Scope of Business
Gulf Corners For Trading & General Contracting (GCTC) is specialized in Electrical & Instrumentation, Mechanical, Hydrotesting, T&I, Civil activities such as Pipe Fabrications, Maintenance of Water Tanks, Steel Structures Erection, Fire Protection Systems, Cathodic Protection & Overhead Power Lines etc. GCTC Offers its clients a wide range of diversified high quality services. Its presents area of expertise includes the following;
GCTC is registered under
1.
2.
3. 4. 5. 6.
Supply and installation of electrical equipment such as; power transformers, power cables, control cables, ATS, PMCC power generators, NGR, Rectifier, Lighting systems & overhead power line including cathodic protection for wellhead and pipelines. Testing & Commissioning of power transformer, NGR, CT, PT, Cables, Breakers, Motors, Relays, ATS, Power Generators, Rectifier, Lighting Systems, Fire Alarm Control systems, Valve testing, Hydro testing & HVAC system. Construction of U/G and A/G Oil, Gas and Water Pipe lines. Grit blasting & protective Coating for steel, Concrete, Pipes, and storage Tanks etc., Specialized. Installation of Fire Protection Systems / Instrument and piping. T & I (Testing & Inspection) activities.
CR
2050086821
Zakat
3008191762
Chamber Of Commerce
69649
Vat
300819176200003
Saudi Aramco Vendor
10051508
SABIC Vendor
057233
Saudi Electricity Vendor 5008340
SOCPE OF PROJECTS
1
Our Project Experience
2
T&I Experience
1
Our Project Experience 1- Our Project Experience
Our Project Experience 1-
INSTALLATION OF SOLAR SYSTEM (SHAYBAH NGL PIPELINE)
10-
GOSP-4 T&I SHUDOWN ACTIVITIES
2-
INSTALLAITON OF 230KV 3-PHASE/DC PANEL INSTALLATION
11-
MFC GOSP-2&3 SHUDOWN ACTIVITIES
3-
KHUFF GAS WELL :TINT-53- MADRIKA-5
12-
MFC FOR UPGRAIDING INSTRUMENT AIR CONTROL
4-
FLOW/TRUNKLINE & SCRAPER AREA ABU HADRIYAH ABHD-135 OBS WELL
13-
SYPD/GOSP-02&03 TO INSTALL NEW CCTV MONITORING
5-
CONSTRUCTION OF CHEMICAL STROAGES: UWIP-1 - UWIP-111-ADWIP-1
6-
SHAYBAH NGL BERMING PROJECT
7-
BUILDING UPGRADATION OF COAST GUARD RAS TANURA
8-
REMAINING CONSTRUCTON ACTIVITIES AT SHAYBAH NGL PIPELINE
9-
CONSTRUCTION OF NEW RTU SHELTER AT NORTH HARADH & GHAZAL
1- Our Project Experience
1-INSTALLATION OF SOLAR SYSTEM (SHAYBAH NGL PIPELINE) The project comprised installation of solar panels for valves and scrapper trap stations for NGL pipeline Km 0 to Km 633. It includes all types of Civil, Electrical, Mechanical, E & I, Cathodic Protection and Commissioning. 1- Our Project Experience
Client:
Saudi Aramco
Project code:
6510689770
Year:
2015
Discipline:
Civil, Electrical, Mechanical, E& I, CP, Solar System
Location:
SHAYBAH NGL Pipe Line (Abqaiq to Shaybah)
2-INTALLAITON OF 230KV 3PHASE/DC PANEL INSTALLATION The project comprised removing & installation of 230kv 3-phase air disconnect switches, DC panel installation at control room, AC,DC & control cable laying and termination as per cable routing, repair existing civil foundation. 1- Our Project Experience
Client:
Saudi Electricity Company
Project code:
M3051/110
Year:
2017
Discipline:
Civil, Electrical
Location:
HOFUF, AL AHSA
3-KHUFF GAS WELL :TINT-53MADRIKA-5
The project comprised well site preparation. Company is appointed to do Civil, Structural, Mechanical, Piping, Electrical, Instrumentation, Hydrostatic testing, Well cathodic protection etc. 80% work have achieved for this project. 1- Our Project Experience
Client:
Saudi Aramco
Project code:
20/06WH2017-05-00040
Year:
2017
Discipline:
Civil, E & I, Piping, Steel Structure, CP
Location:
HARADH
4-FLOW/TRUNKLINE & SCRAPER AREA ABU HADRIYAH ABHD-135 OBS WELL The project comprised well site preparation, well site type-III fence, electrification & lighting, installation of PDHMS surface panel, well site instrumentation, cathode protection, wellhead guardrail and operating platform, mechanical and steel structural works etc. 1- Our Project Experience
Client:
Saudi Aramco
Project code:
16011001
Year:
2017
Discipline:
Civil, Electrical, Mechanical, CP etc.
Location:
ABU HYDRIYA
5-CONSTRUCTION OF CHEMICAL STROAGES: UWIP-1 UWIP-111-ADWIP-1
The project comprised building structure for three chemical stores, concrete foundations, Acid drain system to chemical storage tank, installation of 250 CMU walls etc. 1- Our Project Experience
Client:
Saudi Aramco
Project code:
6510780711
Year:
2016
Discipline:
CIVIL & STRUCTURAL WORKS
Location:
UTHMANIYA WATER INJECTION PLANT
6-SHAYBAH NGL BERMING PROJECT
Client:
Saudi Aramco
Project code:
6510752382
Stabilization of mainline pipe Berming Seg. I, II & III.
Year:
2016
Exposure and safeguarding of CP test cable to above
Discipline:
Civil, E & I etc.
of berm.
Location:
SHAYBAH NGL PIPE LINE (KM 0 to KM50)
Scope of work for this project includes Berming &
1- Our Project Experience
7-BUILDING UPGRADATION OF COAST GUARD RAS TANURA
In this project company removed the existing roof asbestos and replace corrugated roofing sheet sandwich panel for Terminal South Coast Guard Sargent rooms at Ras Tanura terminal.
1- Our Project Experience
Client:
Saudi Aramco
Project code:
6510748581
Year:
2016
Discipline:
Civil & Structural works
Location:
RAS TANURA
8-REMAINING CONSTRUCTON ACTIVITIES AT SHAYBAH NGL PIPELINE In scope of work it includes installation of fence & gates. Fabrication, coating, installation crash barriers & guard rails. Hydrotesting for blow down lines. Installation of cable markers, grounding, fabrication and installation of steel covers for LDS. 1- Our Project Experience
Client:
Saudi Aramco
Project code:
6510817148
Year:
2018
Discipline:
Civil, E & I, Mechanical, Structural etc.
Location:
SHAYBAH NGL Pipe Line
9- Construction of New RTU Shelter at NORTH HARADH & GHAZAL Client:
Saudi Aramco
GCTC IS CONSRTUCTING the 3 NEW RTU SHELTERs as
Project code:
KHRS-SC-671-00075
per SAUDI ARAMCO with all required equipment like
Year:
In Progress
Discipline:
CIVIL & STRUCTURAL WORKS
Location:
NORTH HARADH & GHAZAL
electrical Panels , HVAC Systems , hollow metal doors & Raised Floor tiles 1- Our Project Experience
10- GOSP-4 T&I SHUDOWN ACTIVITIES
Gctc Completed the Shut down Activities at GOSP 4 safely and 6 days ahead . All the activities like N2 Purging, Steaming , Hydro jetting ,Grit blasting, Coating , bolt tightness-tensioning
1- Our Project Experience
Client:
Saudi Aramco
Project code:
6510911105
Year:
2019
Discipline:
SHUDOWN ACTIVITIES
Location:
Shaybah
11- MFC GOSP-2&3 SHUDOWN ACTIVITIES
Gctc Completed the Shut down Activities at GOSP 4 safely and 6 days ahead . All the activities like N2 Purging, Steaming , Hydro jetting ,Grit blasting, Coating , bolt tightness-tensioning
1- Our Project Experience
Client:
Saudi Aramco
Project code:
6510922880
Year:
2019
Discipline:
SHUDOWN ACTIVITIES
Location:
Shaybah
12- MFC FOR UPGRAIDING INSTRUMENT AIR CONTROL
Client:
Saudi Aramco
Project code:
6510913451
three instrument control panels and its sequencer
Year:
2019
panel for shaybah Gosp-2 B09 Plant and connecting
Discipline:
E&I, Testing and Commissioning
Location:
Shaybah
The scope of work, it includes the replacement of
the new control panels with existing DCS 1- Our Project Experience
13- SYPD/GOSP-02&03 TO INSTALL NEW CCTV MONITORING
In the scope of work it includes the procurement, installation of CCTV camera, fiber optic cable, converters, transceivers, equipment cabinets, camera pole, fiber patch panel, Ethernet data switch, equipment cabinet, video recorders, servers and associated VMS software/licenses. 1- Our Project Experience
Client:
Saudi Aramco
Project code:
6510913390
Year:
In Progress
Discipline:
Civil, Electrical, CCB, Testing & Commissioning
Location:
Shaybah
2 T&I Experience
2- T&I Experience
2 Safety +
Quality
+
Duration 2- T&I Experience
For successful project, put safety first. GCTC completed project with all safety measures. On each stage of work GCTC showed high levee of safety measures without any major or minor incident.
GCTC focused on quality during its all stages of job. A team of professionals showed quality standard work on this job.
GCTC completed T & I Project with remaining allocated time frame for this project which shows efficiency of our team.
2
2- T&I Experience
T&I SHUDOWN MAIN ACTIVITIES 2 Purging N2
2- T&I Experience
Swing Blind (Close Position)
Steaming
Manual Cleaning & Hydro Jetting
Grit blasting & Coating
Inspection & Box up
Leak Test & housekeeping
2
1 Purging N2: After Isolation for all valves except relive & drain valves, we start Purging N2 with N2 generator unit Or Liquid N2 Vaporizer as per required.
2- T&I Experience
2
2- T&I Experience
2
2 Swing Blind (Close Position): If Purging N2 Succeed, we start swing blind according to isolation procedures for inlets & outlets by blinds and required tools.
2- T&I Experience
2
2- T&I Experience
2
3 Steaming: After Complete Swing Blind, we start steaming with digresser by right capacity steam boiler until drain coming clean.
2- T&I Experience
2
2- T&I Experience
2
4 Manual Cleaning & Hydro Jetting: We use hydro jetting machine to clean internal part and to prepare for inspection by right capacity machine and certified people.
2- T&I Experience
2
2- T&I Experience
2
5 Grit blasting & Coating: As per the inspection, we perform the Grit blasting for required area with complete set blasting machine and Certified blaster , then apply the Correct Coat type by the inspected Coating machine and certified coater.
2- T&I Experience
2
2- T&I Experience
2
6 Inspection & Box up: We perform any extra required jobs like (Anodes Change, Demister pad change ‌.etc.) then start the Box up by tightness & tensioners tools as per the required.
2- T&I Experience
2
2- T&I Experience
2
7 Leak Test & housekeeping: We start leak test by N2 equipment to reach to the required pressure for each vessel as mentioned from Operation team. Then complete the house keeping for all our area & tools and keep it safe in the correct places.
2- T&I Experience
2
2- T&I Experience
2