Texas A&M University Agriculture Headquarters Weekly Report: 5/10/10-5/14/10
Southeast View of HQ
North View of HQ
Window Framing at 5th Floor
One Siding Walls in HQ
West Curtain Wall Framing @ Stairs
Gutter Extension Support
•
Safety Cook-out held today for all workers along with a raffle give-a-way.
•
The installation of main feeders to the switch gears are nearly complete.
•
Metal panel installation on the southeast side of the HQ is ongoing.
•
Scaffold is being erected at the main entrance of the HQ.
•
Sheathing of the eyebrow is 100% complete.
•
Damproofing and window frame installation is ongoing along the north side of the HQ..
•
Started hanging sheetrock on all partitions to deck on the first floor..
•
MEP above ceiling rough-in is ongoing at the VC.
•
Started installing the misc steel supports for the Herculite doors.
•
Layout of radius furdowns and diffusers in the VC has started.
•
The curtain wall steel supports at the VC will be painted next week.