2009-08-07

Page 1

Texas A&M University Agriculture Headquarters Weekly Report: 8/3/09-8/7/09

Pile Caps

South View

Storm Sewer Line

South View

Crawlspace Walls

East View

Forming, reinforcing, and poring pile caps and shear walls

Drilling and pumping auger cast piles

Backfilling west side of building to sub grade

Receiving and unloading reinforcing and tightening form systems

Installing 30” storm sewer on the east side of the site.

Finished sanitary sewer lines F

Installation of electrical duct bank started

Installation of electrical primary manholes complete.

Forming shear walls and crawlspace walls is ongoing

Start demo of approaches off of John Kimbrough.

Site fills and grading ongoing