Texas A&M University Agriculture Headquarters Weekly Report: 1/4/10-1/8/10
North View of HQ
Mock-up
Buck hoist Delivery
North View of VC
•
Installing roof drains at the HQ is ongoing.
•
Installation of stair two is complete through the fourth floor.
•
Tie-backs are installed on the HQ roof.
•
Poured sidewalks at parking lot 97 approach on 1.6.10.
•
The material buck hoist was delivered to the site on 1.6.10.
•
Installing misc steel at windows and exterior skin at the HQ.
•
Installing the 37ft columns at the VC first floor are ongoing.
•
Framed, formed, and reinforced the low roof at the VC.
•
Excavation for the cistern tank will begin on Monday 1.11.10.
•
The low roof at the VC will be placed next week.