Armenian Harvest Promotion Center 10 Vazgen Sargsyan Street, office 95 Yerevan, Armenia
Tel.: (+45) 70 20 14 10 SE: 21 66 77 81 E-mail: dgs@dgssupply.dk
Dear Mr. Armen Harutyunyan
Denmark the, 13th of January 2012
QUOTATION Quotation no.: 14912 Object: 3 ha Greenhouse for Tomatoes production,
Item 1.0
Greenhouse Production, Foundation Greenhouse Production, Construction
€ €
36.170 1.082.100
Item 2.0
Heating system
€
377.210
Item 3.0
Screen system
€
143.520
Item 4.0
Growing gutter system
€
174.680
Item 5.0
Irrigation – Fertilizer mixer
€
107.670
Item 6.0
High pressure Fog system
€
76.120
Item 7.0
Climate computer systems
€
38.090
Item 8.0
Ground cover
€
21.310
Item 9.0
Trolleys
€
106.180
Item 10.0
CO2 system
€
86.210
Item 11.0
Fans
€
36.670
Item 12.0
Sprayers
€
30.620
Item 13.0
Light
€
1.043.960
Item 14.0
Supervision / Engineering
€
133.750
Total EXW, Denmark
€
3.494.260
Transport, Insurance
€
534.000
Total DDU Armenia
€
4.028.260
Quotation no.: 14912
Page:
1
Not included: Mounting Concrete for foundation, approx: 220 m3, type 20MN/m2 Concreting Boiler Drain pipes in the ground Electric connections
Terms of payment: To be agreed
Delivery time:
Starting 8 weeks after Down Payment, During 20 weeks, according installation planning.
Quotation valid for accept within 45 days.
With best regards DANISH GREENHOUSE SUPPLY A/S
Ole Andersen Managing Director
Quotation no.: 14912
Page:
2
Specification Item 1.0
Greenhouse, Production
Delivery of greenhouse block, type VD, covering: 42 houses of 9,60 m x 76,50 m Total: 30.844,80 m2 The block is divided in 2 climate zones. 2 climate zones, each: 21 x 9,60 x 76,50 m
The calculation of this greenhouse is based on a snow load of 26 kg/m² and 30 m/sec wind speed – and according to description below.
Item 1.1
Foundation
Delivery of: Gable elements each 2,40 m Sidewall elements each 2,25 m. The elements are pre-fabricated, insulated concrete elements, with a height of 45 cm. Delivery of anchors for all pillars
Quotation no.: 14912
Page:
3
Item 1.2
Steel structures, consisting of:
Rafters of 9.60 m Side wall pillars Gable pillars Intermediate pillars Incl. Roof-, side-, and gable support. 3 lengths Z-formed iron profile for side walls and gables. Rafter distance: Sidewall height above foundation:
4,50 m 6,00 m
The roof water is led to the ground level through the gable pillars. All steel parts are hot galvanized.
Item 1.3
Aluminium Delivery of 86 lengths closed aluminium gutters incl. built-in condensation gutter. Delivery of aluminium profiles for 4 mm glass. 84 tops Each 4.80 m 1344 pcs. Ventilation openings for 3 pcs. glass size 1,125 m x 1,25 m. Delivery of rubber weather-strips for ventilation openings. Modular size: 1,125 m However, at the outer roof sides and the outer gables, the glass is half size. Delivery of aluminium profiles for 4 mm glass, width 750 / 800 mm for: 3 sides 2 gables
Quotation no.: 14912
6,00 x 76,50 m 6,00 x 403,20 m
Page:
4
Item. 1.4
Ventilation system For 2 climate zones. Consisting of lever arms, clamps, 32 mm traction pipes, 64 tooth racks, etc. 8 pcs. gear motors, consoles, profile couplings, 11/4� galvanized driving shaft.
Item 1.5
Doors and gates
2 pcs. Sliding doors of 2 pcs Sliding doors of
Item 1.6
W x H = 1,60 x 2,80 m W x H = 4,00 x 4,00 m
Glass Delivery of 4 mm horticultural glass for the roof and the windows. Delivery of 4 mm single glass for all walls and gables, incl. PVC capping.
Item 1.7
Suspension: Delivery of: 168 pcs. suspension supports of 4.80 m
Quotation no.: 14912
Page:
5
Item 2.0
Heating system in two departments, each department three zones: Bottom heating 12 pcs pipes per bay Growing heating 6 pcs pipes per bay Top heating 6 pcs pipes per bay Pipes and fittings Heating pipes, consisting of: 82.572 m. Ø51 mm 2.046 m. Ø108 mm 2.046 m. Ø89 mm And all necessary fittings. Mixing plants
Total mixing plants: 6 pcs. Primary bottom and growing heating Secondary top heating For mixing stations we supplies: 6 pcs. 3-way mixing valves 6 pcs. Grundfos cirkulation pumps 12 pcs. Butterfly valves 12 pcs. Thermometers Delivery weld together with the main pipe
Delivery of support for the pipes 85 pcs. RHS for main pipe, along the new walkway 11.340 pcs. Support for the bottom pipe (Ø51)
Quotation no.: 14912
Page:
6
Item 3.0
Screen system, for two climate zones
Delivery of materials for curtains for: 42 houses of 9.60 m x 76.50 m
Item 3.1
Screen for the roof, push – pull system The system, is split-up in 4 zones: 2 systems of 10 x 9.60 x 76.50 m 2 systems of 11 x 9.60 x 76.50 m
Distance of rafters: 4.50 m. Side wall height: 6.00 m The systems are mounted flat with the curtains lying on the wires, horizontally and pulled by rack-and-pinions, running from rafter to rafter. The systems are delivered as push/pull systems. The driving shaft consists of 1” steel tube shaft driving a Ø32 mm push tube. Further an aluminium rail with weather stripping is mounted at the front edge of the curtains. The house will be provided with 88 pcs rackand-pinions. The roof is delivered incl. 4 gear motors with built-in end stop. The bearing and supporting wires are made of nylon. All plastic parts are UV-stable and the iron is either stainless or galvanized. In order to prevent cold strokes at the sides canopies are delivered.
Quotation no.: 14912
Page:
7
Item 3.2
Roller curtains: Delivery of roller curtains for outside walls, total: 12 pcs. rollers of 2.00 x 201.60m 6 pcs. rollers of 2.00 x 76.50m consisting of: 18 pcs. pipe motors, Ă˜50 mm aluminium pipes etc.
All fabric is Ludvig Svensson, Sweden. Roof area: SLS 10 Ultra Roller Curtains: LS Solarwoven Ultra
Including all mechanical parts for screen system
Quotation no.: 14912
Page:
8
Item 4.0
Growing gutter Specifications Brand name Model Material
:
PL - Plateau gutter
: :
PL200 Steel S280GD0,6 mm thick, galvanized on both sides, underside painted, outside provided with a Polyester coating Polyester is a standard coating based on polyester, build from a primer and a polyester top coating with a total thickness of 27 micron. Thickness tolerance conform EN 10143 Outside, white; underside, off white For the mentioned gutter, the maximum load is 15 kg per m1 With a maximum load, we recommend a span no greater than 4,5 meters From the last or first suspension to the end of the gutter, a free span of max. 1 meter is allowed
:
Colour Max. load Span
: : : :
Free span
:
Gutter size
Quotation no.: 14912
Gutter width Gutter height Drain channels depth Drain channels width
205 mm 100 mm 40 mm 30 mm
Page:
9
Basic information greenhouse Section size Truss size
4,5 To be determined later
Post size
To be determined later
Number of gutters per bay
6 + 1 extra gutter at side gable wall
Gutter length Hangers
18.669 4.148
Slope Increase
No
m1 mm x mm mm x mm Pieces m1 Pieces 0%
Offered grow gutter Dep 1 (tomato) 127 gutters x
73,50
m1
=
9.334,50 m1
6
gutters x Dep 2 (tomato)
81
m1
=
486 m1
95
76,75
m1
=
7291,25 m1
Total to supply
=
18.669 m1
gutters x
The gutters will be produced in your greenhouse by our mobile roll forming machine, in order to supply the gutter lengths desired by you. This will enable FormFlex to keep the number of connections to a minimum. The gutters will be rolled on supports. These supports should be assembled and disassembled by the grower on instruction of FormFlex staff.
Quotation no.: 14912
Page:
10
If by circumstances, this is not possible, an alternative method will be chosen after consulting with you. FormFlex will furnish two engineers to roll the gutters. You should have your own personnel available for guiding and installing the gutters in the greenhouse. These activities should take place in consultation with our foreman. FormFlex will supply extra steel to make sure sufficient steel is always available to finish the project. The surplus of steel remains FormFlex property and will be collected after completion of the project.
Grow gutter Suspension Specifications The suspension will take place using a trellis clamping bracket a truss hook, a steel cable, and a V-bracket The suspension materials are made of sendzimer steel. The following materials will be supplied for this suspension:
4.148 pieces
Trellis clamping bracket incl. necessary installation materials
4.148 pieces Steel cable Ø2,5 mm, with a length of approximately 4.860 mm 4.148 pieces V-bracket Ø8 mm (symmetric), with a length of 700 mm, supporting under the gutter, rolled for larger bearing surface
The gutter will be reinforced using gutter clamping brackets. 12.444 pieces Gutter clamping brackets Ø4 mm (3 per 4,5m1)
Quotation no.: 14912
Page:
11
Stabilizer suspension To support the gutter in the last section and to stabilize the gutter lengthwise, stabilizer suspensions will be supplied (see attached drawing). Following materials will be supplied for this suspension: Truss hook Ă˜6 mm, with a length of 4.236 mm Turn buckle M6x60, with an average length of approximately 130 mm V-bracket Ă˜6 mm, with a length of 850 mm HP-bracket The above mentioned suspensions are to be installed by the grower Water handling Drain cisterns For drainage at the end of the gutters a drain cistern will be supplied for each gutter. 361 pieces
Black plastic drain cistern, with an extension of 40 mm (including 100 cm drain hose).
End caps To cover possible sharp edges on the gutter, an end cap will be supplied for each gutter. 361 pieces
Black plastic end cap for the gutter
The above mentioned water handling components are to be installed by the using the fasteners included.
Quotation no.: 14912
Page:
12
Options Crop support for tomato area Turn around brackets To guide the stems at the front and the end of the gutter, turn around brackets will be supplied as per the attached photo. (2 per gutter) 252 pieces
Turn around bracket Ø8mm
Stem supports To support the stems after lowering the plants, stem supports will be supplied. 14.360 pieces Stem supports Ø6 mm, 1 per 1,30 m1
Extra clamping brackets To support irrigation the tube underneath the gutter, gutter clamping brackets can be used. We supply extra brackets for optimal support (3 bracket per section extra)
12.444 pieces
Quotation no.: 14912
Gutter clamping brackets Ø4mm (extra)
Page:
13
Item 5.0
Irrigation – Fertilizer mixer
Item 5.1
Drip irrigation for four production areas Plant density 2,5 per m². 72.000 pcs
20 pcs.
Item 5.2
3 L/H pressure compensated drippers with pegs and 3/5 mm hose, preassembled. 20 mm PE pipe with holes for drips Connector between mainline and ø20 mm drip hose 50 mm PE pipe 90 mm PE pipe 50 mm end caps Solenoid valve stations each with solenoid valve and manometer Fittings for pipes
Fertilizer mixers for 72.000 tomatoes
2 pcs 4 pcs 2 pcs 2 pcs 2 pcs 2 pcs 6 pcs
Ami 900 fertilizer mixer and irrigation computer with CR 32-4 Grundfos pump = 32 m³/hour 4,2 bar PP40 fertilizer pump PP40 pump for acid EC control / alarm PH control / alarm Irrigation control program for 10 solenoid valves Filters and hose for tanks
Basin, filter and fertilizer tanks around the mixers: 4 pcs 2000 L fertilizer tank 2 pcs 1150 L acid tank 4 set Air stirring systems for the stock solution tanks 2 pcs 3” - 40m3/h disc filter 2 pcs 40 m3/h sand filter 2 pcs Bypass system All necessary PVC pipe and fittings
Quotation no.: 14912
Page:
14
Item 6.0
High pressure Fog system
FOG system for two departments each two zones
4 pcs
High pressure pump stations, 70 bar with filters 1640 l/h
4 pcs
SafeCool controller
3.060 m 1.600 pcs
High pressure hose Stainless steel pipe 12 mm High pressure nozzles, stainless steel Complete system with: Steel wire, cable straps and fittings for the installation
Quotation no.: 14912
Page:
15
Item 7.0
Climate control system The greenhouse is divided in two climate control zones. The computer controls the following climate functions: 2x 2x 2x 2x 4x 2x
Quotation no.: 14912
Bottom pipe heating (driving pipes on the ground) Top pipe, side and gable pipes heating Grow heating pipes Top ventilation, leeside-wind side Screens, energy saving CO2 concentration
Page:
16
Item 7.1
Climate computer
Consisting of: 1 pc. 4 pcs. 12 pcs. 2 pcs 4 pcs. 2 pcs. 1 pc
Item 7.2
LCC 4 Climate Computer, with 2 pcs EXP medium RTF 6 Electronic Temperature and humidity sensors, aspirated E10 pipe temperature sensors COT 222 CO2 sensor RO902 Master relay for ventilation motors RO902 Master relay for screen motors Weather station with sensor for outdoor temperature, wind speed, wind direction, sun radiation and rain
Super Link 1 pc.
Super link program for central operation and database system. Central control 5,0. Up to 8 compartment PC – not included
1 pc. 1 pc
ARC net communication cable with screen ARC net repeater
Quotation no.: 14912
Page:
17
Item 8.0
Ground cover
33.093,90 m2 Black ground cover made of polypropylene from Ludwig Svensson ( width: 5,15 m )
Item 10.0
Trolleys 20 pcs.
Electric trolley for the cultivation of plants
10 pcs
Battery charger, 20 amps
Quotation no.: 14912
Page:
18
40 pcs.
Item 10.0
Manual trolleys for the harvest
CO2 system, in two departments CO2 system, consisting of: 1 pc CO2 ventilator. CO2 alarm with shot off valve PVC main pipes, Ă˜200 mm along gable Ă˜65 mm dosing hose, 19.278 meter, 6 in each bay Regulating valves in each department, control by computer CO2 dispersion
Quotation no.: 14912
Page:
19
Item 11.0
Air circulation fans
2 fans in each 9,60 x 76,50 m house 84 pcs 4 pcs
Item 12.0
Fans D=518 mm, 1400 RPM, 7760 m続/h Relay Cables
Sprayers Spraying machine driving on the bottom heating pipes, with a spray mast and additional a manual spray lance. 2 pcs
Quotation no.: 14912
High pressure spraying wagon Spray mast with 10 nozzles on 4 rubber wheels Manual spray lance Pressure 55 bar Tank capacity 600 litre 90 m high pressure hose Automatic hose winder
Page:
20
Item 13.0
Artificial lights
Lights in 3,0 ha production area Average light intensity 100 W/m², corresponding to 10.000 lux The area is divided into: 10 zones in the production area. Each bay = 2 row with 48 pcs armatures Consisting of : 4.032 pcs.
10 pcs 6.426 m
Quotation no.: 14912
Light armatures 750w – 400 v with GE lucalox bulbs Electrical board, with fuses and automatic relays, controlled by climate computer Galvanized U-steel ( 40 x 40 x 3 mm ) Cable trays Cable 5 x 2,5 mm2 Fittings for the electric installation Supply voltage to switchboards to be supplied by the buyer.
Page:
21
Item 14.0
Supervision / Engineering
Supervision: 2 men in 4 periods of 14 days. For all other Items Customer must come with approx 12 men in 6 month. Excluding: lodging an local transport. Engineering: Delivery of complete drawings and documentation.
Transport, Insurance 52 pcs full truck loads. We are calculating with 24 hour custom clearing, Here after â‚Ź 270 per day per truck
Quotation no.: 14912
Page:
22