Texas A&M University Agriculture Headquarters Weekly Report: 5/3/10-5/7/10
North View of HQ
First Floor Restroom Rough-In’s
Southwest View of HQ
Framing Full Height Partition at VC
Metal Wall Panel at Penthouse
Exterior Brick Veneer
•
Window frame installation is ongoing along the HQ north side.
•
Damproofing the northwest side of the HQ is complete.
•
Stone is being installed on the west side of the HQ.
•
Glass is being hung on the north side 1st and 2nd floors of the HQ.
•
Metal panels are completely installed at the penthouse.
•
VC low roof installation is complete.
•
MEP above ceiling rough-in is ongoing at the VC.
•
Brick installation on the southeast side of the HQ is complete with the southwest side starting.
•
Eyebrow framing at the HQ is complete with sheathing of the eyebrow at 85% complete.
•
Starting the installation of metals panels on the exterior of the HQ.