1. THIS DRAWING IS THE PROPERTY OF - GOLDEN SQUARE ENGINEERING CONSULTANTS (P.O.BOX 126049, DUBAI, UAE ) IT IS FORBIDDEN TO PRODUCE IT'S CONTENTS IN ANY FORM, EXCEPT FOR THE INTENDED PURPOSE.
LIST OF DRAWINGS SHEET NUMBER L001 L051 L052 L053 L101 L102 L103 L201 L202 L203 L300 L301 L302 L303 L310 L311 L312 L313 L401 L402 L403 L701 L702 L703 L704 L705 L801 L802 L803 L804 L805 L806 L807 L808 L809 L810 L811 L901 L902 L903
SHEET NAME
SCALE
LIST OF DRAWINGS, GENERAL NOTES & LEGENDS GENERAL ARRANGEMENT PLAN (GROUND FLOOR) GENERAL ARRANGEMENT PLAN (5TH FLOOR) GENERAL ARRANGEMENT PLAN (27TH FLOOR) SETTING-OUT PLAN (GROUND FLOOR) SETTING-OUT PLAN (5TH FLOOR) SETTING-OUT PLAN (27TH FLOOR) HARDSCAPE MATERIALS & SITE FURNITURE PLAN (GROUND FLOOR) HARDSCAPE MATERIALS & SITE FURNITURE PLAN (5TH FLOOR) HARDSCAPE MATERIALS & SITE FURNITURE PLAN (27TH FLOOR) PLANTING SCHEDULE TREES, SHRUBS & GROUNDCOVERS PLANTING PLAN (GROUND FLOOR) TREES, SHRUBS & GROUNDCOVERS PLANTING PLAN (5TH FLOOR) TREES, SHRUBS & GROUNDCOVERS PLANTING PLAN (27TH FLOOR) LIGHTING SCHEDULE LIGHTING PLAN (GROUND FLOOR) LIGHTING PLAN (5TH FLOOR) LIGHTING PLAN (27TH FLOOR) DRAINAGE GRADING & LEVELS PLAN (GROUND FLOOR) DRAINAGE GRADING & LEVELS PLAN (5TH FLOOR) DRAINAGE GRADING & LEVELS PLAN (27TH FLOOR) ADULTS POOL DETAILS PART 01 ADULTS POOL DETAILS PART 02 KID'S POOL & SHOWER STALL DETAILS INTERACTIVE FOUNTAIN DETAILS WATER FEATURE DETAILS PAVING DETAILS - PART 01 PAVING DETAILS - PART 02 PAVING DETAILS - PART 03 SEATING 01, SEATING 02 & GLASS RAILING DETAILS SEATING 03 & SEATING 04 DETAILS STEPS, TYPICAL RAMP & RAILING DETAILS SITE FURNITURE DETAILS TYPICAL PLANTER WALL TYPE 01, TYPE 02 & MOVABLE PLANTER DETAILS TYPICAL PLANTER WALL TYPE 03, TYPE 04 & FEATURE POTS DETAILS KID'S PLAY EQUIPMENT DETAILS OUTDOOR GYM EQUIPMENT DETAILS TYPICAL PLANTING DETAILS - PART 01 TYPICAL PLANTING DETAILS - PART 02 TYPICAL PLANTING DETAILS - PART 03
NOT TO SCALE 1:200 1:200 1:200 1:200 1:200 1:200 1:200 1:200 1:200 NOT TO SCALE 1:200 1:200 1:200 NOT TO SCALE 1:200 1:200 1:200 1:200 1:200 1:200 AS SHOWN AS SHOWN AS SHOWN 1:20 1:20 1:20 1:20 1:20 AS SHOWN 1:20 1:20 1:20 1:20 1:20 AS SHOWN AS SHOWN NOT TO SCALE NOT TO SCALE NOT TO SCALE
CONSTRUCTION NOTES
CONSTRUCTION NOTES
LAYOUT NOTES
SOIL PREPARATION NOTES
PLANTING NOTES
1. SEE PROJECT SPECIFICATIONS FOR FURTHER INFORMATION.
8. STATIONING PROVIDED AT TREE/PALM PITS ARE TO CENTERLINE/MIDPOINT OF PIT.
2. WORK PERFORMED SHALL COMPLY WITH THE FOLLOWING: 2.1. THESE GENERAL NOTES, AND CONSTRUCTION DOCUMENTS AND SPECIFICATIONS. 2.2. ALL APPLICABLE DUBAI, UAE AND INTERNATIONAL CODES, ORDINANCES AND REGULATIONS. ALL CODES LISTED IN SPECIFICATIONS AND DRAWINGS SHALL BE INCLUSIVE OF ALL CODES, REGULATIONS AND REQUIREMENTS ADOPTED BY THE DUBAI MUNICIPALITY, INCLUDING ALL AMENDMENTS.
9. ANY DAMAGE TO SURROUNDING PAVEMENT OR PAVERS DUE TO THIS PROJECT SHALL BE REPAIRED TO OWNER'S SATISFACTION, AT CONTRACTORS COST.
5. FOR DIMENSIONS OF EXISTING BUILDINGS, PROPOSED BUILDING IMPROVEMENTS, AND RELATED WORK, REFER TO THE ARCHITECTURAL DRAWINGS.
1. CONTRACTOR TO CONDUCT A SOIL EVALUATION TO DETERMINE THE PROPOSED SOIL'S COMPOSITION, COMPACTION RATE, NUTRIENT QUALITIES, ORGANIC CONTENT, PH LEVELS, AND WATER HOLDING CAPABILITIES. REFER TO THE TECHNICAL SPECIFICATION 320 90 00 PLANTING FOR THE IDEAL CHARACTERISTICS OF THE PLANTING SOIL.
1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO FURNISH AND INSTALL ALL PLANT MATERIAL AS SHOWN ON THESE DRAWINGS AND DESCRIBED IN THE SPECIFICATIONS.
3. VERIFY LOCATIONS OF PERTINENT SITE IMPROVEMENTS INSTALLED UNDER OTHER CONTRACTS. IF ANY PART OF THIS PLAN CANNOT BE FOLLOWED DUE TO SITE CONDITIONS, CONTACT OWNER'S REPRESENTATIVE FOR INSTRUCTIONS PRIOR TO COMMENCING WORK. 4. CONTACT LOCAL UNDERGROUND UTILITY SERVICES FOR UTILITY LOCATION AND IDENTIFICATION, PRIOR TO COMMENCING WORK. VERIFY LOCATION OF ALL UTILITIES, BUILDING WALLS, ROADS AND CURBS AFFECTING HARDSCAPE AND PLANTING. NOTIFY OWNER OF ANY DISCREPANCIES WITH PLANS. 5. PERFORM EXCAVATION IN THE VICINITY OF UNDERGROUND UTILITIES WITH CARE AND BY HAND, IF NECESSARY. THE CONTRACTOR BEARS FULL RESPONSIBILITY FOR THIS WORK AND DISRUPTION OF DAMAGE TO UTILITIES SHALL BE REPAIRED IMMEDIATELY AND AT NO EXPENSE TO THE OWNER. 6. FOR STREETSCAPE IMPROVEMENTS ALONG ROAD, ALIGN ALL TREE PITS, UTILITY MANHOLES AND PAVEMENT JOINTS (EXCEPT AT CURB RETURNS) PARALLEL AND PERPENDICULAR TO THE STREET KERBS. ALL LINES OF PAVING TO BE PARALLEL AND PERPENDICULAR UNLESS OTHERWISE NOTED. 7. CONTRACTOR SHALL ADJUST, HORIZONTALLY AND VERTICALLY, ALL EXISTING UTILITY PULL BOXES, VAULTS, MANHOLES, ETC., WHICH ARE IN CONFLICT WITH THE IMPROVEMENTS. FINAL LOCATION SHALL BE DETERMINED BY THE OWNER'S REPRESENTATIVE. THE PREFERRED LOCATION IS IN THE PLANTING OR SOFTSCAPE AREAS.
ABBREVIATION LEGEND
GENERAL NOTES
GENERAL NOTES
1. EXISTING UNDERGROUND UTILITIES AS SHOWN MAY NOT BE IN THE ACTUAL LOCATION. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL ACCURATELY LOCATE AND MARK ANY AND ALL EXISTING/AND RECENTLY INSTALLED UNDERGROUND UTILITIES. ANY UTILITY LINES NOTED TO REMAIN THAT ARE DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES AND NOTIFY THEM OF CONSTRUCTION ACTIVITIES PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES A MINIMUM OF 72 HOURS PRIOR TO STARTING CONSTRUCTION OR PER REGULATORY REQUIREMENTS.
4. NO DISRUPTION OF TRAFFIC FLOW SHALL BE PERMITTED ON THE STREET ADJACENT TO THE PROPERTY DUE TO CONSTRUCTION ACTIVITY; UNLESS PROPER AUTHORIZATION HAS BEEN OBTAINED FROM THE GOVERNING AUTHORITY. CONTRACTOR SHALL NOTIFY THE MUNICIPALITY AND RESIDENTS TO BE AFFECTED BY CONSTRUCTION ACTIVITY A MINIMUM OF 48 HOURS IN ADVANCE.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION RELATED SURVEYING, INCLUDING ALL LAYOUT AND GRADE STAKING. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL ACCURATELY LOCATE AND MARK ALL PROPERTY LINES AND CORNERS AND SHALL LIMIT ALL CONSTRUCTION ACTIVITY TO BE WITHIN THE PROPERTY BOUNDARIES.
7. THE CONTRACTOR SHALL COORDINATE HIS REMOVAL OF EXISTING UTILITIES AS NOTE WITH THE LOCAL UTILITY AGENCY.
3. THE CONTRACTOR SHALL REMOVE ALL UNSUITABLE FILL MATERIAL FROM THE SITE INCLUDING BUT NOT LIMITED TO: TREE STUMPS, BRANCHES, VEGETATION, AND CONSTRUCTION DEBRIS. ANY MATERIAL REMOVED FROM THE SITE SHALL BE DISPOSED OF IN AN APPROVED LEGAL MANNER.
GENERAL LEGEND BASEMENT LINE
GENERAL ARRANGEMENT LEGEND SECTION TAG
X000
X
P1
5. ALL SITE FURNITURE AND EQUIPMENT SHALL BE INSTALLED TO THE MANUFACTURER'S SPECIFICATIONS, UNLESS OTHERWISE NOTED. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL BUILDING AND CONSTRUCTION PERMITS AS REQUIRED BY GOVERNING ENTITIES.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE HEALTH, SAFETY AND WELFARE OF ITS EMPLOYEES AND SUBCONTRACTORS EMPLOYEES FOR THE DURATION OF PROJECT CONSTRUCTION. OWNER WILL NOT BE HELD RESPONSIBLE FOR ACCIDENTS OR NEGLIGENCE.
P2
P3
9. ALL GENERAL PLAN DRAWINGS ARE IN METER UNLESS OTHERWISE STATED. 10. ALL DETAIL DRAWINGS ARE IN MILLIMETER UNLESS OTHERWISE STATED.
BLOW-UP TAG
X000
N 19.1120 E 28.9484 DIMENSION
P4
SETTING-OUT COORDINATES
DIMENSIONS
P5
DRAINAGE, GRADING & LEVELS LEGEND XXX+0.00
PROPOSED LEVELS
P6
SLOPE TO DRAIN 2% SLOPE
DETAIL NAME
X X000
DETAIL REFERENCE TAG
FD SD
DRAINAGE FALL WITH SLOPE PERCENTAGE FLOOR DRAIN SUB-DRAIN FOR TREE
BOTTOM OF KERB FINISH FLOOR LEVEL FINISH GRADE LEVEL ROAD LEVEL TOP OF KERB TOP OF SEAT TOP OF WALL
CONSTRUCTION NOTES 11. CONTRACTOR SHALL INSTALL CAULKED EXPANSION JOINTS AT ALL STRUCTURES, SUCH AS BUILDING WALLS THAT THE NEW SIDEWALK ABUT. 12. CAULK FOR EXPANSION JOINTS SHALL MATCH PAVEMENT COLOR ON EACH SIDE OF JOINT (WILL REQUIRE IN EXCESS OF THREE SEPARATE COLORS). 13. CONTRACTOR SHALL BRING ALL CONFLICTS OF UTILITIES WITH LANDSCAPE IMPROVEMENTS TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE.
LAYOUT NOTES 1. ON-SITE VERIFICATION OF ALL DIMENSIONS AND CONDITIONS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 2. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALE, LARGER SCALE OVER SMALLER SCALE, ADDENDA AND CLARIFICATIONS OVER PREVIOUS DOCUMENTS. 3. CONTRACTOR TO LAY OUT HARDSCAPE ELEMENTS AND VERIFY LAYOUT WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION. 4. HARDSCAPE ELEMENTS ARE DIMENSIONED ON THE LANDSCAPE LAYOUT PLAN. ANY DISCREPANCIES OR CONFLICTS WITH EXISTING CONDITIONS OR OTHER DRAWINGS SHALL BE REPORTED TO THE LANDSCAPE ARCHITECT IMMEDIATELY FOR PROPER CLARIFICATION OR ADJUSTMENT.
HARDSCAPE MATERIALS LEGEND
P8
HARDSCAPE MATERIALS LEGEND
SETTING-OUT LEGEND
PLOT LIMIT
X
BOK FFL FGL RL TOK TOSE TOW
10. 2 NOS. 1200X1200 mm MOCK-UP/SAMPLE PANELS EACH ARE REQUIRED PRIOR TO CONSTRUCTING (1) SIDEWALKS, (2) PLAZA PAVING, THRESHOLD PAVING, AND (4) HANDICAP RAMPS.
P7
PAVING TYPE 01: WALKWAY & SPILL-OUT AREA MATERIAL: PRE-CAST CONCRETE PAVERS COLOUR: LIGHT BEIGE FINISH: SHOT BLASTED SIZE: 300x300x50mm THICK PATTERN: AS INDICATED JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 02: WALKWAY MATERIAL: PRE-CAST CONCRETE PAVERS COLOUR: DARK BEIGE FINISH: SHOT BLUSTED SIZE: 300x300x50mm THICK PATTERN: RUNNING BOND JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 03: WALKWAY MATERIAL: PRE-CAST CONCRETE PAVERS COLOUR: A. GREY - 50% B. DARK GREY - 50% FINISH: SHOT BLUSTED SIZE: 300x300x50mm THICK PATTERN: PIXEL JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 04: WALKWAY MATERIAL: PRE-CAST CONCRETE PAVERS COLOUR: A. GREY - 50% B. DARK GREY - 50% FINISH: SHOT BLUSTED SIZE: A. 600x600x50mm THICK B. 600x600x50mm THICK PATTERN: AS INDICATED JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 05: WALKWAY MATERIAL: PRE-CAST CONCRETE PAVERS COLOUR: LIGHT GREY FINISH: SHOT BLUSTED SIZE: 600x600x50mm THICK PATTERN: AS INDICATED JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 06: WALKWAY & SPILL-OUT AREA MATERIAL: PRE-CAST CONCRETE PAVERS COLOUR: DARK GREY FINISH: SHOT BLUSTED SIZE: 200x200x50mm THICK PATTERN: RUNNING BOND JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 07: PARKING & DRIVEWAY MATERIAL: PRE-CAST CONCRETE COLOUR: LIGHT GREY FINISH: SHOT BLASTED SIZE: 200x100x80mm THICK PATTERN: HERRINGBONE JOINT: 5mm JOINT FILLED WITH SAND
P9
PAVING TYPE 08: WALKWAY MATERIAL: PORCELAIN TILES COLOUR: A. LIGHT GREY - 50% B. DARK GREY - 50% FINISH: SMOOTH SIZE: 600x600x20mm THICK PATTERN: AS INDICATED JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 09: DECKING MATERIAL: COMPOSITE TIMBER COLOUR: LIGHT BROWN FINISH: ANTI-SLIP SIZE: 1200x150x20mm THICK PATTERN: AS INDICATED FIXING: TO SPECIALIST'S/MANUFACTURER'S
PAVING TYPE 10: SWIMMING POOL MATERIAL: PORCELAIN TILES COLOUR: A - LIGHT BEIGE - 40% B - BEIGE - 20% P10 C - MEDIUM BEIGE - 20% D - DARK BEIGE - 20% FINISH: SMOOTH SIZE: 50x50x20mm THICK PATTERN: RUNNING BOND JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 13: WALKWAY & BREAKFAST AREA MATERIAL: PORCELAIN TILES P11 COLOUR: GREY FINISH: SMOOTH SIZE: 200x200x20mm THICK PATTERN: AS INDICATED JOINT: 3mm COLOUR MATCH GROUT PAVING TYPE 14: BREAKFAST AREA MATERIAL: PORCELAIN TILES P12 COLOUR: GREY FINISH: SMOOTH SIZE: 300x600x20mm THICK PATTERN: AS INDICATED JOINT: 3mm COLOUR MATCH GROUT ES1
ES2
ES3
EPDM SURFACE 01: JOGGING TRACK MATERIAL: EPDM RUBBER COLOUR: GREEN FINISH: AS PER MANUFACTURER SIZE: 18mm THICK PATTERN: AS PER PLAN EPDM SURFACE 02: KID'S PLAY AREA MATERIAL: EPDM RUBBER COLOUR: A. RED B. LIGHT GREEN C. LIGHT BLUE FINISH: AS PER MANUFACTURER SIZE: 18mm THICK PATTERN: AS PER PLAN EPDM SURFACE TYPE 03: (PING-PONG ARE) MATERIAL: EPDM RUBBER COLOUR: A. RED B. LIGHT GREEN FINISH: AS PER MANUFACTURER SIZE: 15mm THICK PATTERN: AS PER PLAN SUPPLIER: KOMPAN (FLEXOTOP)
6. WHERE DIMENSIONS ARE CALLED AS "EQUAL," SPACE REFERENCED ITEMS EQUALLY, MEASURED TO THEIR CENTER LINES. 7. INSTALL INTERSECTING ELEMENTS AT 90 DEGREE ANGLES TO EACH OTHER UNLESS OTHERWISE NOTED. 8. PROVIDE EXPANSION JOINTS WHERE CONCRETE FLATWORK MEETS VERTICAL STRUCTURES SUCH AS WALLS, CURBS, STEPS AND BUILDING ELEMENTS. 9. ALL RADII OF WALKWAY INTERSECTIONS ON THE PLANS SHALL BE 1.20 M OR AS INDICATED ON THE PLANS.
GRADING NOTES 1. GRADING PLANS ARE FOR GRADING WORK ONLY, DO NOT USE FOR CONSTRUCTION OF OTHER IMPROVEMENTS. 2. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR OTHER EQUIPMENT OF MUD PRIOR TO ENTERING THE STREET RIGHT-OF-WAY, AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR ALLAY DUST AND TO TAKE WHATEVER MEASURES NECESSARY TO INSURE THAT THE STREETS ARE KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES. 3. INSTALL EROSION AND SEDIMENT CONTROL MEASURES AS NOTED AND SPECIFIED PRIOR TO BEGINNING CONSTRUCTION. 4. ALL AREAS DISTURBED BY THIS WORK SHALL BE ADEQUATELY STABILIZED WITH (WITH TOPSOIL, SEED AND MULCH) UNLESS OTHERWISE NOTED TO CONTROL EROSION AND SEDIMENTATION. 5. LOCATION OF EXISTING UNDERGROUND UTILITIES TAKEN FROM AVAILABLE RECORDS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATIONS BEFORE STARTING CONSTRUCTION.
2. PRIOR TO THE INSTALLATION OF THE PLANTS AND IRRIGATION SYSTEM, THE CONTRACTOR SHALL PREPARE SOIL TO ENSURE A PROPER ENVIRONMENT FOR PLANT ROOT DEVELOPMENT. 3. CONTRACTOR SHALL DE-COMPACT SOILS IN PLANTING AREAS BY ROTO-TILLING, DISKING OR RIPPING TO A DEPTH OF 150 mm (300 mm PREFERRED). DECOMPACTION OF SMALLER PLANTING AREAS, SUCH AS THOSE IN PARKING LOTS AND MEDIAN AMY REQUIRE THE REMOVAL OF COMPACTED SOIL AND DEBRIS TO A DEPTH OF 450 mm AND THEN REINSTALLED WITH REQUIRED AMENDMENTS. ALWAYS REMOVE DEBRIS OVER 50 mm IN SIZE FROM THE SOIL. 4. WHEN PERFORMING SOIL DE-COMPACTION, MULTIPLE PASSES ACROSS THE AREA MAY BE REQUIRED AND, WHEN POSSIBLE, SHOULD BE AT VARYING ANGLES TO ENSURE ADEQUATE COVERAGE. WHEN USING DISC OR RIPPING EQUIPMENT, IT IS REQUIRED THAT THE FINAL PASSES OVER THE AREA BE MADE WITH A ROTO-TILLER TO BREAK UP ANY LARGE CLUMPS TO MAKE FINAL GRADING EASIER. 5. AFTER INITIAL SOIL DE-COMPACTION PROCEDURES ARE PERFORMED, SOIL AMENDMENTS SHOULD BE ADDED. THE ADDITION OF SOIL AMENDMENTS IS DETERMINED FROM SOIL TESTS CONDUCTED PRIOR TO WORK COMMENCING. 6. REFER TO THE TECHNICAL SPECIFICATION 32 90 00 PLANTING FOR THE PREFERRED SOIL AMENDMENTS. 7. ALL AMENDMENTS SHOULD BE MIXED THOROUGHLY WITH EXISTING SOIL AND AN ADDITIONAL SOIL TEST WILL BE TAKEN TO ENSURE PROPER SOIL CONDITIONS PRIOR TO PLANTING.
6. FIELD VERIFY ALL EXISTING GRADES AND COMPARE WITH ABOVE PLAN. REPORT ALL DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO STARTING CONSTRUCTION OPERATIONS.
HARDSCAPE MATERIALS LEGEND E1
B1
B2
TREE PLANTING LEGEND P/WASH-R WASHINGTONIA ROBUSTA
T/CASS-S CASSIA SURATTENSIS
TABLE & CHAIRS BICYCLE RACK SAFETY BOLLARD
SCULPTURAL BENCH 03 NOTE: FOR FOR SITE FURNITURE DETAILS & SPECIFICATIONS, REFER TO SHEET L807
HOTEL OPERATOR APPROVAL (COMMENTS IF ANY) ATTENDEES
7. CONTRACTOR SHALL THOROUGHLY MIX ALL SOIL AMENDMENTS AND FERTILIZER PRIOR TO PLACEMENT IN PLANTERS. 8. SAMPLES OF FERTILIZERS, ORGANIC AMENDMENT, SOIL CONDITIONERS AND SEED SHALL BE SUBMITTED, PRIOR TO INCORPORATION. CONTRACTOR SHALL ALSO FURNISH TO THE OWNER'S AUTHORIZED REPRESENTATIVE A CERTIFICATE OF COMPLIANCE FOR SUCH FURNISHED MATERIALS. 9. FINAL LOCATIONS OF PLANT MATERIAL SHALL BE REVIEWED ON SITE BY THE OWNER'S AUTHORIZED REPRESENTATIVE/ LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
11. TREES PLANTED WITHIN 1.5M OF ANY HARDSCAPE OR STRUCTURES SHALL BE INSTALLED WITH A SUITABLE ROOT BARRIER AS APPROVED BY THE OWNER'S AUTHORIZED REPRESENTATIVE.
SHRUBS & GROUNDCOVERS PLANTING LEGEND
GC/BLUE-FL
GC/RHOE-D
T-DELO-R DELONIX REGIA (FLAME TREE)
GC/SESU-P
GC/SETC-P
T/PLUM-A PLUMERIA ALBA
NOTE: FOR TREE PLANTING SCHEDULE, REFER TO SHEET L300
LANDSCAPE LIGHTING LEGEND UL GL LP
GR/PASP-V
PORTULACA GRANDIFLORA
RUWL RUWWL
RECESSED UNDER WATER WALL LIGHT
-
-
-
Rev NO.
DATE
DESCRIPTIONS
BY
DEVELOPER :
RHOEO DISCOLOR
SESUVIUM PORTULACASTRUM
BUILDING NAME :
DOWNTOWN GATE
SETCREASEA PURPUREA
DESIGN AND BUILT : WADELIA TRILOBATA
P.O. BOX : 126049, DUBAI, UAE Phone : 04 3859882 Fax: 04 3859885 E_mail : info@gseng.ae
PASPALUM VAGINATUM (ADELAIDE)
PROJECT DESCRIPTION:
RESIDENTIAL , COMMERCIAL & HOTEL APARTMENT
2B + G + 47 FLOORS + ROOF
LOCATION : BURJ KHALIFA - DUBAI UAE PLOT NO. : 3450108 BUILDING TYPE :
MIX
USED
BUILDING
SHEET TITLE :
LIST OF DRAWINGS, LEGEND & GENERAL NOTES ARCHITECT
T.SAMMAK
STRUCTURE
EZZAT
REG. No.
6070
REG. No.
115604
WALL UPLIGHT
DRAWN :
LED LIGHT
SCALE :
NOTE: FOR LANDSCAPE LIGHTING SCHEDULE, REFER TO SHEET L310
GOLDEN SQUARE ENGINEERING CONSULTANTS
PENNISETUM SETACEUM
FOR PLANTING DETAILS & SPECIFICATIONS, REFER TO SHEET L901-L903
LIGHT POLE
-
REVISIONS:
GROUND LIGHT
RECESSED UNDER WATER LIGHT
LED
GR/PENN-S
BLUEBERRY FLAX LILLY
UPLIGHT
RECESSED WALL LIGHT
WUL
GC/WADE-T
CLERODENDRUM INERMI
NOTE: FOR SHRUBS & GROUNDCOVERS PLANTING SCHEDULE, REFER TO SHEET L300
RWL
SCULPTURAL BENCH 01 SCULPTURAL BENCH 02
DIRE APPROVAL (COMMENTS IF ANY)
6. LANDSCAPE CONTRACTOR SHALL TEST ALL PLANTER DRAINS PRIOR TO BACKFILL FOR POSITIVE DRAINAGE WHERE APPLICABLE.
T/CORD-S CORDIA SEBESTENA
GRAVEL SURFACE 01: MATERIALS: GRAVEL GS1 COLOUR: DARK GREY FINISH: NATURAL SIZE: 20-30mm DIAMETER PATTERN: LOOSELY LAID
RECYCLING BIN
4. EACH DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS & THE GENERAL STANDARD DETAILS. IN CASE OF ANY DISCREPANCIES, BRING IT TO THE KNOWLEDGE OF ENGINEER & SAME TO BE RESOLVED PRIOR TO EXECUTE OF WORK.
5. LANDSCAPE CONTRACTOR SHALL COORDINATE ALL WITH OTHER TRADES. THE LANDSCAPE CONTRACTOR SHALL PROTECT ALL LANDSCAPE MATERIALS FROM DAMAGE BY OTHER TRADES. DAMAGE FROM PAINTING, WINDOW WASHER EQUIPMENT SHALL BE REPAIRED TO THE OWNERS SATISFACTION AT CONTRACTORS COST.
GC/PORT-G
PAVING BAND 02: WALKWAY MATERIAL: PORCELAIN TILES COLOUR: DARK GREY FINISH: SMOOTH SIZE: 300x300x20mm THICK PATTERN: AS INDICATED JOINT: 3mm COLOUR MATCH GROUT
LITTER BIN
4. PLANT LISTS ON THESE DRAWINGS SHALL BE USED AS A GUIDE ONLY. CONTRACTOR SHALL CONDUCT A INDEPENDENT "TAKEOFF" TO VERIFY SIZES AND QUANTITIES OF PLANT MATERIALS SHOWN. PLAN QUANTITIES WILL GOVERN OVER BOQ QUANTITIES.
SH/CLER-I
PAVING BAND 01: PARKING & DRIVEWAY MATERIAL: PRECAST CONCRETE PAVERS COLOUR: DARK GREY FINISH: SHOT BLUSTED SIZE: 100x100x80mm THICK PATTERN: AS INDICATED JOINT: 3mm COLOUR MATCH GROUT
SITE FURNITURE LEGEND
3. ALL WORK ON THE IRRIGATION SYSTEM, INCLUSIVE OF HYDROSTATIC COVERAGE, OPERATIONAL TESTS AND BACKFILLING/COMPACTION OF TRENCHES SHALL BE PERFORMED BY THE IRRIGATION CONTRACTOR PRIOR TO PLANTING OPERATIONS.
3. DO NOT SCALE THE DRAWINGS. FOLLOW WRITTEN DIMENSIONS UNLESS OTHERWISE NOTED.
10. TREES SHALL BE PLANTED NO CLOSER THAN THREE METERS (3M) FROM UTILITIES.
POOL EDGE: MATERIAL: 'L' SHAPE PORCELAIN TILE EDGING COLOUR: DARK BEIGE FINISH: SMOOTH SIZE: 300x300x20mm THICK PATTERN: LINEAR JOINT: 3mm COLOUR MATCH GROUT
NOTE: FOR HARDSCAPE MATERIAL DETAILS & SPECIFICATIONS, REFER TO SHEET L801-L803
2. UNLESS DESIGNATED DIFFERENTLY WITHIN THESE DRAWINGS, STRUCTURAL AND HARDSCAPE IMPROVEMENTS SHALL BE INSTALLED PRIOR TO PLANTING OPERATIONS.
2. ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
DATE :
Eng. SULTAN
AS SHOWN
DRAWING NO.
L001
PURPOSE OF ISSUE :
APRIL - 2020
SHEET SIZE
PROJECT NO.:
A1
G1829 REVISION:
FINAL DESIGN SUBMISSION
A