Alief Thomas Riyadi - Architectural Portfolio 2021

Page 1

O RD I N AD I S C H AO

ALIEF RIYADI PORTFOLIO

A L I E F T H O M A S R IYA D I P O R T F O L I O al i e f . t . r i ya d i @g m a i l . co m 0419 32 8 98 4


Alief Thomas

R I Y A D I

Graduate of Architecture

CONTACT Melbourne, Victoria +61 419 328 984 alief.t.riyadi@gmail.com linkedin.com/in/atriyadi

INFOR M AT I ON Australian citizen English Indonesian

Primary Secondary

Master of Architecture

SKI LLS So f t ware A d vanced

AutoCAD | Sketchup | Lumion

Photoshop | Illustrator | InDesign

Word | Excel | Powerpoint | Outlook incl. Google equivalent

Int ermedia t e

PROF IL E - Open-minded individual capable of learning from and collaborating with peers. - Effortless integration into new environments; working and cultural. - A leader, frequently delegated leadership roles by peers and seniors. - Culturally aware, adaptable, and accepting. - Incredibly confident in my architectural quality and capabilities. - Well involved with all peers; strong professional relationships. - Strong desire to make an impact through architecture; improving the way we and the environment live cohesively. - Largely interested in architecture with large urban impact.

3

COLLINS PENNINGTON ARCHITECTS (Collins Caddaye Architects)

FEB 2017 - DEC 2019

years as an architectural assistant

- Small scale firm focusing on residential and education - Collaborated in the design of multiple projects; built + unbuilt - Mentored junior staff members w/ architectural and office standards - Involved in; Alterations & additions New Builds 3D Modelling Joinery design + doc Full construction + Technical documentation Town planning documentation - Project types; Single Dwelling Educational facilities

2

INNER PART INTERIORS

Multi-dwelling Multi-storey APR 2021 - PRESENT

months as a cost estimator

- Cost estimating internal partitions and internal fittings - Working remotely (office located in Sydney) Rhinoceros 3D | Revit

ED UCATION So ft S kil l s -

Guaranteed dependability Transparent communication Strong critical thinking skills Culturally sensitive and aware Quick adaptability in unforeseen circumstances Willingness to experiment and learn Thorough in the creative process Strong collaborative abilities Open-minded Sharp learner Sociable

M.Arch University of Canberra

2019

B.Arch University of Canberra

2016

Sketchbook Program Institute of European Design (IED)

2016

REF ERENCE S References provided upon request


E X P E R I E N C E | proje cts

COLLINS PENNINGTON ARCHITECTS MED - LARGE SCALE COMMON GROUNDS 2

Multi-unit affordable housing development w/ community facilities ACT Government project

- Feasibility studies - Conceptual design - DA documentation - 3D modelling

ESTATE FORREST

87 unit high-end residential development

- DA and BA documentation - Construction documentation includes wet area, kitchen, joinery docs - Interior design includes kitchen, bathrooms and joinery - 3D modelling

GOOD SHEPHERD CATHOLIC PARISH PRIMARY SCHOOL

Knockdown-rebuild and refurbishment of 5 blocks 20+ classrooms

- DA and BA documentation - Construction documentation includes wet area, kitchen, joinery docs - Interior design includes classroom layout and joinery - 3D modelling

ST CLARE’S COLLEGE

New communal education facility/library and refurbishment of 10+ classroom placid wing

- DA and tender documentation - Construction documentation includes wet area, kitchen, joinery docs - Interior design includes staircases and joinery - 3D modelling

MONASH MULTI-UNIT & CHILDCARE

New 20+ unit development & child-care centre

- DA and tender documentation - 3D modelling

CAMERA ST

Alteration & addition of a single-storey 3-bedroom dwelling into a two-storey 5-bedroom dwelling

- From sketch plans to final design - Complete design; architecture, kitchen, living room, bathrooms, joinery, staircase - Complete CDC, DA, BA documentation - Complete construction documentation - Coordination w/ consultants and builders

FRANKLIN-DOMINION

8 studios & 4 3-bedroom terraces

- From sketch plans to final design - Master planning - Competition styled submission - 3D modelling

POWERS RESIDENCE

Internal knockdown-rebuild into a 4-bedroom dwelling

- Interior design includes kitchen and joinery

Residential + Community Architectural Assistant AutoCAD/SketchUp

Residential Architectural Assistant AutoCAD/SketchUp

Education Architectural Assistant AutoCAD/SketchUp Education Architectural Assistant AutoCAD/SketchUp

Residential Architectural Assistant AutoCAD/SketchUp

SMALL SCALE Residential Project Architect under supervision AutoCAD/SketchUp

Residential EOI Architectural Assistant AutoCAD/SketchUp Residential Architectural Assistant AutoCAD/SketchUp


ARCHIPELAGO

NORTHBOURNE HOUSING

VERTICAL SCHOOL

Lake Burley Griffin & Northbourne Avenue/Parliament House Axis


O R G ANI SI NG CH AOS

CIRRICULUM VITAE // ACADEMIC WORK //

Vertical School Typological Archipelago: Dickson Revived! Typological/Urban Northbourne Avenue Housing Urban

COMPETITION //

Opera by the Sea

PROFESSIONAL WORK //

Camera Street, Manly Common Grounds 2 St Clare’s Learning Commons

Shortlisted

Residential Multi-residential Education

published in Home & Garden Jan ‘21

Inside contains selected works produced during my employment at Collins Pennington Architects, and graduate projects at the University of Canberra. Each project manages to exhibit a personal objective whilst meeting the expected outcomes provided in the brief. The term ordinadis chao - organising chaos - is my perception of architecture and it’s role within the world. The word chaos in itself inhibits a negative connotation and is quite jarring, but by acknowledging and understanding its existence you become far more capable of producing higher quality results of order. Life is the balance of chaos and order, light and dark, Yin and Yang; neither qualities are greater than the other, they are complementary forces that are required to exist. Everything around us has been fragmented into individual puzzle pieces, our task as architects is to identify the qualities of each piece and see the various possibilities that can come from it. It is natural for chaos to exist, and it is natural for us human beings to arrange that and make order from it all. Each semester solidified my foundations of theoretical and practical architecture, each semester allowed my curiosity to thrive. This is all present in my studio projects and essays that cover a varying but relevant topic of architecture that allowed discussion amongst my peers.


PG Studio 3

VERTICAL SCHOOL

A new typology that is currently emerging in architecture; the vertical school. This project provided opportunities to question what makes a school a school, and what can make a vertical building dynamic. Located in the CBD, the secondary education vertical school required a contextual relationship with its urban settings, publicly accessible facilities as a contribution will help enrichen and encourage the relationship with the public realm. Large focus on section reveals the potential of the architecture within; crafting and sculpting spaces from a block of stone.


Perspective section radical circulation and organisation of programs


CIRCULATORY CONCEPT

CIRCULATORY SYSTEM

Experimenting with an alternate circulatory system that causes a greater impact in providing events - Bernard Tschumi’s theory. The shift/split of the typical primary circulation distributor ‘stretches’ occupancy of a space, in this particular instance the school quad halfway through the building; an important quality of schools.

PROGRAMMATIC ORGANISATION


A

B

N

4th FLOOR

N

10th FLOOR


Section A

Public Library + Cafe

Art & Entertainment Facilities School Quad

Educational Facilities (Classrooms)

Rooftop Courtyard


Section B


PG Studio 4

DICKSON: ARCHIPELAGO REVIVED!

The Garden City dream and the many town-centres that are scattered through Canberra has withdrawn the potential of creating dense urban environments, Dickson Shops being one of them. Although located close to the CBD it is an area that is under utilised. Town-centres have not reached their full potential due to the lack of commitment to produce the facilities for these communities. What if we were to commit radically and discover the true potential of town-centres through the route of a hybrid-megaform, thus producing what we can consider an ‘archipelago’.


Abstract illustration of Dickson precinct Canberra, ACT


Initial sketch of given site. Painting the site to help identify key surrounding elements and characteristics.

Direct element is identified, how to embrace and enhance it w/ architectural elements. This highlights the path and route of the site.

Final draft; painting with regular forms and patterns, organised in a chaotic manner allows an observation of possibilities. Relationships of forms, view points, site axis’, and language of site are exposed.


Section A ‘Dining Pod’ sitting gently on the lifted ground plane. Transparency through pod maintaining the relation of the internal form as a whole. Marketplace expands the entire basement level.

Performance hall and public rooftop courtyard. Articulation of the ‘wall’ providing clear sightlines directly through the entire form. Section B


Woolley St

Cape St

A

B

Indoor Garden

Foyer

Towards Sector A

Sullivans Creek


Badhman St

Towards Sector C

Dining

Dining Amphitheatre

Bike parking

Dining

N




PG Studio 2

NORTHBOURNE AVENUE HOUSING

Successful housing projects are achieved through the success of communal and social facilities. The proposed sites were located along a vital prominent arterial road of historical significance to the conception of Canberra; currently undergoing large scale redevelopment to further densify the CBD and its surroundings. Northbourne Avenue has been neglected and lost its charm and connection to Canberra due to the jarring juxtaposition between humans and machine; focus has instead been reorientated towards the residential side of the adjacent sites or completely divided with the development of multi-storey offices with no relationship. This project was an exploration into altering a negative component of the city into an advantage, whilst solving the initial housing objective. A gateway that promotes the community values and culture of Canberra, and retuning the purpose of Northbourne Avenue back to what it originally was.


N or

tn

ec

oj pr

th


Arterial Road

Site Circulation

Hard edge has been broken and diminshed between the two sites. Hard edges continue beyond the sites along Northbourne Avenue

Circulation between site on either side of Northbourne available w/ pedestrian crossing at the southern end, and bridge at the northern end creating ownership of the space to pedestrians > to the residents of Canberra


Visual Breaks

Stage 2

Visual breaks provided with views towards the sky; lowest building height @ 3 storeys. Mass of buildings eased by elevating form a storey above ground level. Large setback of the forecourt eases the presence of a large building along Northbourne

Masterplanned to include adjoining sites


Ground Plan Scale 1:1000

N


Level 3 Scale 1:1000

N


uni.XYZ Competition

OPERA by the SEA

This project required a design of an Opera House fit for today - a cultural hub -, one that encapsulates the architectural style of the 21st Century that is iconic but can withstand the passage of time, lasting for decades to come. Designed to encapsulate the history, the culture, and the surrounding context Valge Laev - named after the mythological White Ship that brings freedom and takes people to a better land - is a cultural hub that belongs to the people of Tallinn, Estonia. It was essential that the project became a cohesive junction between the Soviet Union constructed Linnahall Arena and the Port of Tallinn resulting in a harmonious waterfront presence between all three sites.


Elevated perspective of Linnahall, Valge Laev, & Tallinn Port


Diagrams analysing and identifying relationships of environmental and architectural elements. Orange representing primary elements; either mandatory links/relationships between functions, or highlighting that the collection of programs will represent the building’s spirit in function and form.

Ship

Linnahall Quick sketches in an attempt to produce a form that is identifiable through simple lines; an icon that all can be easily remembered.

Dock

Designed based on a hybrid of a ship, Linnahall, and a dock. Ship represented by curviliniear lines, dock orthogonal linework, Linnahall by the opera house as a whole - an alien mothership upon the shores of Tallinn.

Opera House


Above: Reforming site; creating interesting vantage points upon the shoreline for dwellers and incoming visitors. Initial sketch of opera house silhouette. Attempt to create heirachy within the sectional form. Side & Below: sketching architectural elements ie; beside - courtyard pavement characteristic to be achieved, and stair/ramp layout for lower court seen in plan.


Deck/Amphitheater


N Bath House


Atrium Plaza

Main Con Hotel Atrium Plaza

Basement

Lower Court


Main Concert Hall

ncert Hall

Museum Upper

Museum Lower


PROFESSIONAL WORK

The following are projects where my involvement in the design and architectural documentation was significant; all during my employment with Collins Caddaye Architects. Designing and documentation tasks include: - Architectural - Joinery - Interior - Landscape Involvement in other projects are outlined within the CV



CAMERA ST Manly, Sydney Single-Dwelling - Alterations & Additions July 2017 - Jan 2020 Single-story 3 bedroom dwelling altered & extended into a 5 bedroom & garage; situated on a steep site requiring close coordination with engineers and builders. An important element of the house was the staircase that tied all 3 storeys, a strong sculptural element to interact with on a daily basis. Role: - Sketch design - Compliant Development documentation - Acting Project Architect

- Final architectural design - Complete construction documentation

10 page spread published in the January 2021 edition of House & Garden Magazine https://collinspennington.com.au/wp-content/uploads/Manly-House.pdf

All drawings produced for A1 print

NOTE

A

B

D

C

2250

4700

THE DEVELOPMENT WILL COMPLY WITH THE ACT ENVIRONMENT PROTECTION AUTHORITY, ENVIRONMENT PROTECTION GUIDELINES FOR CONSTRUCTION AND LAND DEVELOPMENT IN THE ACT, AUGUST 2007

E

2390

6930

LEGEND

4

EXISTING STRUCTURE

A21

F

E

A24

A24

NEW STRUCTURE

14 CAMERA STREET, MANLY

D

G

C

A23

A25

A23

EXISTING ADJACENT SINGLE STOREY RESIDENCE

8

28.0

1

W-G

0° 11' 0" 33.045

DP

08

915

1

1

07

1510

W-G

09

922

29.0

927

W-G

924

600

1755

1610

EGL 28.215

782

TEL

W-G

DP

06

1 SKYLIGHT

1870

SC

3760

WIR

A33

ENS

J.05

CPT

3

CT1

LIVING

DINING

TIM1

TIM1

J.04

1960

ENTRY

TIM1

UP 1

01

3 A31

3

2

F-G 04

3

3000

26.0

WIR

2

HR

BATH

BED 2

J.07

CPT

16

SC

15

LC

13

4

12

7

4 A42

J.02

9

SC J.02

FW DP

1199

EGL 28.905

W-G

W-G

W-G

W-G

03

04

10

11

Door F-G:06 update; hinged timber door, NOT sliding timber door

8

4

DP

1

0° 11' 00" 26.52

947

2

4

PLASTERBOARD / 90mm STUD /ACOUSTIC INSULATION /PLASTERBOARD / WALL TILES TO WET AREAS

UPDATES:

F-G 05

TIM1 HR

TIM1

A31

PLASTERBOARD / 90mm STUD / PLASTERBOARD WALL TILES TO WET AREAS

KITCHEN

STAIRS

2° 54' 6.25

FC SHEET / 15mm PLY / MEMBRANE / FURRING CHANNEL / 90mm STUD / PLASTERBOARD

3

SC

UP 10

8

CPT 02

3

J.01

14

3

5 6

CT1

3

W-G

4

METAL CLADDING / MEMBRANE / 15mm PLY / 30mm FURRING CHANNEL / 90mm STUD / PLASTERBOARD WALL TILES TO WET AREAS

3a

EGL 30.00

3

F-G 03

W-G

1 - 110mm BRICK / 50mm CAVITY / 110mm BRICK VENEER RENDER BOTH SIDES

05

HALLWAY

CT2

TIM2

2

W-G

30.0

3

F-G 01

ST

SC SK SPF SS1 SS1 ST TD TIM1 TIM 2

2a

J.03

1130

1310

RL 29.80

FFL 30.00

SC

3

ALUMINIUM FRAMED GLAZING ALUMINIUM GLAZED DOOR ALUMINIUM FRAMED SLIDING DOOR ALUMINIUM FRAMED AWNING WINDOW BAGGED BRICK BALUSTRADE 1 (INTERIOR) CARPET FLOOR FINISH TILE TYPE 1 TILE TYPE 2 DOWN PIPE FLOOR WASTE HAND RAIL JOINERY UNIT TYPE - REFER TO JOINERY DRAWINGS FOR DETAILS OVERFLOW BOX GUTTER PARAPET CAPPING ROOF SHEETING TYPE (x) ROOF TYPE 1 (TILE TO MATCH EXISTING) ROOF SPREADER STRUCTURAL BEAM - REFER TO STRUCTURAL STRUCTURAL COLUMN - REFER TO STRUCTURAL SKYLIGHT CUSTOM STEEL PLATE FRAME HEKA HOODS® SYSTEM 900mm HEKA HOODS® SYSTEM 450mm STONE THRESHOLD (EXISTING) TIMBER DOOR TIMBER TYPE 1 TIMBER TYPE 2

2

990

F-G 02

3

2

900

J.05

AG AGD ASD AW BB BAL1 CPT CT1 CT2 DP FW HR JU.0(x)

1

F-G 06

900

CPT

90° 59' 00" 10.325

269° 20' 00" 10.035

7

BED 1

EXISTING BAGGED BRICK EXISTING BRICK WALL EXISTING CEMENT RENDER EXISTING GUTTER EXISTING ROOF TILES EXISTING STONE BASE EXISTING WINDOW

OBG PC RS(x) RT1 RSP SB

EGL 29.865

FW

3

EX BB EX BW EX CR EX G EX RT EX SB EX W

EGL 29.86 8

05/10/2018

7

26/09/2018

6 5 issue

UPDATES UPDATES

21/08/2018

UPDATES

07/08/2018

UPDATES

date

amendments

10 CAMERA STREET, MANLY EXISTING ADJACENT SINGLE STOREY RESIDENCE

F

E

D

G

C

A24

A24

A23

A25

A23

CVETANOVSKI RESIDENCE 12 CAMERA STREET. MANLY (LOT 1) RESIDENTIAL

3

project:

A21

GROUND FLOOR drawing title:

A

B

C

D

E

scale: 1:50 @ A1/1:100 @ A3

drawing no:

A11

issue no:

8 ãcopyright

Contractors must verify all dimensions on site before commencing any work or preparing shop drawings.



E

C

D

B

A

Y

X

9 8 7 6 5 4 3 2 1

BAL2 TILED TERRACE, STRUCTURE TO ENGINEER'S SPEC.

1000

FCL 29.60 FFL 28.80 2550

CELLAR

WALL BEYOND

3428

MUD/STORAGE

2470

LAUNDRY

FCL 28.47

330

8 7 6 5 4 3 2 1

800

BW

0.5% FALL ON STRUCTURAL SLAB

9

330

WB1 BEYOND

NGL

400

DW

400

FFL 30.00 BAL1

150 x 75 LVL

FFL 27.05 1050

GARAGE 0.5% FALL ON BASEMENT SLAB

450mm STEP

GARAGE FFL 26.00

100

STEP BEYOND

1420

WB1 BEYOND

3400

SITE BOUNDARY

FFL 33.40

STREET 25.90

SECTION A 1:50

1D

3

2

C

RL 37.378

850

BEYOND

2550

GARAGE

ENVEL

AW

JU.02

EX RT

BAL2 JU.01

DINING

KITCHEN

MC2

SECTION B

LAUNDRY

t

1000

BW

0.5% FALL ON STRUCTURAL SLAB

MC1

BB SECTION C

---

EX BB

existing stone stairs

MUD/STORAGE

1:50

CELLAR

WALL BEYOND

EGL

GARAGE 0.5% FALL ON BASEMENT SLAB

450mm STEP

SOUTH FACADE

1 ---

1:50

SECTION A

---

1:50

4

2

3

4

AG

PARAPET 36.75

AG

2048

ND

YO

BE

954

BB

RWH/ DP

EX BB

BB

AG

ASD

400

FFL 33.40

BUIL EGL

GARAGE FFL 26.00 1:50

EXISTING FOOTINGS TO BE CONFIRMED

STREET 25.90

t 1:50

JU.01

DINING

FFL 30.00

0.5% FALL ON BASEMENT SLAB NORTH FACADE 2

---

925

AGD JU.02

DING

3000

2500

GARAGE

SECTION B

AG

ENVE

FFL 30.00

---

ASD

ASD LOPE

400

FCL 28.80 FCL 28.50

L

RS3

SB

300

BW

0.5% FALL ON STRUCTURAL SLAB

E

FCL 33.00

ER

BED 4

BED 3

RS3

RL

600

FCL 29.40

914

RWH/ DP

ASD

943

FFL 30.00

BAL1

PC

EX BB

AWNING AGD

2040

RS3

PC

FCL 35.95

SECTION C 1:50

JU.02

KITCHEN

3130

AG

850

SITE BOUNDARY

3930

AG AG

BEYOND

AG

AG

9m Building height restriction

RWH/ DP

top of gutter

SS1

SITE BOUNDARY

MC1

MC1

RWH/ DP

SITE BOUNDARY

SITE BOUNDARY

PARAPET 33.93

2

2

PC

PARAPET 36.75

AG

---

1

1

RS2

2850

628

3

X

RL 37.378

SITE BOUNDARY

Y

2550

1

TILED TERRACE, STRUCTURE TO ENGINEER'S SPEC.

BAL1

ST

8 7 6 5 4 3 2 1

340

JU.02

EXISTING FOOTINGS TO BE CONFIRMED

9

SITE BOUNDARY

OPE

TOW (ADDITION) 32.98

WB1 BEYOND

EX SB 1:50

AGD

330

NGL

AG

2470

EXIST. FFL 30.00

EX BW

DW

STREET 25.90

ASD

MC2

EGL

GARAGE FFL 26.00

150 x 75 LVL

PC

EX G

ASD

MC1

FFL 30.00

0.5% FALL ON BASEMENT SLAB

2

TG

TGD

EX W

925

TOW 33.32

400

2500

STEP BEYOND

EX G EX W

L

RS3

FOLDED METAL SB FLASHING STEP

DING

8 7 6 5 4 3 2 1

RS1

BUIL

9 W EX

FC

2980

400

EX W

FCL 33.00

ER

BED 4

BED 3

RS3

L

ER

3000

600 300

400

EX RT

EX G

X

2040

3130

SITE BOUNDARY

943

FFL 33.40

WB1 BEYOND

---

RS3

EX RT

Exist. Fascia

5010

FCL 28.80 FCL 28.50

Y

SPF

FCL 35.95

FCL 29.40

BW

4

A

AW 2048

FFL 30.00

0.5% FALL ON STRUCTURAL SLAB

MC1

PARAPET 36.75

MC1

BAL1

4

B

9m Building height restriction

BEYOND

EXIST. RL 35.01

SITE BOUNDARY

2464

MC1

3

top of gutter

E

2

SITE BOUNDARY

1

X

SITE BOUNDARY

Y

SITE BOUNDARY

1 ---


600

GPO

SB-1

GPO

GPO

810

HT1 BT-1 PA-2

DR PA-2

DR PA-2

DR

PA-2

DR PA-2

DR PA-2

DR

PA-2

DR PA-2

DR PA-2

DR

OV

PN

BT-1

PN

AS

PN

AS

PA-2 KB

3600 6 EQUAL

460

B1 BASIN 1 B2 BASIN 2 BIN GARBAGE BIN - PULL OUT BT-1 BENCH TOP TYPE 1 - MAXIMUM TILE 'TAXOS' BT-2 BENCH TOP TYPE 2 - CAESAR STONE 'RAVEN' CD CLOTHES DRYER CT COOK TOP DW DISHWASHER - FULLY INTEGRATED FP FIREPLACE FR REFRIGERATOR - FULLY INTEGRATED FS FIXED SHELF GPO-AB GENERAL POWER OUTLET (ABOVE BENCH) GPO-BB GENERAL POWERACCORDINGLY: OUTLET (BELOW BENCH) CARCASS FINISH TO MATCH HT1 TYPE 1 - BLACK INDEX CO 'J PULLS XL' PA-1 FINISH, HANDLE MATCHED WITH MELAMINE CARCASS. MATTE POWDER COAT ‘BLACK ETCH' PA-2 FINISH, (900JPXL06) MATCHED WITH WHITE MELAMINE CARCASS. HT2 HANDLE TYPE 1 - INDEX CO 'J PULLS XL' MATTE POWDER COAT 'BLACK DIMENSIONS (600JPXL06) ARE TO STRUCTURE AND JOINERY AND ETCH' HT3 HANDLE TYPE 1 INDEX CO 'J PULLS XL' EXCLUDE WALL LININGS & FINISHES UNLESS NOTED OTHERWISE. (300JPXL06) MATTE POWDER COAT 'BLACK ETCH' HR HANGER RAIL KB KICK BOARD BLACK FINISH ON SITE PRIOR TO ALL MEASUREMENTS TO -BE CONFIRMED LC PRODUCTION.LAUNDRY CHUTE MIX1 MIXER TYPE 1 - KITCHEN MIX2 MIXER TYPE 2 LAUNDRY SHARK-NOSE HANDLES FOR ALL PULL DRAWERS AND OS CABINETS. OPEN SHELF OV OVEN PA-1 PANEL TYPE 1 - EVENEER 'RAVEENA' 0% GLOSS PA-2 PANEL TYPE 2 - 2 PAC WHITE TYPE 1 TO MATCH BT-3 PA-3 PANEL TYPE 3 - 2 PAC DULUX 'ARMADA' PA-4 PANEL TYPE 4 - 2 PAC WHITE TYPE 2 AS ADJUSTABLE PA-5 PANEL TYPE 5SHELF - 6mm STEEL SHEET W/ BLACK B1 BASIN FINISH 1 B2 BASIN PN HAFELE2 'ARENA' PULL OUT PANTRY BIN GARBAGE BIN - PULL OUT RH RANGE HOOD BT-1 BENCH TYPE 1 - MAXIMUM TILE 'TAXOS' RS ROUTEDTOP SLOT FCL BT-2 BENCH TYPE 2 -33.00 CAESAR STONE 'RAVEN' SB-1 SPLASHTOP BACK - MAXIMUM TILE 'PEPPER' CD CLOTHESSINK DRYER SI1 KITCHEN TYPE 1 CT COOK TOP MACHINE WM WASHING DW DISHWASHER WT WALL TILE - FULLY INTEGRATED FP FIREPLACE ZIP ZIP TAP FR REFRIGERATOR - FULLY INTEGRATED FS FIXED SHELF NOTES: GPO-AB GENERAL POWER OUTLET (ABOVE BENCH) GPO-BB GENERAL POWER OUTLET (BELOW BENCH) HT1 HANDLE TYPE 1 - INDEX CO 'J PULLS XL' 1. IF CLEARANCE FROM PULL-OUT PANTRY (900JPXL06) MATTE POWDER COATSYSTEM ‘BLACK ETCH' AVAILABLE, PLACE VERTICAL FACEXL' OF PANTRY. HT2 HANDLE TYPEGPO 1 - INDEX CO 'JONPULLS IF NOT(600JPXL06) POSSIBLE, PLACE ON SPLASHBACK MATTEGPO POWDER COAT 'BLACK ETCH' HT3 HANDLE TYPE 1 - INDEX CO 'J PULLS XL' (300JPXL06) MATTE POWDER COAT 'BLACK ETCH' HR HANGER RAIL KB KICK BOARD - BLACK FINISH LC LAUNDRY CHUTE TOP OF BENCH UPDATES/AMENDMENTS: MIX1 MIXER TYPE 1 - KITCHEN MIX2 MIXER TYPE 2 30.90 - LAUNDRY · OS NOTE UPDATE CARCASS FINISHES OPEN REGARDING SHELF OV OVEN PA-1 PANEL TYPE 1 - EVENEER 'RAVEENA' 0% GLOSS 20mm PA-2 PANEL TYPE 2 - 2 PAC WHITE TYPE 1 TO MATCH BT-3 PA-3 PANEL TYPE 3 - 2 PAC DULUX 'ARMADA' PA-4 PANEL TYPE 4 - 2 PAC WHITE TYPE 2 PA-5 PANEL TYPE 5FFL - 6mm30.00 STEEL SHEET W/ BLACK FINISH PN HAFELE 'ARENA' PULL OUT PANTRY RH RANGE HOOD RS ROUTED SLOT SB-1 SPLASH BACK - MAXIMUM TILE 'PEPPER' SI1 KITCHEN SINK TYPE 1 WM WASHING MACHINE WT WALL TILE ZIP ZIP TAP

GPO

HT1 HT1

PA-2 OV

PA-3 (SPLASH BACK)

LED LIGHT PN

PA-2

KB

90

FFL 30.00

GPO

CT

1100

1000

680

NOTE:

A ELEVATION 2 - J.02

A41

-

1:50

1

1100

600

FR

GPO

AS RH

SB-1

GPO

810

PA-2

DR PA-2

DR PA-2

DR

PA-2

DR PA-2

DR PA-2

DR

PA-2

DR PA-2

DR PA-2

DR

2460

GPO

BINCT

PN

PN

PN

ZIP SI1 GPO PN

OV

PN

AS

J.01

AS PA-3 AS PA-3 PA-3 (CARCASS)

FS PA-3

PA-3 (SPLASH BACK)

PN

BT-1

HT1 HT1

PA-2 OV

AS PA-3

RECESSED LED LIGHT

MIX1

GPO

DW

PN

AS

PA-2

4

KB

3600 6 EQUAL

460

3 1100

1000

680

ELEVATION 2 - J.02 APPLIANCE

-

CUPBOARD

POCKET 1:50 DOORS

2100

2

2

OV x2 Under benchtop

BROOM

overhead cupboards

PULL OUT PANTRY

J.03

J.02

AS

680

40

40mm CAVITY

1000

3600

460

600

RECESSED LED LIGHT GPO SB-1

1100

900

1200

AS

PA-2

FS PA-2 PN

PA-2

280

A/C

AS

KB

90

FFL 30.00

1:50

AS

PA-1 AS

1200

40 DR

700

AS

PA-1

3090

LCAS

PA-1

HT1 BT-1

800 EQUAL 3

DR

PA-1 AS

AS

BT-1 DR

PA-1 AS

AS

600

RECESSED LED LIGHT GPO SB-1

PA-1 AS

620

40mm CAVITY

AS

1190

20 280 1200

AS

1050

PA-2

1200

PA-2

APPLIANCE CUPBOARD/PA-3

AS

4000 300

A/C GRILLE TO MATCH PA-2

FCL 33.00

580

280

A/C

700

2

BT-1

800 EQUAL 3

DR DR

A

DR

A41

700

-

KITCHEN

-

J.01, J.02

ELEVATION 1 - J.01

1

1:50

1.

PA-3 CARCASS

FCL 33.00

-

NOTES:

1:50

12mm SHADOW 20m

IF CLEARANCE FROM PULL-OUT PANTRY SYSTEM AVAILABLE, PLACE GPO VERTICAL ON FACE OF PANTRY. IF NOT POSSIBLE, PLACE GPO ON SPLASHBACK

FCL 33.00

PA-2 PA-2

PA-2

PA-2

PB

UPDATES/AMENDMENTS:

FCL 33.00

20mm KB

GPO PA-2 AS

APPLIANCE CUPBOARD W/ DIFFERENT 1:50CARCASS FINISH

AS AS

4000

600

-

DR PA-2

DR

PA-2

DR PA-2

DR PA-2

DR

OV

OV

AS

PA-2

3600 6 EQUAL

GPO

FFL 30.00

1:50

KB

BT-1

PA-2

AS

PA-2

1900

RECESSED LED LIGHT GPO SB-1

BIN

DR DR

1:50

ELEVATION 4 - J.01

-

1:50

570

PA-2

DR PA-2

PA-2

DR PA-2

PA-2

DR PA-2

460

-

12/02/2019

UPDATE

06/02/2019

UPDATE

scale:

1:50 @ A1AMENDMENTissue no: 11 14/01/2019

issue

date

9

drawing no:

A41

amendments ãcopyright

Contractors must verify all dimensions on site before commencing any work or preparing shop drawings.

A/C

AS

40mm CAVITY

40

FFL 30.00

12 CAMERA STREET. MANLY (LOT 1) RESIDENTIAL project:

DR

GPO-AB

CVETANOVSKI RESIDENCE

600

RECESSED LED LIGHT GPO SB-1

12mm BT-1 / 20mm SHADOW LINE / 20mm PA-2

20mm KB

600

570

JOINERY 1 ELEVATION 2 - J.02 2

BT-1

GPO-AB

GPO

JOINERY 1 800 EQUAL 3

2460

AS

20 280

600

10

BT-1

DW

AS

HT1 20mm BT-1 KB

11

FCL 33.00

DR

drawing title:

DR

scale:

1:50 @ A1

700 drawing no:

A41

issue no:

11 ãcopyright

Contractors must verify all dimensions on site before commencing any work or preparing shop drawings.

B

KITCHEN CONCEPT IMAGE 1

-

OPEN SHELF W/ DIFFERENT CARCASS FINISH

GPO ON UNDERSIDE OF OVERHEAD + GPO-AB VERTICAL ON PANTRY (NOTE 1)

IMAGE 2 ON UNDERSIDE OF C GPO @ 1600mm GPO ONCONCEPT UNDERSIDE SECTION A KITCHEN AGPO APPLIANCE W/ DIFFERENT CARCASS FINISH OVERHEAD W/ CT KILL FROM FFL OFCUPBOARD OVERHEAD -

GPO-BB FOR OV x2 GPO-BB FOR CT

-

1:50

AS BT-1

AS

DW

drawing title:

1

PA-2

AS

project:

3000

GPO FOR FR x2

AS AS

PA-2

AS

4000

AMENDMENT amendments

PA-1 AS

280

-

date

12 CAMERA STREET. MANLY (LOT 1) RESIDENTIAL

1:50

GPO IN OS GPO FOR DW

GPOA IN OSSECTION A

issue

UPDATE

PA-1 AS

FFL 30.00 KB CVETANOVSKI RESIDENCE

700

570

14/01/2019

940

DR

FFL 30.00

06/02/2019

9

Zip unit clearance

BT-1

12mm BT-1 / 20mm SHADOW LINE / 20mm PA-2

MIX1

680

470

4

40mm CAVITY

GPO

UPDATE

PA-2

1100

1000

10

4000

PA-3 (SPLASH BACK)

ZIP

PN

850

KB

PN HT1 HT1

PN

PA-3 (CARCASS) 11 12/02/2019

1200

3000

DR PA-2

PN

AS PA-3 FS PA-3

600

GPO

PA-2

30

810

PA-2

BT-12 - J.02 ELEVATION

2

OS

DR

PA-2

AS PA-3

RECESSED LED LIGHT

GPO CT

DR PA-2

PN

PA-2 AS

220

KITCHEN CONCEPT IMAGE 2

20mm KB

SB-1

GPO

DR PA-2

PN

PN

620

940

PA-3

A/C

BT-1

-

GPO

PA-2

FS PA-2 PN

810

PA-2

FCL 33.00

AS PA-3

90

PA-2

1200

580

Zip unit clearance

AS

AS

460

ZIP

PA-3

ELEVATION 1 - J.01

1

PA-2 DW

AS

600

FREEZER

MIX1

PA-2

AS

900

FREEZER

MIX1

3000

-

AS

PA-2

1200

900

C

FFL 30.00

1900

4000

KB 12mm BT-1 / 320 LINE / 940 20mm SHADOW 20mm PA-2

P50 SHADOW LINE

PA-2 AS

90

OS

1:50

-

AS

HT1 BT-1

ELEVATION 3 - J.03

3

AS

AS

PA-1

280

220

ZIP

FRIDGE BT-1 FRIDGE HT1 GPOHT1

FFL 30.00

4000

AS

PA-1

RH

1200

TOP OF BENCH 30.90 ELEVATION 1 - J.01 1 FFL 30.00 -

AS

AS

PA-1

40

AS

PA-1

600

2100 2980

900

MIX1 PA-3

HT3 PA-2 HT3 PA-3 HT1 GPO-AB GPO GPO-AB PA-2 AS AS 20mm KB HT2 HT2

FFL 30.00

AS

PA-1

AS

PA-2

NOTE UPDATE REGARDING CARCASS FINISHES

PA-2 PA-1

AS

FS

AS

12mm BT-1 / 20mm SHADOW LINE / 20mm PA-2

PA-2

800 EQUAL 3

2100

GPO

AS

TOP OF BENCH 30.90

1200

APPLIANCE AS CUPBOARD

·

20

AS

AS

300

A/C GRILLE TO MATCH PA-2

APPLIANCE CUPBOARD/PA-3

FCL 33.00

FCL 33.00

APPLIANCE CUPBOARD W/ DIFFERENT CARCASS FINISH

-

20 280

KITCHEN CONCEPT IMAGE AS 2

C

FCL 33.00


64

4

3

2

3

4

64

2

270

64

NOT FOR CONSTRUCTION

115

TIMBER FLOOR - Tongue n Groove;

NOTE

90

THE DEVELOPMENT WILL COMPLY WITH THE ACT ENVIRONMENT PROTECTION AUTHORITY, ENVIRONMENT PROTECTION GUIDELINES FOR CONSTRUCTION AND LAND DEVELOPMENT IN THE ACT, AUGUST 2007

1 A63

1

STAIR DETAIL 1

2

STAIR DETAIL 2

3

STAIR DETAIL 3

4

STAIR DETAIL 4

5 A63

-

400

TH EN EN CO TH

200PFC (REFER TO STRUCTURAL DRAWING) P50 SHADOW LINE

-

FFL 33.40

NO

16mm STEEL PLATE

106

400

240 LVL

FCL 33.00 200 PFC

-

2 A63

-

1611

200 PFC

3 A63

250 250 250 250

270

150 LVL

150 LVL

20

20

20

400

FFL 30.00

20

40x200x10mm FINS 40x200x10mm FINS WELDED TO PFCWELDED TO ALLOW TO PFC TO ALLOW FIXING POINT FOR FIXING RIBBON POINT FOR RIBBON BATTEN POLYURETHANE SEAL BALUSTRADE BALUSTRADE 4 10mm PLYWOOD

FCL 29.60 200 PFC

TIMBER FLOOR - Tongue n Groove;

4

200mm JOISTS BEYOND 200mm JOISTS BEYOND (refer to structural (refer drawings) to structural drawings)

200PFC

BLOCKING

200PFC -

200PFC

-

TIMBER FLOOR -TIMBER TongueFLOOR n - Tongue n Groove; Groove; 1000

200 PFC

150 LVL

20mm STRUCTURAL 20mmSHEET STRUCTURAL SHEET

200PFC 260

16mm STEEL PLATE

1075

270

200PFC 200 PFC

BAL2

BLOCKING

150 LVL 200 PFC 150 LVL

150 LVL

260

200 PFC

150 LVL

200PFC

270 200PFC

64

260 260

1300 TIMBER STAIR FRAMING BY BUILDER

260

270

1

07/09/2018

issue

TIMBER FLOOR - Tongue n Groove;

date

For Costing

260

amendments

BATTEN

20mm structural sheet

SL 26.85

200PFC

200PFC

POLYURETHANE SEAL SEAL BATTEN POLYURETHANE

64

P50 SHADOWLINE

10mm PLYWOOD10mm PLYWOOD 150 LVL

ELEVATION/SECTION 1

STAIR DETAIL 5 5ELEVATION/SECTION 2 4TIMBER FLOOR -

-TIMBER TongueFLOOR n - Tongue n Groove; CVETANOVSKI RESIDENCE Groove;

-

-

12 CAMERA STREET. MANLY (LOT 1) RESIDENTIAL

200PFC

project:

260 STAIR DETAILS - DETAILS 1 drawing title: issue no: 1

64

scale: 1:5 @ A1/ 1:10 @ A3

drawing no:

A64

copyright

120

Contractors must verify all dimensions on site before commencing any work or preparing shop drawings.

260

64

FINS WELDED TOFINS PFCWELDED TO ALLOW TO PFC TO ALLOW FIXING POINT FOR FIXING RIBBON POINT FOR RIBBON BALUSTRADE (refer BALUSTRADE to structural (refer detail) to structural detail)

120

1475

FINS WELDED TO PFC TO BLOCKING ALLOW FIXING POINT FOR RIBBON BALUSTRADE (refer to structural detail)

FFL 27.05 20

12PL STRINGER FIXED TO STUD WALL

260

TIMBER FLOOR -TIMBER TongueFLOOR n - Tongue n Groove; Groove;

Tongue n Groove; Engineered stair nosing 260 (to match TIMBER FLOOR) 358

64

7 A63

POLYURETHANEPOLYURETHANE SEAL SEAL

A63

260

LAND. FFL 28.525

3

3

270 6mm FLANGE FLUSH w/ FFL

POLYURETHANE SEAL 250 200PFC

TIMBER FLOOR - Tongue n Groove;

2

TIMBER HANDRAIL

20mm STRUCTURAL SHEET

LAND. FFL 31.61

-

12PL TO STUD WALL

TIMBER FLOOR - Tongue n Groove;

40x200x10mm FINS WELDED TO PFC TO ALLOW FIXING POINT FOR RIBBON BALUSTRADE

1

6 A63

-

1789

200mm JOISTS BEYOND (refer to structural drawings)

Tongue n Groove;Tongue Engineered stair Engineered nosing n Groove; stair nosing (to match TIMBER (toFLOOR) match TIMBER FLOOR)

NOT FOR CONSTRUCTION

150 LVL

TIMBER FLOOR - Tongu Groove;

20mm STRUCTURAL S

1 issue

BLOCKING

da

200PFC

20mm structural20mm sheet structural sheet

THE DEVELOPMENT WILL COMPLY WITH THE ACT ENVIRONMENT PROTECTION AUTHORITY, ENVIRONMENT PROTECTION GUIDELINES FOR CONSTRUCTION AND LAND DEVELOPMENT IN THE ACT, AUGUST 2007

Tongue n Groove; Engineered stair nosing (to match TIMBER FLOOR)

TIMBER FLOOR - Tongue n Groove;

TIMBER FLOOR -TIMBER TongueFLOOR n Groove; - Tongue n Groove; NOTE

225 x 12mm PLATE TREAD SUPPORT WELD FIXED TO STRINGER & PLATE BALUSTRADE - WRAPPED IN TIMBER FLOOR BOARDS WITH 6mm PACKING ZONE & ISOLATION WRAP

7

STAIR DETAIL 7

-

150 LVL

150 LVL

CVETA

200PFC

200PFC

12 CAM RESIDEN project:

1

STAIR DETAIL 1

-

STAI

drawing tit

2

STAIR DETAIL 2

3

STAIR DETAIL 3

4

STAIR DETAIL 4

-

-

-

scale: 1:5

drawing no

Contractors m shop drawing


NOT F

NOTE

THE DEVELOP ENVIRONMENT ENVIRONMENT CONSTRUCTIO THE ACT, AUG

1

STAIR

2

STAIR

3

STAIR

4

STAIR

-

-

-

200mm JOISTS BEYOND (refer to structural drawings)

TIMBER FLOOR - Tongue n Groove;

NOTE

TIMBER FLOOR - Tongue n Groove;

40x200x10mm FINS WELDED TO PFC TO ALLOW FIXING POINT FOR RIBBON BALUSTRADE

NOT FOR CONSTRUCTION

-

20mm STRUCTURAL SHEET POLYURETHANE SEAL

200PFC 200 PFC

THE DEVELOPMENT WILL COMPLY WITH THE ACT ENVIRONMENT PROTECTION AUTHORITY, ENVIRONMENT PROTECTION GUIDELINES FOR CONSTRUCTION AND LAND DEVELOPMENT IN THE ACT, AUGUST 2007

150 LVL

BLOCKING

NOT F

270

64

BATTEN

POLYURETHANE SEAL

NOTE

10mm PLYWOOD

1

STAIR DETAIL 1

2

STAIR DETAIL 2

3

STAIR DETAIL 3

4

STAIR DETAIL 4

THE DEVELO ENVIRONMEN ENVIRONMEN CONSTRUCT THE ACT, AU

TIMBER FLOOR - Tongue n Groove;

-

-

FINS WELDED TO PFC TO ALLOW FIXING POINT FOR RIBBON BALUSTRADE (refer to OF structural LINE 150mmdetail) x 10mmPLATE

-

270

270

115

64

115

64

15

0

-

STRINGER FIXED TO WALL Tongue n Groove; Engineered stair nosing FRAMING (to match TIMBER FLOOR) 225 x 12mm PLATE TREAD SUPPORT WELDTIMBER FIXED FLOOR TO STRINGER & nPLATE - Tongue Groove; BALUSTRADE - WRAPPED IN TIMBER 20mm structural sheet FLOOR BOARDS WITH 6mm PACKING ZONE & ISOLATION WRAP

TIMBER FLOOR - Tongue n Groove;

1 issue

07/09/2018 date

20mm STRUCTURAL SHEET POLYURETHANE SEAL

150 LVL

CVETANOVSKI

12 CAMERA STREE RESIDENTIAL

200PFC

TIMBER FLOOR - Tongue n Groove;

150 LVL

project:

STAIR DETA

BLOCKING

drawing title:

scale: 1:5 @ A1/ 1:10 @

drawing no:

BATTEN 200PFC

POLYURETHANE SEAL

10mm PLYWOOD TIMBER FLOOR - Tongue n Groove;

6 -

STAIR DETAIL 6

A64

Contractors must verify all dime shop drawings.


COMMON GROUNDS 2 Dickson, Canberra Multi-Residential Late 2019 - Present Involvement: Feasibility > Development Application Team collaboration of a Multi-residential project part of the affordable housing program initiated by the ACT Government. Extensive design solutions were studied. Client was not sure what they were after so various options were developed to pinpoint the eventual desire of the client. Eventually wanted a balanced mix of units that provided communal and community facilities. A masterplan by an alternate consultant was provided; this project was at the tail-end of a masterplan to connect to the existing Dickson commercial precinct. Designed to integrate within the existing community by providing ground level community zones that are activated by shop-fronts/cafes along a primary pedestrian path. Residents across the Sullivan’s Creek had concerns of visual obstruction from their properties, and reduction of direct sunlight, but the site location and decision to limit building height waived their concerns. Role: - Feasibility studies - Documentation for community feedback

- 3D modeling - Architectural documentation

PUBLISHED ON THE GOVERNMENT COMMUNITY WEBSITE https://yoursayconversations.act.gov.au/common-ground-dickson

blOCk 22

paRklaNDs hOtel aND apaRtMeNts

blOCk 22

blOCk 22

blOCk 25

plaYiNG fielDs

blOCk 25

blOCk 25

paRklaNDs hOtel aND apaRtMeNts

pROpOseD ROaD 2

1.

blOCk fOOtpRiNt aND CONtext

1.

blOCk fOOtpRiNt aND CONtext

blOCk 25

1. Block Footprint & Context - blOCk 25 is lOCateD tO the sOUth east Of seCtiON 72. - Block 27 on south-east corner sUllivaN’s CReek of Section 72

blOCk 25

2.

pRevailiNG wiNDs

2.

pRevailiNG wiNDs

blOCk 25

blOCk 25

RetaiN existiNG tRees tO sOUth aND pROMiNaNt tRee ON blOCk 25

3.

5.

- tRees tO sOUth Of blOCk 25 tO be RetaiNeD - pROMiNaNt tRee ON blOCk 25 tO be RetaiNeD

3.

RetaiN existiNG tRees tO sOUth aND pROMiNaNt tRee ON blOCk 25

ROaD NetwORks

blOCk 25

CONNeCtiON tO DiCksON CeNtRe

sUllivaN’s CReek blOCk 25

blOCk 25

6.

peDestRiaN / CYCle MOveMeNt

sUllivaN’s CReek

GReeN liNk aCtivatiON aND iNteGRatiON - OppORtUNitY tO bReak OUt iNtO GReeN liNk tO MaxiMise aCtivatiON.

- existiNG CYCle / walkiNG path alONG sUllivaN’s CReek, CONNeCtiNG DiCksON CeNtRe CONNeCtiON tO DiCksON CeNtRe tO the sUbURbs.

3 CCA

site aN alYsis

HAWDON PLACE - BLOCK 25, SECTION 72 DICKSON

4.

ROaD NetwORks

- twO New pROpOseD ROaDs tO the NORth aND sOUth Of blOCk 25, CONNeCtiNG hawDON plaCe tO ROseveaR plaCe.

blOCk 25

C O MMON G ROU N D 2 4. Retaining existing - tRees tO sOUth Of blOCk 25 tO be RetaiNeD trees - pROMiNaNt tRee ON blOCk 25 tO be RetaiNeD - Trees to south of block, and C Oprominent MMON G ROU N Don2 block to be tree HAWDON PLACE - BLOCK 25, SECTION 72 DICKSON retained

pROpOseD ROaD 2

3. Road Networks - twO New pROpOseD ROaDs tO the NORth aND sOUth Of blOCk 25, CONNeCtiNG hawDON plaCe tO ROseveaR plaCe. - Two new proposed roads on north and south side of site. Provides connecting Hawdon Place to Rosevear Place

- pRevailiNG wiNDs fROM the NORth west

- blOCk 25 is lOCateD tO the sOUth east Of seCtiON 72.

4.

blOCk 25

2. Prevailing Winds - pRevailiNG wiNDs fROM the NORth west - Prevailing winds from the north-west CONNeCtiON fROM aNtill stReet tO sUllivaNs CONNeCtiON CReek fROM aNtill stReet tO sUllivaNs CReek

blOCk 22

DiCksON plaYiNG fielDs

hawDON plaCe

pROpOseD ROaD 1

pRevailiNG wiNDs sUllivaN’s CReek

hawDON plaCe

pROpOseD ROaD 1

pRevailiNG wiNDs DiCksON

collins caddaye architects

5.

peDestRiaN / CYCle MOveMeNt

6.

GReeN liNk aCtivatiON aND iNteGRatiON

2. Pedestrian 3. Green Link Activation and Integration - OppORtUNitY tO bReak OUt iNtO GReeN liNk tO MaxiMise aCtivatiON. - existiNG CYCle / walkiNG& path Cycle alONG sUllivaN’s Movement CReek, CONNeCtiNG DiCksON CeNtRe tO the sUbURbs. - Existing cycle & walking path - Opportunity to break out into green to have connection provided site aN alYsis link to maximise activation

3 CCA

collins caddaye architects


Option 1 Single 1 bed unit type (exploring the maximum density of the project), communal/commercial spaces all on ground level. Configuration primarily to capitalise ground level green space on the north-west corner of the site - will lead to better community ownership and activation.

DOWNER DOWNER

NORTHBOU

NORTHBOU

RNE AVEN UE

RNE AVEN UE

SOUTHWELL SOUTHWELL PARKS PARKS

ANTILL STREET ANTILL STR

DICKSON DICKSON BUS BUS INTERCHANGE INTERCHANGE

UE

EET

PER

COW

EMMAUS CHR

DICKSONDICKSON EMM WETLANDS WETLANDSSCHOOL

DICKSON DICKSON

DARAMALAN COLLEGE COLLEGE DARAMALAN

UE

EMMAUSEMMAUS CHRISTIAN CHRISTIAN SCHOOL SCHOOL NORTH AINSLIE NORTH AINSLIE PRIMARYPRIMARY SCHOOL SCHOOL

PUBLIC TRANSPORT

PUBLIC TRANSPORT

HAWDON STREET

COMMON GROUNDGROUND 2 COMMON 2 BLOCK 25, SECTION 72 BLOCK 25, SECTION 72

COMMERCIAL ZONE

LEGEND SECTION 72

STR

STR

PER

COW

CREEK CREEK SULLIVAN’S SULLIVAN’S

NORTHBOU

SECTION 72

HAWDON STREET

EET

STR

PER

STR

EET

COW

PER

L

SUL

RNE AVEN

RNE AVEN NORTHBOU

EEK

RNE AVEN

UE RNE AVEN

LEGEND

NORTHBOU

LYNEHAMLYNEHAM WETLANDS WETLANDS

K EK REE CRE N’S A V I L L U S

SC

AN’

LIV SUL

C

DICKSON DICKSON SECTIONSECTION 72 72 COMMUNITY CENTRE CENTRE COMMUNITY + DARAMALAN COLLEGE COLLEGE + DARAMALAN AQUATIC CENTRE AQUATIC CENTRE

DICKSON DICKSON DICKSON DICKSON PLAYING FIELDS PLAYING FIELDS

NORTHBOU

UE

DICKSON DICKSON BUS BUS INTERCHANGE INTERCHANGE

K REE

CR DICKSON COMMERCIAL N’S DICKSON N’S COMMERCIAL PRECINCT IVA PRECINCT

IVA ULL

S

LYNEHAMLYNEHAM WETLANDS WETLANDS

DOWNER DOWNER

ANTILL STREET ANTILL STREET

DICKSON DICKSON LIGHT RAIL STOPRAIL STOP LIGHT

LYNEHAMLYNEHAM HIGH HIGH SCHOOL SCHOOL

DICKSON DICKSON COMMERCIAL COMMERCIAL Option 4 PRECINCTPRECINCT Same unit types as Option 3; 3 bed units made to be “standalone” units providing private green spaces for this type. Green space removed from site > local playing field acrossSULLIVAN’ SU the road may be sufficient for the occupants.

COW

UE

RNE AVEN

NORTHBOU

NORTHBOU RNE AVEN UE

Option 3 Scrapped 1 bed units, introduce 2 bed unit type 2, and 3 bed unit. North-west green space has been internalised to only a northerly aspect SOUTHWELL

LYNEHAMLYNEHAM HIGH HIGH SCHOOL SCHOOL

DICKSON DICKSON COMMUNITY CENTRE CE COMMUNITY + + AQUATIC CENTRE AQUATIC CENT

EET

DICKSON DICKSON LIGHT RAIL STOPRAIL STOP LIGHT

SOUTHWELL PARKS PARKS

Option 2 Close 50/50 split of 1 bed and 2 bed unit types. Communal/ commercial space is halved and only located on the east section of the building.

COMMERCIAL ZONE

EDUCATIONAL FACILITY

SULLIVANS CREEK

EDUCATIONAL FACILITY

SULLIVANS CREEK


MASSING RESPONSE

1.

2.

3.

1. Context - Site Area: 4,234m²

2. Site Footprint

3. Setbacks - Zero setback @ Sullivans Creek/ Green Link; activated corner - 3m setback to all other boundaries

4.

5.

6.

CONtext

SITE AREA: 4234m²

bUilDiNG eNvelOpe

SITE AREA: 4234m²

- 6m MAXIMUM hEIGhT LIMIT

7.

BREAKING DOWN SCALE

7. CBreaking O MM ON GDown ROU N Scale D2 HAWDON PLACE - BLOCK 25, SECTION 72 DICKSON - Site Area: 4,234m²

-THEINTEGRATIONOFGREENSPACECREATESTWOSEPARATEFORMS-ANLSHAPEDFORMWRAPPINGTHEHIGHLYPUBLICPARK,ANDASMALLER RESIDENTIAL SCALE FORM FACING THE DICKSON PLAYING FIELDS. -ALTHOUGHSEPARATE,THESEFORMSWILLBEDESIGNEDTOENSUREANINTEGRATEDDESIGNAPPROACHACROSSTHEDEVELOPMENT.

10.ENTRY - THE MAIN BUILDING ENTRY IS OFF THE NEW NORTHERN ROAD

site fOOtpRiNt

GReeN liNk - peDestRiaN & CYCle ONlY

9.

PREDOMINATELY TWO STOREYS TO SOUTHERN BOUNDARY

GReeN paRks - BUILDING MASS IS CARVED OUT TO PROVIDE A PUBLIC PARK FOR USE BY ThE COMMUNITY. ThIS PARK IS LOCATED TO ACTIVELY ENGAGE WITh ThE ‘GREEN LINK’ AND ThE BROADER ‘hEART’ OF SECTION 72. IT INTEGRATES ThE SURROUNDING COMMUNITY INTO COMMON GROUND BY PROVIDING COMMUNITY GARDENS AND PLAYGROUND FACILITIES. - A SMALLER GREEN SPACE SLICES ThE MASS IN TWO, CREATING A PRIVATE PARK EXCLUSIVELY FOR USE BY COMMON GROUND RESIDENTS. ThIS IS A SAFE, SECURE ENVIRONMENT FOR ThE MORE VULNERABLE COMMON GROUND RESIDENTS, ThOSE OCCUPANTS WITh ChILDREN, AND CAN ALSO BE UTILISED AS A BREAKOUT SPACE FROM ThE ADjACENT COMMUNITY FUNCTION.

ANCHORING THE CORNER

4 CCA

se 8. Adjusting scale & proportions M assiN G Re spON 9. Anchoring site corner - Sullivans Creek/ Green Link; collins caddaye architects activated corner -THEDESIGNPROPOSESTOLOWERTHESOUTHERNBUILDINGMASSALONGSULLIVANSCREEKTOPREDOMINATELYTWOSTOREYSINRESPONSETO COMMUNITY FEEDBACK REGARDING OVERLOOKING ISSUES.

11.TOWER ELEMENT

-BUILDUPMASSTOTHESOUTHWESTCORNERTOCREATEAPRESCENCEWHENAPPROACHINGTHESITEFROM SULLIVANS CREEK.

12.LINK

-THEMAINBUILDINGMASSISLOCATEDTOTHECENTREOFTHESITEINANORTH-SOUTHAXISTOWER,WITHTHEREMAINDEROFTHEMASSING STEPPING DOWN TOWARDS THE SITE PERIMETERS.

CO M M O N G R O U N D D I C K S O N paRklaNDs hOtel aND apaRtMeNts

BLOCK 25, SECTION 72 DICKSON

- ZERO SETBACK TO ACTIVATE CORNER ADjOINING SULLIVANS CREEK AND GREEN LINK. - 3 METER SETBACK TO ALL OThER BOUNDARIES.

- GREEN PEDESTRIAN AND CYCLE LINK CONNECTION FROM ANTILL STREET TO SULLIVAN’S CREEK

8.

setbaCks

THE TWO MAIN MASSING ELEMNTS ARE CONNECTED BY AN ACTIVE CIRCULATION LINK.

COMMON GROUND ii

MASSING RESPONSE

5

pReD tO sO


1.

2.

CONtext SITE AREA: 4234m²

4.

SITE AREA: 4234m²

5.

4. Building Envelope

BREAKING DOWN SCALE

-THEINTEGRATIONOFGREENSPACECREATESTWOSEPARATEFORMS-ANLSHAPEDFORMWRAPPINGTHEHIGHLYPUBLICPARK,ANDASMALLER RESIDENTIAL SCALE FORM FACING THE DICKSON PLAYING FIELDS.

-ALTHOUGHPLACE SEPARATE, FORMS BEDESIGNED TOENSUREANINTEGRATEDDESIGNAPPROACHACROSSTHEDEVELOPMENT. HAWDON -THESE BLOCK 25,WILL SECTION 72 DICKSON

10.ENTRY

- THE MAIN BUILDING ENTRY IS OFF THE NEW NORTHERN ROAD

GReeN paRks

- BUILDING MASS IS CARVED OUT TO PROVIDE A PUBLIC PARK FOR USE BY ThE COMMUNITY. ThIS PARK IS LOCATED TO ACTIVELY ENGAGE WITh ThE ‘GREEN LINK’ AND ThE BROADER ‘hEART’ OF SECTION 72. IT INTEGRATES ThE SURROUNDING COMMUNITY INTO COMMON GROUND BY PROVIDING COMMUNITY GARDENS AND PLAYGROUND FACILITIES. - A SMALLER GREEN SPACE SLICES ThE MASS IN TWO, CREATING A PRIVATE PARK EXCLUSIVELY FOR USE BY COMMON GROUND RESIDENTS. ThIS IS A SAFE, SECURE ENVIRONMENT FOR ThE MORE VULNERABLE COMMON GROUND RESIDENTS, ThOSE OCCUPANTS WITh ChILDREN, AND CAN ALSO BE UTILISED AS A BREAKOUT SPACE FROM ThE ADjACENT COMMUNITY FUNCTION.

SULLIVANS CREEK.

4 CCA

collins caddaye architects

11. Tower Element - Primary building mass is centralised, surrounding masses step down in size

-THEMAINBUILDINGMASSISLOCATEDTOTHECENTREOFTHESITEINANORTH-SOUTHAXISTOWER,WITHTHEREMAINDEROFTHEMASSING STEPPING DOWN TOWARDS THE SITE PERIMETERS.

CO M M O N G R O U N D D I C K S O N

6. Green parks - Building mass carved to provide ample green and community spaceTHE(private and public) 9. ANCHORING CORNER

M assiN G Re spON -se BUILDUPMASSTOTHESOUTHWESTCORNERTOCREATEAPRESCENCEWHENAPPROACHINGTHESITEFROM

-THEDESIGNPROPOSESTOLOWERTHESOUTHERNBUILDINGMASSALONGSULLIVANSCREEKTOPREDOMINATELYTWOSTOREYSINRESPONSETO COMMUNITY FEEDBACK REGARDING OVERLOOKING ISSUES.

11.TOWER ELEMENT

10. Entry

existiNG tRee bUffeR

12.LINK

12. Link - Massing elements connected by active circulation link @ south-east THE TWO MAIN MASSING ELEMNTS ARE CONNECTED BY AN ACTIVE CIRCULATION LINK.

MASSING RESPONSE

BLOCK 25, SECTION 72 DICKSON

DOMiNatelY 2 stOReY OUtheRN bOUNDaRY

6.

GReeN liNk - peDestRiaN & CYCle ONlY

- GREEN PEDESTRIAN AND CYCLE LINK CONNECTION FROM ANTILL STREET TO SULLIVAN’S CREEK

C OMMON G ROU N D 2

setbaCks - ZERO SETBACK TO ACTIVATE CORNER ADjOINING SULLIVANS CREEK AND GREEN LINK. - 3 METER SETBACK TO ALL OThER BOUNDARIES.

5. Green Link - Pedestrian & Cycle Only - Antill St/Sullivan’s Creek connection 8. PREDOMINATELY TWO STOREYS TO SOUTHERN BOUNDARY

bUilDiNG eNvelOpe

- 6m MAXIMUM hEIGhT LIMIT

7.

3.

site fOOtpRiNt

sUllivaNs CReek

5

DiCksON ResiDeNtial aRea


PERSPECTIVES OF FINAL CONCEPT

North-west perspective

C O M MO N G RO U ND 2

C ONCe p t pe Rspe Ctive s

HAWDON PLACE - BLOCK 25, SECTION 72 DICKSON

14 CCA

collins caddaye architects

South-west perspective

C ONCe p t pe Rspe Ctive s


PERSPECTIVES FOR DEVELOPMENT APPLICATION & COMMUNITY FEEDBACK

North-west perspective C O MMUNI T Y C O NSU LTAT I ON C O MMO N GRO U ND C AN B E R R A BLOCK 25 SECTION 72 DICKSON 14.08.2019 DRAF T

1. VIEW OF COMMUNITY POCKET PARK, COMMUNITY GARDENS & GREEN LINK

South-west perspective C O MMUNI T Y C O NSU LTAT I ON C O MMO N GRO U ND C AN B E R R A BLOCK 25 SECTION 72 DICKSON 14.08.2019 DRAF T

2. VIEW OF SOCIAL ENTERPRISE CORNER - MAINTAINING A PREDOMINATELY 2 STOREY SCALE TO THE SOUTH WITH END ANCHOR TO SIGNIFY PUBLIC ENTRY FROM SULLIVAN’S CREEK - PUBLIC ART MURAL OPPORTUNITIES - NO SOUTH FACING UNITS ABOVE LEVEL 1


St CLARE’S CATHOLIC COLLEGE LEARNING COMMONS Griffith, Canberra Education - New building + Refurbishment Present Library knocked down to be replaced with state of the art learning common space. Spaces for studying and collaboration, a modern interpretation of a library in reaction to the change of how learning sources can be obtained and distributed. Role: - Documentation of existing and new stairs - Primary element present within the three-storey space. - Liason with structural, mechanical, and tradespeople. All drawings produced for A1 print

F

E

8785

D

9330

FCL 582.53 PB1

SCD

PB1

2550

TIM1

BRIDGE 2

PA1 PA1 2 1

CPT1

LEVEL 2 FFL 579.98

STAIR 2

PB1 PA1

18

TIM1

17 700

16

PA1

15

FCL 579.28

14 PB1

13

BH

PA1

12

SK1

11

TIM2 PORTAL FRAME

10

PA1

9

TIM1

8 2550

7 5

BRIDGE 1

4 3

EXISTING LEVEL 1 FFL 576.73

TIM1

THROUGH TO PLACID WING

PA1

6

2 PB1 1

PA1

PA1

CPT1

STAIR 1

PA1 19

TIM1

18 750

N1

PB1

FFL 575.98

ceiling void mech. zone

PB1 PA1

865

JOINERY

CC

PA1

PA1

17 16 15

PA1

PA1

PA1

PA1 PA1

13

AC1

12

PA1

FFL 575.115

PA1

14

BH

11 1640

THROUGH TO CAFE 100

CURVED CORNER

8

AC1 (PINBOARD)

7 6

3 2 1

SK3

-

PA1

5 4

GROUND FFL 573.32

1

PA1

JG.14

810

1795

PLACID CORRIDOR

SL

9

AC1 (PINBOARD) 805

THROUGH TO PLACID WING

TIM1

PA1

10

10mm SCRIBE

STAIR 1 - ELEVATION 1 1:50

4

4

1

PB BH TIM1

TIM1

GLAZING BEYOND

PB1

50

SL

AC1

SL

HR1 HR1

1

OFC

BH

OFC/CC

180.56

EXISTING LEVEL 1 FFL 576.73

TG1

ST1 SN1 TF1

1

HR1

FFL 576.73

PCC

2

A6207

TG1

HR1

CPT1 OFC TIM1

PB1 PB2

FCL 576.08 TF1

PB1 15

2

200

1100

179.47

SK1

ceiling void mech. zone 1

ceiling void mech. zone

FCL 575.98

CS STAIR 1

FCL 575.87

TIM1

STAIR 1

2

CS

1

A6207

300

OFC

PA1

TIM1 10mm SCRIBE

2660

SL

CURVED CORNER

STAIR 1 & 2 - HANDRAIL &PA1BALSTRADE DETAIL

AC1 (PINBOARD)

1100

AC1

PA1 14a

CURVED CORNER

3

4

STAIR 1 - TREAD DETAIL

-

-

1:20 JG.14

GROUND FFL 573.32

PA1 2660

PB1

1:20

3

EXISTING LEVEL 1 FFL 576.73 FFL 573.32

AC1

3

RL 576.73

PB1

300

CPT1

200 OFCCS

PB1

-

RL 577.93 PA1

750

4

15

PB2

2

ST1 SN1

5

ST1 SN1

1100

HR1

4

TIM2 PORTAL FRAME

PCC HR1

SL

750

1099

WALL CODE 14a REFER TO WALL CODES DOCUMENTPB1

HR1 STAIR 2

A6208

AC1 ON PB BACKING

AC1 ON PB BACKING

25mm TOPHAT TIM1

750

PA1

HB1

900

HB1

210

SL

2450

HR1

STAIR 2

FCL 575.98

HR1

TIM1

TIM1

SL; 12mm LAM MDF STRIP

EXISTING LEVEL 1 FFL 576.73

HR1 PB1

90

TIM1

RL 576.73

PB1

FINISH FACE OF AC1 SETBACK FROM PB BH

PB1

50

GROUND FFL 573.32

STAIR 2 - TREAD DETAIL

CS

1:20

GROUND FFL 573.32

SK3

stair void

SK3

SB

2 -

STAIR 1 - ELEVATION 2 1:50

SL

3 -

PB1

STAIR 1 - SECTION A 1:50

4 -

STAIR 1 - SECTION B 1:50

100 x 8mm STEEL FLAT

100 x 8mm STEEL FLAT


1

STAIR 1 - ELEVATION 1

-

1:50

E

E

9330

D

9330

D

4

PB1

1

PB1

TIM1

GLAZING BEYOND

PB1

2

PB1

STAIR 2

SL

TIM1 TIM1

PA1

PA1

Final Sketch Concept

STAIR 2

1

A6208

TIM2 PORTAL FRAME TIM2 PORTAL FRAME

PB1 PA1

PB1 BH

CC

PA1PA1 CC

PA1

2660

PA1PA1 STAIR 1

PA1 OFC

THROUGH TO PLACID WING

AC1

100

PA1

810

1100

JG.14

PA1PA1

PA1 OFC/CC

AC1 (PINBOARD)

10

PA1TIM1 PA1

8 7 6

-

1

1

GLAZING BEYOND

GLAZING BEYOND

1100

GROU FFL 5

10mm SCRIBE SK3

4 -

4

10.04.2019

4

VISUALISATION 3

TIM1

PB1

PB1

SL HR1

TIM1

Final Design

1

HR1

STAIR 2

A6208

RL 577.93

HR1

HR1

STAIR 2

TIM1

PB1 PB2

FCL 575.98

FCL 575.87

HR1

JG.14

PA1

GROUND FFL 573.32

GROUND FFL 573.32

2660

2660

14a

CURVED CORNER

GROUND FFL 573.32

GROUND FFL 573.32

SK3

SK3

STAIR 1 3- SECTION STAIR A1 - SECTION A

4 -

1:50

STAIR 1 4- SECTION STAIR B1 - SECTION B

1:50

Final Design 1:50

Drawings produced for A1 print. LEARNING COMMONS ARCHITECT’S IMPRESSION

LEARNING COMMONS

2

STAIR 1

STAIR 1

CS

CS

PA1 14a

SK3

stair void

stair void

A6207

HR1

OFC

PA1 AC1 2450

PA1 AC1 (PINBOARD) AC1

CURVED CORNER

SK3

PB1

HR1

PA1

CURVED CORNER

JG.14

HR1

PB2

FCL 576.08

2450

AC1 (PINBOARD)

PCC

2

A6207

EXISTING LEVEL 1 EXISTING LEVEL 1 FFL 576.73 FFL 576.73

FCL 575.98

PCC

PB1

1100

1100 750

BH

FCL 576.08 FCL 575.87

PA1

RL 576.73

750

1100 750

BH

OFC/CC

ceiling void mech. zone

EXISTING LEVEL SK1 1 EXISTING LEVEL 1 FFL 576.73 FFL 576.73

210

ceiling void mech. zone

1100

SK1

ceiling void mech. zone

RL 576.73

PB1

CPT1

ceiling void mech. zone

RL 577.93

PB1

750

PA1

PB1

210

CPT1

-

GROUND FFL 573.32

1

TIM2 PORTAL FRAME

PA1

1:50

2

PB1

1

-

JG.14 2

ST CLARE’S LEARNING COMMONS

A6208

3

3

1:50

SL

CURVED CORNER

CURVED CORNER PA1

PA1 4

3Final STAIR 1 - SECTION A Sketch Concept

PB1

10mm SCRIBE

SL

PA1

5

10mm SCRIBE

TIM1

10mm SCRIBE

SL

1

STAIR 1 - ELEVATION 2

OFC/CC

FCL 5

TIM1

AC1 PA1

5 3

1:50

TIM2 PORTAL FRAME

AC1 (PINBOARD) PA1 7 6

9 8

SK3

FCL 576.08

BH

PA1

9

AC1 (PINBOARD) CURVED CORNER

EXIST FFL 5

FCL 575.87

11

CURVED CORNER

ceiling void mech. zone

PA1

12 10 10mm SCRIBE

A08

FFL 576.73

ceiling void mech. zone

PA1

JG.14

SK3

-

PA1PA1

13

AC1 (PINBOARD) CURVED CORNER

EXISTING LEVEL 1 SK1VISUALISATION 1

10.04.2019

14 12

100

CPT1

4

GROUND FFL 573.32

2

PA1

11

THROUGH TO CAFE THROUGH TO CAFE

TIM1

PA1 15

13

AC1 (PINBOARD)

STAIR 1

TIM1 16

14

AC1

STAIR 1

ST CLARE’S LEARNING COMMONS

PA1

17

PA1

SL

PLACID CORRIDORPLACID CORRIDOR

18

1

OFC 17

16 A6207 15

1640

TIM1

ceiling void mech. zone

PA1PA1 BH

PA1

19 18

ceiling void mech. zone

PB2

FCL 575.98

THROUGH TO PLACID WING

PA1 19

PB1

PB1

CPT1

RL 57

PB1

750

CPT1

SL

RL 577.93 PA1

PA1

2660

2 PB1 1

PA1

TIM1

3

2 PB1

PA1

HR1

805

3

EXISTING LEVEL 1 1 FFL 576.73

BRIDGE 1

TIM2 PORTAL FRAME

TIM1 PCC PA1

1100

4

750

1099

4

BRIDGE HR1 1

TIM1

750

PB1

THROUGH TO PLACID WING

210

5

THROUGH TO PLACID WING

1640

5

PA1

TIM1

RL 576.73 6 PA1

6

2450

TIM1 TIM1

TIM1 7

805

PA1

8

810

PA1

9

7

TIM1

10

OFC

OFC

OFC

A10

S

1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.