Hinter Market, Bielefeld

Page 1

concept SS 2014/2015 UIR

01 Anna Khodyreva Aleksandra Kudriashova Ericka Zambrano Xiangjun Tong

1

lifestyle design

micrologistics

medium/small logistics

textile

fashion

interiors

lightning

furniture


C2C | main principles as project guidelines SS 2014/2015 UIR

02

Version November 2014

Version November 2014

2


target groups SS 2014/2015 UIR

03

3


core ideas for masterplan | spatial solutions SS 2014/2015 UIR

04

healthy, reusable

4


masterplan SS 2014/2015 UIR

05

max. 16 m 16m

0.8

2.4

GE

30,000.00 m² multifunctional courtyards (shared space) service courtryards

phase [00]

phase [01]

phase [02]

5

42.88 % 33.35 % 23.77 %

max. 15°

total area of the plot buildings green + shared space circulation + parking lots

max. 45°

45 units for micrologistics & workshops

special features

29 units 2 units 12 units 2 units

5,465.73 sqm 7,397.71 sqm 2,289.55 sqm 5,996.72 sqm 1,464.00 sqm

100 sqm 200 sqm (double) 100 sqm + inner corridor 3,073.5 sqm

workshops / office units medium / small logistics shared open space underground parking green walls


flexible units SS 2014/2015 UIR

06

layout ground floor

6

layout 1st floor

type I [98 m²]

type II [98 m²]

section

section

layout ground floor

layout 1st floor


engineering systems and materials (C2C) SS 2014/2015 UIR

07

7


functions | uses SS 2014/2015 UIR

08

flexible unit type II

8

multifunctional shared space

offices/showrooms

flexible unit type I

medium/small size warehouse

winter garden

medium/small size warehouse

underground parking lot


visuals SS 2014/2015 UIR

09

mixed use public zone

9

service zone


SS 2014/2015 UIR

10

...place to work, to create and to grow

10


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.