Texas A&M University Agriculture Headquarters Weekly Report: 1/25/10-1/29/10
North Aerial of HQ
North Crane Road
Setting AHU in the HQ
Above Ceiling Duct
Elevator Shaft
•
The luffing crane was demobilized and hauled of site on 1/27/10.
•
The Air Handling Units were set in the HQ.
•
Poured pans at stair 3 on Monday 1/25/10.
•
All 3 sets of stairs and the buck hoists are open and operational at the HQ.
•
Curbs at the penthouse were placed on 1/25/10.
•
The upper roof at the VC was placed on 1/27/10.
•
Installation of the stair going from floor 1 to 2 at the VC has started .
•
The high scaffolding at the VC will be removed next week.
•
Started exterior framing on the HQ 1st floor.
•
The lintel angel installation on the HQ is ongoing.
•
Installing the CMU parapet on the Penthouse Roof.
Cable Tray