EPC 138kV Transmission Line Aldridge crews, as part of a JV with Kiewit, worked to rebuild nearly 40 miles of single and double circuit 138kV transmission line to increase electric reliability in Southeast Ohio. Aldridge managed the entire project and performed the civil and foundation drilling scope of work for this complex EPC project.