Texas A&M University Agriculture Headquarters Weekly Report: 5/17/10-5/21/10

Metal Panels @ Eyebrow

Tape and Float Corridor Walls

North View of HQ

Painted Curtain Wall Framing

HQ Curtain Wall at North Elevation

VC Exterior Framing

Curtain wall steel supports at the VC are painted.

Metal panel installation at the southeast and northwest sides of the HQ is ongoing.

Installing stone at the main entrance to the HQ.

Tape and floating first floor walls in the HQ.

Installing exterior framing on the 1st floor at the VC.

Insulating duct work throughout the HQ.

Installing thermal lines for the Public Building.

Stone is starting to be laid on the north side of the HQ.

Completed the installation of misc steel on the exterior of the VC.

Tying in duct to the AHU’s in the HQ.

The west buck hoist will be taken down next Thursday 5/27/10.