Texas A&M University Agriculture Headquarters Weekly Report: 5/17/10-5/21/10
Metal Panels @ Eyebrow
Tape and Float Corridor Walls
North View of HQ
Painted Curtain Wall Framing
HQ Curtain Wall at North Elevation
VC Exterior Framing
•
Curtain wall steel supports at the VC are painted.
•
Metal panel installation at the southeast and northwest sides of the HQ is ongoing.
•
Installing stone at the main entrance to the HQ.
•
Tape and floating first floor walls in the HQ.
•
Installing exterior framing on the 1st floor at the VC.
•
Insulating duct work throughout the HQ.
•
Installing thermal lines for the Public Building.
•
Stone is starting to be laid on the north side of the HQ.
•
Completed the installation of misc steel on the exterior of the VC.
•
Tying in duct to the AHU’s in the HQ.
•
The west buck hoist will be taken down next Thursday 5/27/10.