September 7th, 2016

Page 1

INSIDE

PUBLISHED EACH WEDNESDAY

Vol. 52 No. 25

Serving the Trading Areas of Wawa & District Hawk Junction & White River

1 Year Subscription for only $70.00 by Mail or $50.00 by Carrier

Contact Our Offices in Wawa: Website: www.thealgomanews.ca

(95¢ + 5¢ HST)

$1.00

Wednesday, September 7th, 2016

Phone: (705)856-2267 Out-Of-Town Toll-Free: 1-800-461-9209 Fax: (705)856-4952 Email: waprint@vianet.ca

Office/Store Hours: Monday To Friday 9:00 a.m. - 4:00 p.m.

New Goose Soon To Stand Tall

Article by Barb Fisher   The Wawa Goose Monument is one of the most photographed icons in North America. Its roots are born from sheer determination of a local entrepreneur in the late 1950's to create a reason for travelers along the Trans Canada Highway to stop and not pass by our small town Wawa. It was our local entrepreneur Al Turcotte who convinced the government to pour the base for the Goose, and then Al paid for the monument construction and had it erected on the base as part of the official events in the opening of the Trans Canada Highway on September 17, 1960. The original plaster construction did not hold up well to weather and so the original Goose was replaced by a steel replica a few years later paid for by the town. Now, more than 50 years later the community must look at replacing the steel form which has weathered over the years and suffered severe rusting.   The Municipality is planning a strong media campaign around the dismantling of the current Goose and the arrival of the new Goose with the company who builds the new monument playing a key role in the media campaign and receiving media benefits. An Evaluation Criteria list has been formed which will be used to determine who wins the contract and constructs the new Goose Monument: • Company experience - depth of experience in creating and/or replicating other pieces • Timing - time frame estimated from project award to final placement • Insurance - minimum $5 M liability required • Cost and build - total cost

from start to finish, construction method and approach • Maintenance Requirements to protect against environmental elements in securing longest life of monument • Expected life span - of monument • References - feedback in workmanship, professionalism and project deliverables • Partnership - opportunity to partner with the municipality for mutual benefit of both.   Council held a Special Corporate Planning meeting at the Community Centre last Tuesday to give interested community members an opportunity to hear presentations by the bidders who, after their prevue welcomed a question/answer opportunity from the audience.   The above criteria was used to short list the applicants to three firms who each gave an indepth, thorough and very interesting bio of their history and ability to fabricate such a project:   Matt Fair is a Production Manager for Research Casting International based in Trenton, Ontario. Their services include specimen restoration, casting, mounting, exhibit fabrication and transportation. The firm operates out of a 45,000 sq.ft. facility capable of accommodating museum exhibit projects and commissions of any size and complexity. Their artists and craftsmen are dedicated to the restoration and preservation of the world's most valuable paleontological specimens and artifacts.   Dave Thur is General Manager of Muskoka Millwrighting and Machinery

Ltd from the Huntsville area, and the accepted practice of cookie cutter, one size fits all approach to design falls well short of their aim in achieving total customer satisfaction. Customized solutions, paired with their capabilities are designed and built to satisfy the unique project requirements for each customer.   Mike Camp of Mike Camp Designs from Haileybury, Ontario area works his magic alone with limited logistic assistance and has produced many sculpture projects and landmarks across Canada. Mike works on site and is prepared to set up a work area in our community and devote his time entirely on this project until completion.   All three contenders gave great presentations on what their intended approach would be using schematic illustrations to demonstrate their plan to refurbish our Goose. They all recognized the need to retain the existing goose shape and integrity, and all were in agreement that stainless steel or bronze would be the best material for strength, durability, longevity and to guard against erosion to provide a 50 years or more lifespan. All three agreed that the base is sound with only superficial repair being necessary. Matt had a vision of changing the base to reflect a more Canadian Shield rock motif, and Mike had a few ideas of using the discarded pieces for tourist souvenirs and suggested that perhaps a dvd and photo book of the reconstruction could be another saleable keepsake.   Council and audience questions concerning longevity of the base, structure and surface, comparison of structure material to be used, and sur-

face paint to prevent rusting were asked and answered very thoroughly by all three bidders. To the concern of repair if necessary to only one section of the goose, all presenters agreed that the construction would be modular enabling one section to be repaired separately. When asked how long the construction would take before completion, each contender gave their best estimate, barring unforseen problems, believing that between several months up to a year seemed a reasonable time frame.   To the question on everyone's mind, that of total cost of the project, CAO Chris AN

Basic Black . . . . . . . . . . . . . . . . . Pg. 6 Bird News . . . . . . . . . . . . . . . . . . Pg. 2 Business Directory . . . . . . . . . . Pg. 6 Carol Hughes, M.P. . . . . . . . . . . . Pg. 4 Classified . . . . . . . . . . . . . . . . Pgs. 9-11 Community Events . . . . . . . . . Pg. 10 Crime News . . . . . . . . . . . . . . . . . Pg. 5 Crossword . . . . . . . . . . . . . . . . . Pg. 11 Nuts ‘N Bolts . . . . . . . . . . . . . . . . Pg. 3 Pathways . . . . . . . . . . . . . . . . . . Pg. 12 Storytime . . . . . . . . . . . . . . . . . . . Pg. 8 Sudoku . . . . . . . . . . . . . . . . . . . . Pg. 9

Wray explained that the quotes received for the reconstruction ranged from $180,000 to $230,000. Mayor Rody added a welcomed announcement that Council's recent funding application to the Federal Government has been successful and Wawa will be receiving a grant under the Canada 150 Community Celebration Program in the amount of $100,000 to be used in our celebration of Canada and Ontario's 150th Birthday next year. What better way to celebrate our community than in showcasing our iconic mascot, newly refurbished and ready to stand proudly on guard once again over our unique community. Mayor Rody went on to congratulate our entire community, as the grant money together with the corporate, business and individual generous and relentless fundraising over the years will enable the budgeted costs to be easily managed.   The process for the final selection of the rebuilding award will be complete and announced in the next few weeks so that construction can be underway as soon as possible.

P

and PRINTING

Tuesdays are Teacher Appreciation Days at Algoma News & Printing at 33 Ste. Marie St!

10% off merchandise by presenting your OCT card!

We will be CLOSED at NOON on Friday, September 9th. We apologize for any inconveniencies that this may cause.

61 Mission Road Wawa, Ontario P0S 1K0 Tel: 705-856-2394 Cell: 705-856-5595 Fax: 705-856-4290 alainbouffard@missionmotors.com www.missionmotors.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
September 7th, 2016 by Algomanews - Issuu