Committed to superior quality
Contents: 1-
Company Information
04
2-
Introduction
05
3-
Company Policy
06
4-
Organization Chart
07
5-
General civil projects
08
Arabian Qudra Factory
09
Renewal of birth railways at Dammam seaport Gate no .9
13
Renewal of railways inside King Abdulaziz port Gate No. 35
17
FRIDAYS Hafar Al Batin
21
Construction of Temporary Facilities
25
6-
Precast projects
28-39
7-
iso certificate
40
8-
locations
41
9-
Our Clients
42
Company Information 1-
Company Name:
Saudi International Construction Contracting Co.
2-
Head Office Address:
Kingdom of Saudi Arabia Al Khobar, King Fahd Road, Al Jisr Districtbuildingno.6750 Tel:+966 13 8022872 Fax +966 13 8020275
3-
Contact person
Khaled Rashad (Projects Manager) Mob: +966 541155382 Mail: project01@siccontra.com
4-
Web Site:
www.siccontra.com
5-
E-Mail:
projects@siccontra.com
6-
CR:
2051173638
7-
Zakat Certificate:
3100805914
8-
CHAMBER OF COMMERCE:
208016
9-
VAT certificate No
310080591400003
10-
REGISTER CONTRACTOR FOR:
44
SAUDI ARAMCO:
10060443
MODON:
127000880
SEC
5015770
Saipem
106738
Mcdermott
14634
Introduction
Firstly, we would like to express our greetings to your respected management and we would like to take this opportunity to introduce our company Saudi International Construction Contracting Co. as well we would like to express our interest in providing our services. We are highly committed to the agreed planned work schedule to be performed according to highest related engineering standards and specs. Saudi International Construction Contracting Co. was established as Saudi national Company registered in Al Khobar KSA.
Saudi International Construction Contracting
We are specialized in all offshore civil precast
Co. registered in all types of civil construction
works such as (pipe sleepers - concrete
works and all activities related to civil works.
mattresses – grout bags - concrete blocks–
We are supported by extensive experiences
shallow
in construction in the field of industrial civil
concrete ramps – concrete saddles / tunnels
works such as (industrial plants – specialized
for offshore electric cables etc..).
concrete
Our company has highly qualified and skilled
works
–
residential
buildings-
infrastructure works - administration and
water
markers
concrete
base–
manpower, to provide a large package of
commercial buildings – electric network civil works – electric substation civil works).
5
01
Company Policy
02
Our company Management believes that quality of its services in all aspects and stages is of a paramount importance as to fulfill its commitments towards customers specified requirements.
03
Management and employees are all responsible for achieving quality in full compliance with regulations, international codes and standards which are appropriate to the companys business requirements.
04
We committed to the excellence of its service by continuous improvement and by maintaining a Quality Management System that meets Saudi Aramco standards and relevant international standards.
05 06 07 08
66
SICCONTRA aims at the provision of high quality services in order to satisfy its customers in a safe working environment.
The company and all employees are committed to perform their duties in contribution to the achievement
Quality objectives are regularly measured using proper key performance indicators.
Company policy to provide and maintain a safe working environment and to adhere to operating practices that will safeguard all employees. To this end, top level management gives their full support.
The company management shall periodically review this policy to ensure its relevance and appropriateness to the company
Organization Chart
7
General civil projects Saudi International Construction Contracting Co. registered in all types of civil construction works and all activities related to civil works. We are supported by extensive experiences in construction in the field of industrial civil works such as (industrial plants – specialized concrete works – residential buildings-infrastructure works - administration and commercial buildings – electric network civil works – electric substation civil works
88
Arabian Qudra Factory
9
Project details Client`s Company:
Arabian Qudra (ABU NAYYAN HOLDING)
Main Contractor:
Saudi International Construction Contracting
Contract Title:
Arabian Qudra Factory
Awarded Date:
20-MARCH-2018
Work Location :
Dammam 2nd industrial city
Scope of work:
• • • • • • • • • • • • • • • 01 10
Preparation Of Underground Foundations Construction of infra-structure Steel Structure Erection Work Preparation Of Soil Under The Concrete Slabs Pouring Of Factory Concrete Ground Slab Completion Of Installation Of Sandwich Panels Concrete Slabs Inside Existing Steel Building Building Of Transformers Rooms Construction Of Admin Building Installation Of Rollup Shutter Doors Installation of HVAC system Installation of sewage system & clean water system Installation of firefighting system Installation of electric & CCTV system Installation of aluminum cladding for admin building
11
21 12
Renewal of birth railways at Dammam seaport Gate no .9 13
Project details Client`s Company:
Saudi Railways Organization
Main Contractor:
Saad Al-Mobty & Partners Contracting
Contract Title:
Renewal of birth railways at Dammam seaport- Gate no .9
Awarded Date:
MAY-2013
Work Location :
Dammam seaport- Gate no .9
Scope of work:
• • • •
Excavation and demolishing of old railways up to 0.7m depth and width of 2.8 m Compaction of soil in the excavated area Fabrication and Installation of steel re-bars for the railway base Concreting of the base under the new railways for 16 Kms
41 14
Special concrete implemented in critical places this department is Very specialized in carrying out the special concrete in critical places which need the most experienced engineers , technicians , workers to do these jobs, where ever the site whenever the time, whatever the job was, so our team have the ability to handle everything that could happen during the job like unexpected weather or meeting a problem that make us to change our plan , schedule of time to be more quick .
15
61 16
Renewal of railways inside King Abdulaziz port Gate No. 35 17
Project details Client`s Company:
Saudi Railways Organization
Main Contractor:
Saad Al-Mobty & Partners Contracting
Contract Title:
Renewal of railways inside King Abdulaziz port Gate No. 35
Awarded Date:
MAY-2013
Work Location :
Dammam seaport- Gate no35
Scope of work:
• • • • • • •
Excavation and demolishing of old railways up to 1m depth and width of 4 m Compaction of soil in the excavated area Fabrication and Installation of steel rebars for the railway base Concreting of the base under the new railways for 20 Kms Excavation and demolishing of old gantry crane pass way Compaction the soil of in excavated area Concreting the new gantry crane pass way for 2 KM 81 18
19
02 20
FRIDAYS Hafar Al Batin
21
Project details Client`s Company:
Americana
Main Contractor:
Saudi International Construction Contracting
Contract Title:
TGI FRIDAYS Restaurant Full Construction
Awarded Date:
9-NOV-2015
Work Location :
Hafar Al Batin
Scope of work: • • • • • • • • • • 22 22
Preparation Of Underground Foundations Construction of infra-structure Preparation Of Soil Under The Concrete Slabs Pouring Concrete Ground Slab Construction of all civil structure Installation of HVAC system Installation of sewage system & clean water system Installation of firefighting system Installation of electric & CCTV system Interior decoration
23
42 24
Construction of Temporary Facilities 25
Project details Client`s Company:
SAUDI ARAMCO
Main Contractor:
JGC Gulf International Co
Contract Title:
Construction of Temporary Facilities Work Site Offices for JGC Gulf International Ltd
Awarded Date:
2010
Work Location :
Manifa Pj-Tanajib Water Treatment Plant Expansion
Scope of work: • • • • • • • • • • • 62 26
Construction of J Gulf main office Construction of Saudi Aramco office Construction of Material control office Construction of Smoking shelter Installation of Car parking shelter Supply & Installation of Generator with shelter Installation of fence and gate Installation of sewage system & clean water system Installation of firefighting system Installation of Electric power supply Installation of Communication system
27
Precast Works
We are specialized in all offshore civil precast works such as (pipe sleepers – concrete mattresses – grout bags – concrete blocks – shallow water markers concrete base – concrete ramps – concrete saddles / tunnels for offshore electric cables etc..). Our company has highly qualified and skilled manpower, to provide a large package of services and solutions to achieve our client›s business objectives and plans.
82 28
Client`s:
SAUDI ARAMCO
Main Contractor: McDermott ARABIA COMPANY LTD Contract NO.:
6600034600
Po. No.:
D6200-PO-0923-ALL-PVZ01-0001-0-01
Contract Title:
BI-10-01263 LONG TERM AGREEMENT II TEN SFNY SLIPOVER PLATFORMS WITH ASSOCIATED PIPELINES& CABLES
Contract Scope of work: Fabrication and Transportation of 496 Concrete Mattress of Sizes 3 m x 3 m x 0.15 m & 3.2 m x 3.2 m x 0.3 m
Client`s:
SAUDI ARAMCO
Main Contractor: McDermott ARABIA COMPANY LTD. Contract NO.:
6600034600
Po. No.:
D7057-PO-0921-ALL-PVZ01-0002-0-01
Contract Title:
BI-10-02016 / BI-12-18000 - EPCI of MRJN TP-10 and Associated Facilities Project
Contract Scope of work: Fabrication and Transportation of 200 Concrete Mattress of Sizes 3 m x 3 m x 0.15 m , 6.2 m x 3.2 m x 0.3 m & 3.2 m x 3.2 m x 0.3 m
Client`s:
SAUDI ARAMCO
Main Contractor: McDermott ARABIA COMPANY LTD. Contract NO.: Po. No.:
D7358-PO-0921-ALL-PVZ01-0001-0-01
Contract Title:
MRJN 234/239, 250/251 & MRJN 240/249 Existing Platforms Upgrade Project (LSTK)
Contract Scope of work: fabrication of 496 Concrete Mattress of Sizes:3 m x 3 m x 0.15 m, 6.2 m x 3.2 m x 0.3 m &3.2 m x 3.2 m x 0.3 m
29
Client`s:
SAUDI ARAMCO
Main Contractor: DYNAMIC INDUSTRIES LTD Contract NO.:
6600035785
Po. No.:
C091PC-201810-001
Contract Title:
BI-10-00909 (5) PIPELINES REPLACEMENT AT BERRI FIEL
Contract Scope of work: Fabrication and Transportation of 322 Concrete Mattress of Sizes 6 m x 3 m x 0.15 m & 6.2 m x 3.2 m x 0.3 m
Client`s:
SAUDI ARAMCO
Main Contractor: DYNAMIC INDUSTRIES LTD Contract NO.:
6600035785
Po. No.:
O2000908-0003
Contract Title:
BI-10-00909 (5) PIPELINES REPLACEMENT AT BERRI FIELD
Contract Scope of work: Fabrication and Transportation of 8 Concrete crossing support of sizes 7m X 2.5m x1.2 m, 7m X 2.5m x1.3 m 7m X 2.5m x1.5 m& 7m X 2.5m x1.6 m
Client`s:
SAUDI ARAMCO
Main Contractor: DYNAMIC INDUSTRIES LTD Contract NO.:
6600035785
Po. No.:
O2000908-0003
Contract Title:
BI-10-00909 (5) PIPELINES REPLACEMENT AT BERRI FIELD
Contract Scope of work: Fabrication of 10 Concrete bridge type sleepers of size 5m X 2.5m x0.6m
03 30
Client`s:
KJO
Main Contractor: McDermott ARABIA COMPANY LTD Contract NO.:
KJO/951/0108/11
Po. No.:
D6200-PO-0923-ALL-PVZ01-0001-0-01
Contract Title:
KJO RATAWI PROJECT
Contract Scope of work: Fabrication and Transportation of 734 Concrete Mattress of the following Sizes 3.1 m x 3 m x.15 m & 6.2 m x 3.2 m x.3 m
Client`s:
SAUDI ARAMCO
Main Contractor: McDermott ARABIA COMPANY LTD. Contract NO.:
D6360
Po. No.:
0923-D6360-DD329041 01
Contract Title:
Aramco LTA CRPO 4 Pipe line
Contract Scope of work: Fabrication and transportation of 45 crossing support pipe sleepers of sizes:
5m X 2.5m X 0.4m, 5m X 2.5m X 0.7m, 5m X 2.5m X 1m, 5m X 2.5m X 1.3m 5m X 2.5m X 1.6m, 5m X 2.5m X 0.3m, 5m X 2.5m X 0.45m, 5m X 2.5m X 0.8m 5m X 2.5m X 1.2m, 5m X 2.5m X 0.55m, 5m X 2.5m X 1.1m & 5m X 2.5m X 0.6m
Client`s:
KJO
Main Contractor: McDermott ARABIA COMPANY LTD. Contract NO.:
HQ 951 PC 10
Po. No.:
0921-D6224-DD344656 00
Contract Title:
Hout KRL Offshore facilities Project
Contract Scope of work: Fabrication and transportation of 65 crossing support pipe sleepers of sizes: 10mX2mX0.45m,10mX2mx0.7m,10m X 2m X0.3m,10mX2mX1.7m, 10mX2mx1.5m, 10mX2mX1.2m,10mX2mX1.1m & 10mX2mX0.9m
31
Client`s:
SAUDI ARAMCO
Main Contractor: McDERMOTT ARABIA COMPANY LTD Contract NO.:
6600018864
Po. No.:
0923-D6377-DD348937 00
Contract Title:
D6377 Aramco Karan K45 Project
Contract Scope of work: Fabrication and Transportation of 9 Concrete Mattresses of sizes 3 m x 3 m x0.3 m, 6 m x 3 m x0.4 m & 5 m x 3 m x0.3 m
Client`s:
SAUDI ARAMCO
Main Contractor: McDERMOTT ARABIA COMPANY LTD Contract NO.:
6600018863
Po. No.:
0923-D6290-DD362849 00
Contract Title:
D6290 Aramco Manifa Field Development Project
Contract Scope of work: Fabrication and transportation of 14 crossing support pipe sleepers of sizes: 5m X 2.5m X 0.4m, 5m X 2.5m X 0.7m, 5m X 2.5m X 1m 5m X 2.5m X 1.3m,5m X 2.5m X 1.6m
Client`s:
SAUDI ARAMCO
Main Contractor: McDERMOTT ARABIA COMPANY LTD. Contract NO.:
6600018863
Po. No.:
0923-D6290-DD371242 00
Contract Title:
BI-10-00909 (5) PIPELINES REPLACEMENT AT BERRI FIELD
Contract Scope of work: Fabrication and transportation of 42 concrete mattresses of sizes 3 m x 3 m x 0.15 m, 6 m x 3 m x 0.3 m
23 32
Client`s:
SAUDI ARAMCO
Main Contractor: McDermott ARABIA COMPANY LTD Contract NO.:
6600018863
Po. No.:
0923-D6376-DD377518
Contract Title:
D6376 Aramco Safaniya Phase II
Contract Scope of work: Fabrication and transportation of 129 concrete mattresses of sizes 3 m x 3 m x0.3 m & 3 m x 3 m x0.15 m
Client`s:
KJO
Main Contractor: McDermott ARABIA COMPANY LTD. Contract NO.:
D6159
Po. No.:
0921-D6159-DD379532 00
Contract Title:
KHAFJI KJO SITE, RABIH
Contract Scope of work: Fabrication and transportation of 20 concrete mattresses of the following sizes: Concrete Mattress Of Size 3 M X 3 M X0.15 M
Client`s:
SAUDI ARAMCO
Main Contractor: MCDERMOTT MIDDLE EAST, INC. Contract NO.:
6600034600
Po. No.:
D6327-PO-0923-PVZ01-0001-0001-0-01
Contract Title:
D6327-Aramco: Replace Power Generation System – Marjan GOSPs
Contract Scope of work: Fabrication and transportation of 178 concrete mattresses of sizes: 6m x 3 m x0.3 m, 3 m x 3 m x0.3 m ,6 m x 3 m x0.3 m with neoprene pad & 3 m x 3 m x0.3 m with neoprene pad
33
Client`s:
SAUDI ARAMCO
Main Contractor: MCDERMOTT MIDDLE EAST, INC. Contract NO.:
6600035804
Po. No.:
D6255-PO-0921-ALL-PVZ01-0001-0-01
Contract Title:
D6255-LTA for EPCI of Offshore Facilities
Contract Scope of work: Fabrication and transportation of 559 concrete mattresses of sizes 6 m x 3 m x0.3 m & 3 m x 3 m x0.3 m
Client`s:
SAUDI ARAMCO
Main Contractor: MCDERMOTT MIDDLE EAST, INC. Contract NO.:
6600035804
Po. No.:
D6255-PO-0921-ALL-PVZ02-0001-0-01
Contract Title:
D6255-LTA for EPCI of Offshore Facilities
Contract Scope of work: Fabrication and transportation of 220 concrete sleepers of sizes:
6m X 2.5m X 0.3m, 6m X 2.5m X 0.7m, 6m X 2.5m X 1m, 8m X 2.5m X 0.3m 6m X 2.5m X 1.1m, 6m X 2.5m X 1.2m , 6m X 2.5m X 1.3m & 6m X 2.5m X 0.5 m
Client`s:
KJO
Main Contractor:
MCDERMOTT MIDDLE EAST, INC.
Contract NO.:
HQ 980 PC 11
Po. No.:
0921-D6224-DD382530 05
Contract Title:
D6224 KJO Hout (KRL) Offshore Gas Facilities
Contract Scope of work: Fabrication and transportation of 80 concrete sleepers of sizes: 10m X 2.4m X 0.4m, 10m X 2.4m X 0.9m, 10m X 2.4m X 1.2m, 8m X 2.4m X 2.2m 10m X 2.4m X 1.3m, 9m X 2.4m X 1.6m ,10m X 2.4m X 2 m & 10m X 2.4mX 2.4 m
43 34
Client`s:
SAUDI ARAMCO
Main Contractor: McDermott ARABIA COMPANY LTD Contract NO.:
6600035804
Po. No.:
D6848-PO-0921-ALL-PVZ02-0002-1
Contract Title:
D6848-SFNY HEADER #9 AND ASSOCIATED FACILITIES
Contract Scope of work: Fabrication and transportation of 38 concrete sleepers of the following sizes: 6m X 2.5m X 0.3m, 6m X 2.5m X 0.6m, 8m X 2.5m X 0.9m
Client`s:
SAUDI ARAMCO
Main Contractor: McDermott ARABIA COMPANY LTD. Contract NO.:
6510772166
Po. No.:
D6875-PO-0921-ALL-PVZ02-0-01
Contract Title:
BRRI 2 JACKETS, 2 PDMs AND ASSOCIATED FACILITIES
Contract Scope of work: Fabrication and transportation of 12 concrete sleepers of the following sizes:
L X B X H(MM)= 6000 X 2500 X 500 & L X B X H(MM)= 6000 X 2500 X 700
Client`s:
KJO
Main Contractor: McDERMOTT MIDDLE EAST INC Contract NO.:
HQ 980 PC 11
Po. No.:
0923-D6224-DD386748 00
Contract Title:
CONCRETE FOUNDATION FOR SHALLOW WATER MARKER
Contract Scope of work: Fabrication and transportation of 3 shallow water marker foundation with size of 3.2 M X 3.2 M X 1.35 M height
35
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600019096
Po. No.:
784059
Contract Title:
Contract Title: LTA offshore long term agreement
Contract Scope of work: Fabrication and transportation of 43 crossing support pipe sleepers of sizes: 6m X 2.5m X 0.45m, 6m X 2.5m X 0.6m, 6m X 2.5m X 1m, 6m X 2.5m X 0.65m 6m X 2.5m X 1m, 6m X 2.5m X 1.2m , 6m X 2.5m X 0.7m & 6m X 2.5m X 0.9 m
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600026284
Po. No.:
837825
Contract Title:
BI-10-00909 (5) PIPELINES REPLACEMENT AT BERRI FIELD
Contract Scope of work: Fabrication and transportation of 13 crossing support pipe sleepers of sizes: 6m X 2.5m X 1.65m, 6m X 2.5m X 2.15m, 6m X 2.5m X 1.55m, 6m X 2.5m X 2.95m & 6m X 2.5m X 3.25m
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600026284
Po. No.:
758386
Contract Title:
S.ARAMCO WASIT GASPROGRAM (SA)
Contract Scope of work: Fabrication and transportation of 10 crossing support pipe sleepers of sizes: 7m X 2.5m X 1.2m, 9m X 2.5m X 0.9m, 9m X 2.5m X 0.6m
63 36
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600026284
Po. No.:
944577
Contract Title:
S.ARAMCO WASIT GAS PROGRAM (SA)
Contract Scope of work: Fabrication and transportation of crossing support (CONCRETE SADDLE) of size: 8m X 3.6m X 0.8m
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600026283
Po. No.:
997283
Contract Title:
FLANK#6 FOR T&I 3PDMS & P/L CABLES
Contract Scope of work: Fabrication and transportation of 15 crossing support pipe sleepers of the following sizes:
6m X 2.5m X 0.475m, 6m X 2.5m X 0.85m, 6m X 2.5m X 1.1m, 6m X 2.5m X 1.3m
Client`s:
Saudi Aramco
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600026283
Po. No.:
997901
Contract Title:
SPN/STAR LTA T & I 3 PDMS & P/L CABLES
Contract Scope of work: Fabrication and transportation of 130 concrete mattresses for cable crossing of the following sizes: Concrete Mattress of size 6 M X 3 M X0.3 M
37
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600026284
Po. No.:
1085251
Contract Title:
LTA HSBH ARBI & KARAN FOC
Contract Scope of work: Fabrication and transportation of 25 concrete mattresses for cable crossing of the following sizes: Concrete Mattress of size 6 M X 3 M X0.3 M
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600019096
Po. No.:
1017466
Contract Title:
LTA MARJAN ZULUF 2 NEW CRPO (SA) PROJECT
Contract Scope of work: Fabrication and transportation of 40 concrete ramps for alignments frame with following size: Concrete ramp of size 8 M X 2.4 M X0.6 M
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600019096
Po. No.:
1024129
Contract Title:
LTA MARJAN ZULUF 2 NEW CRPO (SA) PROJECT
Contract Scope of work: Fabrication and transportation of 65 crossing support pipe sleepers of sizes: 9m X 2.5m X 0.45m, 9m X 2.5m X 0.6m, 9m X 2.5m X 0.75m, 9m X 2.5m X 0.6m
83 38
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600019096
Po. No.:
1161993
Contract Title:
LTA MARJAN ZULUF 2 NEW CRPO (SA) PROJECT
Contract Scope of work: Fabrication and transportation of 5 concrete mattresses for cable crossing of the following sizes: Concrete Mattress of size 6 M X 2.5 M X0.3 M
Client`s:
SAUDI ARAMCO
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600019096
Po. No.:
1163709
Contract Title:
LTA ARBI 20/23 GAS WELLHEAD PROJECT
Contract Scope of work: Fabrication and transportation of 8 crossing support pipe sleepers of sizes: 6m X 2.5m X 0.85m& 9m X 2.5m X 0.6m
Client`s:
Saudi Aramco
Main Contractor: Snamprogetti Saudi Arabia Contract NO.:
6600019096
Po. No.:
1163735
Contract Title:
S.ARAMCO KARAN 7, 52/60&TP-1 AUX GAS PROJECT
Contract Scope of work: Fabrication and transportation of 4 crossing support pipe sleepers of the following sizes: 6m X 2.5m X 1.15m , 9m X 2.5m X 0.6m & 6m X 2.5m X 1.6m
39
2 0 2 1 0 1 52
2 0 2 1 / 0 1 / 25
ﺷﺮﻛﺔ ﺍﻹﻧﺸﺎﺀﺍﺕ ﺍﻟﺴﻌﻮﺩﻳﻪ ﺍﻟﺪﻭﻟﻴﻪ ﻟﻠﻤﻘﺎﻭﻻﺕ ﺷﺮﻛﺔ ﺷﺨﺺ ﻭﺍﺣﺪ
2051173638 ﺍﻹﻧﺸﺎﺀﺍﺕ ﺍﻟﻌﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻲ ﺍﻟﺴﻜﻨﻴﺔ,ﺍﻹﻧﺸﺎﺀﺍﺕ ﺍﻟﻌﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻲ ﺍﻟﻐﻴﺮ ﺍﻟﺴﻜﻨﻴﺔ ،ﻳﺸﻤﻞ )ﺍﻟﻤﺪﺍﺭﺱ ،ﺍﻟﻤﺴﺘﺸﻔﻴﺎﺕ ،ﺍﻟﻔﻨﺎﺩﻕ ...ﺍﻟﺦ(,ﺍﻹﻧﺸﺎﺀﺍﺕ ﺍﻟﻌﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻲ ﺍﻟﺤﻜﻮﻣﻴﺔ,ﺇﻧﺸﺎﺀﺍﺕ ﺍﻟﻤﺒﺎﻧﻲ ﺍﻟﺠﺎﻫﺰﺓ ﻓﻲ ﺍﻟﻤﻮﺍﻗﻊ ,ﺗﺮﻣﻴﻤﺎﺕ ﺍﻟﻤﺒﺎﻧﻲ ﺍﻟﺴﻜﻨﻴﺔ ﻭﺍﻟﻐﻴﺮ ﺳﻜﻨﻴﺔ
25/07/1446
25/01/2025
04 40
Head Office Address:
Saudi Arabia , Al- Khobar 34432, P O Box 7334
Fabrication Yard
Saudi Arabia , Al- Dammam , Nabia
41
Our Clients
Tel. No. : +966 13 8022872 Fax No.: +966 13 8020275 www.siccontra.com projects@siccontra.com
Head Office Address:
Saudi Arabia , Al- Khobar 34432, P O Box 7334
Fabrication Yard
Saudi Arabia , Al- Dammam , Nabia