16.6% Community Amenities 5.2% ROW & Infrastructure 30.7% Population (estimate) 84,000 Location Plan SITE 8
Canal
Meydan One Mall
USD 1.6 billion
Status of Project
Under Construction
Total GFA: 660,952 sqm
Total BUA: 1,554,826 sqm
Total GLA: 336,652 sqm
Architecture
Branding
Economic Feasibility Studies
Engineering
Infrastructure Design
Interior Design
Landscape Architecture
Market Analysis
Masterplanning
Pre-Development Studies
Retail Consultancy
Site Supervision
Structural Design
Sustainable Design
Vision
12,000 parking spaces
Parking Area: 689,675 sqm
540 Retail Stores
188 Restaurants
30 Anchor Stores
80 Flagship Luxury Stores
13,200 sqm Hypermarket
5,430 sqm Medical Center
Skylight Canyon Atrium 60m wide by 400m long
21 Screen Cinema
650m Ski Slope and Winter Village – expandable to 1km
25,000 sqm Multi-Purpose Experience Zone
25,800 sqm Dancing Water Fountain
5,248 sqm Kids Exploration Zone
1,945 sqm Mosque
100x80 m Retractable Skylight
Grand Civic Plaza with capacity of over 30,000 occupants
Luxury Plaza Hotel - 232 keys
Class A Office Building – 20,000 sqm
Meydan One Mall
USD 1.6 billion
Site 9 – Ras Al Khor Wildlife Sanctuary
Project Size: 630,000 sqm, 6,781,300 sqft
Status of Project
Under Development
Architecture
Branding
Economic Feasibility Studies
Engineering
Interior Design
Landscape Architecture
Market Analysis
Masterplanning
Pre Development Studies
Structural Design
Sustainable Design
Vision
Location Plan SITE 9
Site 9 – Ras Al Khor Wildlife Sanctuary
Ecological Light Touch Approach to Regenerative Design
Development Plots 230 GFA 3.7 mil sq.m 39.8 mil sq.ft Land Area 1.8 mil sq.m 19.4 mil sq.ft Architecture Branding Economic Feasibility Studies Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre Development Studies Site Supervision Sustainable Design Vision Status of Project Phase 1 • Construction Completed • 100% Plots sold Phase 2 • Under Construction • 20% Plots sold Phase 1 Phase 2 Site 10 – Meydan Horizon Canal Front District Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil. Location Plan SITE 10
Site 11
– Meydan Creek Regenerative Eco-Living
Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil.
Economic Feasibility Studies
Market Analysis
Masterplanning
Pre Development Studies
Vision
SITE 11
Location Plan
Meydan Horizon Canal Front District
FAR 0.8 GFA 1.1 mil sq.m 12 mil sq.ft Land Area 1.4 mil sq.m 15.2 mil sq.ft Market Analysis Pre Development Studies Vision Status of Project • Vision Masterplan Completed Site
10 –
Masterplanning and Infrastructure Design for Plot Sales, USD 575 mil.
Site 13 –
Creek Park Family Destination “Creek Life”
Man-made Freshwater Lagoon with Private Beaches and Boardwalk
Architecture
Economic Feasibility Studies
Landscape Architecture
Market Analysis
Masterplanning
Pre Development Studies
Sustainable Design
Vision
Location Plan SITE 13
Value Creation and Rejuvenation of Under-Utilized Parking Plots
Site 14 – Canal Front Urban Renewal “City Life”
Architecture Economic Feasibility Studies Landscape Architecture Market Analysis Masterplanning Pre Development Studies Sustainable Design Vision Location Plan SITE 14 GFA 92,550 sq.m 995,838 sq.ft Land Area 59,983 sq.m 645,417 sq.ft
Deira Waterfront Development
Waterfront, USD 1.4 billion
Site 15 –
Heritage
Architecture Economic Feasibility Studies Engineering Interior Design Landscape Architecture Market Analysis Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision Status of Project Plot 3 • Construction Completed Plot 4 • Construction Completed • First Transit Oriented Development in Middle East Plot 11 • Construction Completed Plot 12 • Under Construction Plot 13 • Under Construction Residential Units 2,200 GFA 584,000 sq.m 6,286,000 sq.ft Land Area 610,000 sq.m 6,566,000 sq.ft Location Plan SITE 15
Culture and
Site 15 – Deira Waterfront Development
Culture and Heritage Waterfront, USD 1.4 billion
Total BUA: 14,000 sqm
Total GFA: 11,412 sqm No. of Parking: 0
Consist of 3 G+5 Mixed Use Buildings
Plot 12
Total BUA: 54,050 sqm
Total GFA: 28,430 sqm
No. of Parking: 307
Consist of 5 Mixed use Buildings with 2 common basements
Plot 14
Total BUA: 64,300
Total GFA: 42,686 sqm
No. of Parking: 393
Consist of 4 Mixed use Buildings
Plot 16
Total BUA: 60,650 sqm
Total GFA: 36,977 sqm
No. of Parking: 436
Consist of 14 Mixed use Buildings.
Plot 03
Total BUA: 163,650 sqm
Total GFA: 100,994 sqm
No. of Parking: 959
Consist of 4 Mixed use Towers, 1 main plaza (2 residential towers, 1 Office tower and 1 Hotel Tower)
Plot 04
Total BUA: 37,140 sqm
Total GFA: 25,000 sqm
No. of Parking: 158
Consist of Transition hub Designed within a Mixed-Use Building (Retail Podium, Bus Station, Metro Station, Office Tower, Hotel Tower)
Plot 13
Total BUA: 108,260 sqm
Total GFA: 62,659 sqm
No. of Parking: 725
Consist of 13 Mixed use Buildings
Plot 19
Total BUA: 35,170 sqm
Total GFA: 25,187 sqm
No. of Parking: 144
Consist of 5 Star Hotel Compound
16 19 14 12 11 13 03 04 DEIRA SOUQ GOLD SOUQ DUBAI CREEK MAIN PLAZA
Plot 11
Status – Construction Completed
Plot 03 – Hotel, Residential and Commercial Deira Waterfront Development
One Deira, Plot 04 – Transit Oriented Development
Deira Waterfront Development
Status – Construction Completed
Plot 11 – Mixed Use Residential
Deira Waterfront Development
Status
– Construction Completed
Plot 16 – Mixed Use Residential
Deira Waterfront Development
Status – Under Design
Plot 14 and 19 – Hotels
Deira Waterfront Development
Status – Desgin Completed
Plot 19 Five Star Hotel
Plot 19 Four Star Hotel, Service Apartment
Plot 19 Five Star Hotel
Plot 19 Four Star Hotel, Service Apartment
Deira Islands “Island Community”
Site 16 –
Culture and Heritage Waterfront, USD 3.7 billion Engineering Infrastructure Design Landscape Architecture Masterplanning Pre-Development Studies Site Supervision Structural Design Sustainable Design Vision Status of Project Phase 1 • Night Market Construction Completed • Infrastructure and ROW • Under Construction Phase 2 • Planning Completed Phase 1 GFA 7.8 mil. sq.m 83.9 mil. sq.ft Phase 1 Land Area 8.3 mil. sq.m 89.3 mil. sq.ft Total Land Area 16 mil. sq.m 172.2 mil. sq.ft Phase 1 Development Plots 807 Location Plan SITE 16
Project Locations in the UAE
Meydan One 3.7 sq km District 7 – 1.8 sq km Meydan Avenue Meydan Horizon 1.7 sq km District 11 – 3.3 sq km District 12 – 9.3 sq km Marsa Meydan 1.75 sq km Nakheel Valley 22 sq km Fattan Sky Towers Night Markets Deira Islands – 16.7 sq km Dubai Water Canal – 1.85 sq km District One – 3.9 sq km Palm Jumeirah Masterplan Improvement Meydan Beach Hotel Deira Waterfront Development 0.6 sq km Deira Islands Towers & Boulevard Sofitel Dubai JBH Renovations Dubai, UAE Fattan Downtown Towers Entisar Tower Meydan Residence 1 The Valley 8.9 sq km Over 90 sq km Master Planned
Mina Zayed Zone 2 3 sq km Fisherman’s Wharf 0.6 sq km Family Park Courniche Pier Emirates Palace Yacht Club Al Hosn & Al Manhal Vision 3.7 sq km Zayed Military Hospital SKMC Dialysis Center 9712 BMC 0.2 sq km Al Jinaan – 0.2 sq km Khalifa Park – 0.6 sq km Al Riyadh City 84.7 sq km Mafraq Hospital – 0.16 sq km Abu Dhabi, UAE Sports Park New Zayed City – 39.4 sq km Bloom District – 2.2 sq km Bawabat Al Sharq – 1.5 sq km Aldar Water Edge Aldar Yas Epicurean Over 140 sq km Master Planned
Select Projects Internationally
Valley of Gabala, Azerbaijan
Mountain Resort Rejuvenation and River Rehabilitaion, USD 4 Bil.
Status of Project
• Vision Masterplan Complete
• Completed market research
• Completed financial feasibility
• Presented white paper on feasibility for free zone status
• Completed Preliminary Development Strategy
• Presented to the Government
• Preliminary application for Export Finance
Architecture
Branding
Economic Feasibility Studies
Infrastructure Design Landscape Architecture
Market Analysis
Masterplanning
Pre Development Studies
Sustainable Design Vision
Residential Units 3,200 GFA 3.7 mil sq.m 39.8 mil sq.ft Land Area 10.1 mil sq.m 108.7 mil sq.ft Hotel Keys 2,600
• Enhance and develop existing Ski Resort and Slopes will improving the Infrastructure
• Rejuvenate river and improve the water level on the seasonal canal to nurture a continual water flow allowing for monetization of the riverbank
• Development of a Sports and Lifestyle Corridor connecting the existing Sport Complex to the Ski Resort and utilizing existing flood plane
• Create residential and hospitality developments along the new rivers and lake for value creation
• Urban infill of existing village to foster and increase tourism
• Develop versatile residential products
• Create plot subdivision for land and parcel sales
Sports Village
River Walk
Mountain Village
Golf Estates
The River
Center Parcs
Private Mansions
Lagoon Village
Show Village and Trial
Lagoon
Wellness Village
Basin Village
Mountain Village I Master Plan I Proposed Assets
Mountain Village I Après ski Plaza
Mountain Village I Flavors of Azerbaijan Food Pavilions
Mountain Village I Ski Chalets
Mountain Village I Event Plaza
Gabala Golf Estate I Aerial View
Golf Estate Villas
Gabala Golf Club
Gabala 18 hole Golf Course
Center Parcs
Center Parcs I Cottages
01 02 05 06 03 08 07 04 LEGEND 01 - Waterfront Community 02 - Woodland Living 03 - Wellness Community 04 - Arts & Culture District 05 - Riverfront Community 06 - Canal Side Community 07 - Lakeside Community 08 - Expo Communities North Waterfront,
Prime Waterfront and Greenfield Plots Outside City Edge Architecture Branding Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre Development Studies Sustainable Design Vision Status of Project • Concept Masterplan Complete • Master Plan submitted to the Authorities for Review and Approval • Detail Master Plan Stage in Progress Residential Units 48,600 GFA 8.2 mil sq.m 88.2 mil sq.ft Total Land Area 13.5 mil sq.m 145.3 mil sq.ft Developed Land Area 6.2 mil sq.m 66.7 mil sq.ft
Minsk, Belarus
Land Use Plan
Concept Diagram
SWOT Analysis
Almaty Hills, Almaty, Kazakhstan
Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel USD 208 Mil.
Status of Project
• Concept Masterplan Complete
• Master Plan Approved by The Almaty Municipal Government City Planning Agency
• Master Plan Approved by The Municipal Government Agency
“Tourism and Foreign Affairs Department of Almaty City”
• Detail Master Plan Stage in Progress
Pre Development Studies
Design
Residential Units 1,234 GFA 690,308 sq.m 7.43 mil. sq.ft Land Area 3.48 mil. sq.m 37.44 mil. sq.ft Hotel Keys 80 Town Center GFA 61,100 sq.m 657,436 sq.ft Architecture Branding
Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning
Structural
Sustainable Design Vision
Bedroom Luxury Residence
Updated Contemporary Kazakh Vernacular – 2,345 square meter (25,232 square feet)
8
Bedroom Luxury Residence
Updated Contemporary Kazakh Vernacular – 1,415 square meter (15,225 square feet)
7
5 Bedroom Luxury Residence
Updated Contemporary Kazakh Vernacular – 668 square meter (7,188 square feet)
Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Approved by Community Review Board • Master Plan Approved by Board of Cultural District • Detail Master Plan Stage in Progress Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Landscape Architecture Market Analysis Masterplanning Pre Development Studies Structural Design Sustainable Design Vision
Residential Units 1,600 GFA 243,000 sq.m 2.6 mil sq.ft Land Area 60,703 sq.m 653,400 sq.ft Hotel Keys 400 Retail GLA 12,000 sq.m 129,120 sq.ft
Ohio Riverfront Development, Pittsburgh, PA,USA Redevelopment of Ohio River Waterfront Warehouse Plots
Ninth & Penn Mixed-use Development, Pittsburgh, PA, USA
Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust
Urban Renewal – Development of City of Pittsburgh Parking Authority Parking Site Residential Units 420 GFA 74,350 sq.m 800,000 sq.ft Land Area 10.594 sq.m 114,000 sq.ft Hotel Keys 160 Retail GLA 4,768 sq.m 51,300 sq.ft Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre Development Studies Structural Design Sustainable Design Vision
Reed District Mixed-use Development, Nashville, TN, USA
Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust
Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel Residential Units 324 GFA 122,491 sq.m 1,318,000 sq.ft Land Area 37,009 sq.m 398,222 sq.ft Hotel Keys 250 Retail GLA 2,221 sq.m 23,900 sq.ft Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre Development Studies Structural Design Sustainable Design Vision
Broadway
Diagram – Ground Level Permeability Site Plan Relationship Diagram
Corridor
Contextual Height Diagram
Broadway Corridor Diagram – Urban Anchor and Corner View Corridor
Bloom Riverfront Development, USA
Status of Project • Concept Masterplan Completed • Detailed Masterplan Completed • Schematic Design for Hotel Design Completed • Master Plan Approved by City Planning Commission
Urban Revitalization of Downtown Parking Site – Hotel, Luxury Residential, Mayo Clinic, Post-Op Service Apartments and Retail Residential Units 550 GFA 92,903 sq.m 1.0 mil. sq.ft Land Area 8,985 sq.m 96,679 sq.ft Hotel Keys 160 Retail GLA 3,200 sq.m 34,432 sq.ft Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre Development Studies Sustainable Design Vision
Reed District Mixed-use Development, Nashville, TN, USA
Status of Project • Concept Masterplan Complete • Master Plan Approved by City Planning Commission • Master Plan Under Review by Board of The Pittsburgh Cultural Trust
Urban Revitalization of Downtown Cultural Site – Office, Retail, Civic Center, Residential and Hotel Residential Units 324 GFA 122,491 sq.m 1,318,000 sq.ft Land Area 37,009 sq.m 398,222 sq.ft Hotel Keys 250 Retail GLA 2,221 sq.m 23,900 sq.ft Architecture Branding Economic Feasibility Studies Engineering Infrastructure Design Interior Design Landscape Architecture Market Analysis Masterplanning Pre Development Studies Structural Design Sustainable Design Vision
Broadway
Diagram – Ground Level Permeability Site Plan Relationship Diagram
Corridor
Contextual Height Diagram
Broadway Corridor Diagram – Urban Anchor and Corner View Corridor
ABU DHABI, AMMAN, BRATISLAVA, CAIRO, DUBAI, JACKSONVILLE, KOCHI, LANCASTER, OBERHAUSEN, PITTSBURGH, RAS AL KHAIMAH, RIYADH WWW.AE7.COM April 2023 AE7 Waterfront Developments
THANK YOU.