2010-06-04

Page 1

Texas A&M University Agriculture Headquarters Weekly Report: 5/31/10-6/4/10

North View of HQ

MEP Rough-In in Exhibit Area

North View of VC

Scaffold at VC Exterior Columns

Elevator Shaft at VC

Glass in Exterior Windows

Erect scaffolding at exterior columns at VC.

Damproofing the exterior of the HQ is 95% complete.

Installing stone at the main entrance to the HQ 80% complete.

MEP rough-in in the exhibit areas of the VC is ongoing.

Metal panel installation at the eyebrow is complete on the south side and 65% complete on the remainder of the HQ.

Caulking windows and installing trim caps on the southeast side of the HQ.

Installing vanity supports at the toilet rooms.

Started damproofing the exterior walls on the VC

Framing and sheathing exterior walls at the VC is 90% complete.

Continue to one side walls throughout the HQ.