Texas A&M University Agriculture Headquarters Weekly Report: 8/3/09-8/7/09
Pile Caps
South View
Storm Sewer Line
South View
Crawlspace Walls
East View
•
Forming, reinforcing, and poring pile caps and shear walls
•
Drilling and pumping auger cast piles
•
Backfilling west side of building to sub grade
•
Receiving and unloading reinforcing and tightening form systems
•
Installing 30” storm sewer on the east side of the site.
•
Finished sanitary sewer lines F
•
Installation of electrical duct bank started
•
Installation of electrical primary manholes complete.
•
Forming shear walls and crawlspace walls is ongoing
•
Start demo of approaches off of John Kimbrough.
•
Site fills and grading ongoing