O RD I N AD I S C H AO
ALIEF RIYADI PORTFOLIO
A L I E F R IYA D I P O R T F O L I O al i e f . t . r i ya d i @g m a i l . co m 0419 32 8 98 4
Alief Thomas
R I Y A D I
Architectural Graduate
CONTACT Melbourne, Victoria +61 419 328 984 alief.t.riyadi@gmail.com linkedin.com/in/atriyadi
INFOR M AT I ON Australian citizen English Indonesian
PROF IL E - Open-minded individual willing to learn from peers. - Easy-going, can integrate seamlessly into any environment. - Constantly searching for new experiences and lessons. - Enjoys leadership, has been delegated leadership roles by peers. - Well involved with all peers; strong professional relationships. - Strong desire to make an impact through architecture; improving the way we and the environment live cohesively. - Interests have gravitated to detailed-orientated tasks and urban design.
Primary Secondary
Master of Architecture
EXPERIENCE | Employment SK ILLS So f t ware A d vanced
AutoCAD | Sketchup | Lumion
Photoshop | Illustrator | InDesign
Word | Excel | Powerpoint | Outlook incl. Google equivalent
3
COLLINS CADDAYE ARCHITECTS years as an architectural assistant
FEB 2017 - DEC 2019
- Small scale firm focusing on residential and education - Collaborated in the design of multiple projects; built + unbuilt - Mentored junior staff members w/ architectural and office standards - Involved in; Alterations & additions New Builds 3D Modelling Joinery design + doc Full construction + Technical documentation Town planning documentation - Project types; Single Dwelling Educational facilities
Multi-dwelling Multi-storey
Int ermedia t e
Rhinoceros 3D | Revit
So ft S kil l s -
Guaranteed dependability Transparent communication Strong critical thinking skills Culturally sensitive and aware Quick adaptability in unforseen circumstances Willingness to experiment and learn Thorough in the creative process Strong collaborative abilities Open-minded Sharp learner Sociable
ED UCAT ION M.Arch University of Canberra
2019
B.Arch University of Canberra
2016
Sketchbook Program Institute of European Design (IED)
2016
REF ERENCE S References provided upon request
E X P E R I E N C E | proje cts
COLLINS CADDAYE ARCHITECTS MED - LARGE SCALE ESTATE FORREST
87 unit high-end residential development
- DA and BA documentation - Construction documentation includes wet area, kitchen, joinery docs - Interior design includes kitchen, bathrooms and joinery - 3D modelling
CARROL COLLEGE
Education Architectural Assistant
Knockdown-rebuild and refurbishment of existing blocks 14 classrooms, staff room
- DA and BA documentation - Construction documentation includes wet area, kitchen, joinery docs - Interior design includes kitchen, classroom layout and joinery - 3D modelling
GOOD SHEPHERD CATHOLIC PARISH PRIMARY SCHOOL
Knockdown-rebuild and refurbishment of 5 blocks 20+ classrooms
- DA and BA documentation - Construction documentation includes wet area, kitchen, joinery docs - Interior design includes classroom layout and joinery - 3D modelling
ST CLARE’S COLLEGE Education Architectural Assistant
New communal education facility/library and refurbishment of 10+ classroom placid wing
- DA and tender documentation - Construction documentation includes wet area, kitchen, joinery docs - Interior design includes staircases and joinery - 3D modelling
MONASH MULTI-UNIT & CHILDCARE
New 20+ unit development & childcare centre
- DA and tender documentation - 3D modelling
CAMERA ST
Alteration & addition of a single-storey 3-bedroom dwelling into a two-storey 5-bedroom dwelling
- From sketch plans to final design - Complete design; architecture, kitchen, living room, bathrooms, joinery, staircase - Complete CDC, DA, BA documentation - Complete construction documentation - Coordination w/ consultants and builders
FRANKLIN-DOMINION
8 studios & 4 3-bedroom terraces
- From sketch plans to final design - Masterplanning - Competition styled submission - 3D modeling
POWERS RESIDENCE
Internal knockdown-rebuild into a 4-bedroom dwelling
- Interior design includes kitchen and joinery
Residential Architectural Assistant
Education Architectural Assistant
Residential Architectural Assistant
SMALL SCALE Residential Project Architect under supervision
Residential EOI Architectural Assistant
Residential Architectural Assistant
ARCHIPELAGO
NORTHBOURNE HOUSING
VERTICAL SCHOOL
Lake Burley Griffin & Northbourne Avenue/Parliament House Axis
O R G ANI SI NG CH AOS
CIRRICULUM VITAE // PROFESSIONAL WORK //
Camera Street, Manly Demonstration Housing Project St Clare’s Learning Commons
Residential Multi-residential Education
ACADEMIC WORK //
Vertical School Archipelago: Dickson Revived! Northbourne Avenue Housing
COMPETITION//
Opera by the Sea
uni.XYZ
Inside contains selected works produced during my employment at Collins Caddaye Architects, and graduate projects at the University of Canberra. Each project manages to exhibit a personal objective whilst meeting the expected outcomes provided in the brief. The term ordinadis chao - organising chaos - is my perception of architecture and it’s role within the world. The word chaos in itself inhibits a negative connotation and is quite jarring, but by acknowledging and understanding its existence you become far more capable of producing higher quality results of order. Life is the balance of chaos and order, light and dark, Yin and Yang; neither qualities are greater than the other, they are complementary forces that are required to exist. Everything around us has been fragmented into individual puzzle pieces, our task as architects is to identify the qualities of each piece and see the various possibilities that can come from it. It is natural for chaos to exist, and it is natural for us human beings to arrange that and make order from it all. Each semester solidified my foundations of theoretical and practical architecture, each semester allowed my curiosity to thrive. This is all present in my studio projects and essays that cover a varying but relevant topic of architecture that allowed discussion amongst my peers.
PROFESSIONAL WORK
The following are projects where my involvement in the design and architectural documentation was significant; all during my employment with Collins Caddaye Architects. Designing and documentation tasks include: - Architectural - Joinery - Interior - Landscape Involvement in other projects are outlined within the CV
CAMERA ST Manly, Sydney Single-Dwelling - Alterations & Additions July 2017 - Jan 2020 Single-story 3 bedroom dwelling altered & extended into a 5 bedroom & garage; situated on a steep site requiring close coordination with engineers and builders. An important element of the house was the staircase that tied all 3 storeys, a strong sculptural element to interact with on a daily basis. Role: - Sketch design - Compliant Development documentation - Acting Project Architect
- Final architectural design - Complete construction documentation
All drawings produced for A1 print
NOTE
A
B
D
C
2250
4700
THE DEVELOPMENT WILL COMPLY WITH THE ACT ENVIRONMENT PROTECTION AUTHORITY, ENVIRONMENT PROTECTION GUIDELINES FOR CONSTRUCTION AND LAND DEVELOPMENT IN THE ACT, AUGUST 2007
E
2390
6930
LEGEND
4
EXISTING STRUCTURE
A21
F
E
A24
A24
NEW STRUCTURE
14 CAMERA STREET, MANLY
D
G
C
A23
A25
A23
EXISTING ADJACENT SINGLE STOREY RESIDENCE
8
28.0
1
W-G
0° 11' 0" 33.045
℄
DP
08
915
1
1
07
℄
1510
W-G
℄
℄
09
922
29.0
927
W-G
924
600
1755
1610
EGL 28.215
782
TEL
W-G
DP
06
1 SKYLIGHT
1870
SC
3760
WIR
A33
ENS
J.05
CPT
3
CT1
LIVING
DINING
TIM1
TIM1
J.04
1960
ENTRY
TIM1
UP 1
01
3 A31
3
2
F-G 04
3
3000
26.0
WIR
2
HR
BATH
BED 2
J.07
CPT
16
SC
15
LC
13
4
12
7
4 A42
J.02
9
SC J.02
FW DP
1199
EGL 28.905
W-G
W-G
W-G
W-G
03
04
10
11
Door F-G:06 update; hinged timber door, NOT sliding timber door
8
4
DP
1
0° 11' 00" 26.52
947
2
4
PLASTERBOARD / 90mm STUD /ACOUSTIC INSULATION /PLASTERBOARD / WALL TILES TO WET AREAS
UPDATES:
F-G 05
TIM1 HR
TIM1
A31
PLASTERBOARD / 90mm STUD / PLASTERBOARD WALL TILES TO WET AREAS
KITCHEN
STAIRS
2° 54' 6.25
FC SHEET / 15mm PLY / MEMBRANE / FURRING CHANNEL / 90mm STUD / PLASTERBOARD
3
SC
UP 10
8
CPT 02
3
J.01
14
3
5 6
CT1
3
W-G
4
METAL CLADDING / MEMBRANE / 15mm PLY / 30mm FURRING CHANNEL / 90mm STUD / PLASTERBOARD WALL TILES TO WET AREAS
3a
EGL 30.00
3
F-G 03
W-G
1 - 110mm BRICK / 50mm CAVITY / 110mm BRICK VENEER RENDER BOTH SIDES
05
HALLWAY
CT2
TIM2
2
W-G
30.0
3
F-G 01
ST
SC SK SPF SS1 SS1 ST TD TIM1 TIM 2
2a
J.03
1130
1310
RL 29.80
FFL 30.00
SC
3
ALUMINIUM FRAMED GLAZING ALUMINIUM GLAZED DOOR ALUMINIUM FRAMED SLIDING DOOR ALUMINIUM FRAMED AWNING WINDOW BAGGED BRICK BALUSTRADE 1 (INTERIOR) CARPET FLOOR FINISH TILE TYPE 1 TILE TYPE 2 DOWN PIPE FLOOR WASTE HAND RAIL JOINERY UNIT TYPE - REFER TO JOINERY DRAWINGS FOR DETAILS OVERFLOW BOX GUTTER PARAPET CAPPING ROOF SHEETING TYPE (x) ROOF TYPE 1 (TILE TO MATCH EXISTING) ROOF SPREADER STRUCTURAL BEAM - REFER TO STRUCTURAL STRUCTURAL COLUMN - REFER TO STRUCTURAL SKYLIGHT CUSTOM STEEL PLATE FRAME HEKA HOODS® SYSTEM 900mm HEKA HOODS® SYSTEM 450mm STONE THRESHOLD (EXISTING) TIMBER DOOR TIMBER TYPE 1 TIMBER TYPE 2
2
990
F-G 02
3
2
900
J.05
AG AGD ASD AW BB BAL1 CPT CT1 CT2 DP FW HR JU.0(x)
1
F-G 06
900
CPT
90° 59' 00" 10.325
269° 20' 00" 10.035
7
BED 1
EXISTING BAGGED BRICK EXISTING BRICK WALL EXISTING CEMENT RENDER EXISTING GUTTER EXISTING ROOF TILES EXISTING STONE BASE EXISTING WINDOW
OBG PC RS(x) RT1 RSP SB
EGL 29.865
FW
3
EX BB EX BW EX CR EX G EX RT EX SB EX W
EGL 29.86 8
05/10/2018
7
26/09/2018
6 5 issue
UPDATES UPDATES
21/08/2018
UPDATES
07/08/2018
UPDATES
date
amendments
10 CAMERA STREET, MANLY EXISTING ADJACENT SINGLE STOREY RESIDENCE
F
E
D
G
C
A24
A24
A23
A25
A23
CVETANOVSKI RESIDENCE 12 CAMERA STREET. MANLY (LOT 1) RESIDENTIAL
3
project:
A21
GROUND FLOOR drawing title:
A
B
C
D
E
scale: 1:50 @ A1/1:100 @ A3
drawing no:
A11
issue no:
8 ãcopyright
Contractors must verify all dimensions on site before commencing any work or preparing shop drawings.
E
C
D
B
A
Y
X
9 8 7 6 5 4 3 2 1
BAL2 TILED TERRACE, STRUCTURE TO ENGINEER'S SPEC.
1000
FCL 29.60 FFL 28.80 2550
CELLAR
WALL BEYOND
3428
MUD/STORAGE
2470
LAUNDRY
FCL 28.47
330
8 7 6 5 4 3 2 1
800
BW
0.5% FALL ON STRUCTURAL SLAB
9
330
WB1 BEYOND
NGL
400
DW
400
FFL 30.00 BAL1
150 x 75 LVL
FFL 27.05 1050
GARAGE 0.5% FALL ON BASEMENT SLAB
450mm STEP
GARAGE FFL 26.00
100
STEP BEYOND
1420
WB1 BEYOND
3400
SITE BOUNDARY
FFL 33.40
STREET 25.90
SECTION A 1:50
1D
3
2
C
RL 37.378
850
BEYOND
2550
GARAGE
ENVEL
AW
JU.02
EX RT
BAL2 JU.01
DINING
KITCHEN
MC2
SECTION B
LAUNDRY
t
1000
BW
0.5% FALL ON STRUCTURAL SLAB
MC1
BB SECTION C
---
EX BB
existing stone stairs
MUD/STORAGE
1:50
CELLAR
WALL BEYOND
EGL
GARAGE 0.5% FALL ON BASEMENT SLAB
450mm STEP
SOUTH FACADE
1 ---
1:50
SECTION A
---
1:50
4
2
3
4
AG
PARAPET 36.75
AG
2048
ND
YO
BE
954
BB
RWH/ DP
EX BB
BB
AG
ASD
400
FFL 33.40
BUIL EGL
GARAGE FFL 26.00 1:50
EXISTING FOOTINGS TO BE CONFIRMED
STREET 25.90
t 1:50
JU.01
DINING
FFL 30.00
0.5% FALL ON BASEMENT SLAB NORTH FACADE 2
---
925
AGD JU.02
DING
3000
2500
GARAGE
SECTION B
AG
ENVE
FFL 30.00
---
ASD
ASD LOPE
400
FCL 28.80 FCL 28.50
L
RS3
SB
300
BW
0.5% FALL ON STRUCTURAL SLAB
E
FCL 33.00
ER
BED 4
BED 3
RS3
RL
600
FCL 29.40
914
RWH/ DP
ASD
943
FFL 30.00
BAL1
PC
EX BB
AWNING AGD
2040
RS3
PC
FCL 35.95
SECTION C 1:50
JU.02
KITCHEN
3130
AG
850
SITE BOUNDARY
3930
AG AG
BEYOND
AG
AG
9m Building height restriction
RWH/ DP
top of gutter
SS1
SITE BOUNDARY
MC1
MC1
RWH/ DP
SITE BOUNDARY
SITE BOUNDARY
PARAPET 33.93
2
2
PC
PARAPET 36.75
AG
---
1
1
RS2
2850
628
3
X
RL 37.378
SITE BOUNDARY
Y
2550
1
TILED TERRACE, STRUCTURE TO ENGINEER'S SPEC.
BAL1
ST
8 7 6 5 4 3 2 1
340
JU.02
EXISTING FOOTINGS TO BE CONFIRMED
9
SITE BOUNDARY
OPE
TOW (ADDITION) 32.98
WB1 BEYOND
EX SB 1:50
AGD
330
NGL
AG
2470
EXIST. FFL 30.00
EX BW
DW
STREET 25.90
ASD
MC2
EGL
GARAGE FFL 26.00
150 x 75 LVL
PC
EX G
ASD
MC1
FFL 30.00
0.5% FALL ON BASEMENT SLAB
2
TG
TGD
EX W
925
TOW 33.32
400
2500
STEP BEYOND
EX G EX W
L
RS3
FOLDED METAL SB FLASHING STEP
DING
8 7 6 5 4 3 2 1
RS1
BUIL
9 W EX
FC
2980
400
EX W
FCL 33.00
ER
BED 4
BED 3
RS3
L
ER
3000
600 300
400
EX RT
EX G
X
2040
3130
SITE BOUNDARY
943
FFL 33.40
WB1 BEYOND
---
RS3
EX RT
Exist. Fascia
5010
FCL 28.80 FCL 28.50
Y
SPF
FCL 35.95
FCL 29.40
BW
4
A
AW 2048
FFL 30.00
0.5% FALL ON STRUCTURAL SLAB
MC1
PARAPET 36.75
MC1
BAL1
4
B
9m Building height restriction
BEYOND
EXIST. RL 35.01
SITE BOUNDARY
2464
MC1
3
top of gutter
E
2
SITE BOUNDARY
1
X
SITE BOUNDARY
Y
SITE BOUNDARY
1 ---
600
GPO
SB-1
GPO
GPO
810
HT1 BT-1 PA-2
DR PA-2
DR PA-2
DR
PA-2
DR PA-2
DR PA-2
DR
PA-2
DR PA-2
DR PA-2
DR
OV
PN
BT-1
PN
AS
PN
AS
PA-2 KB
3600 6 EQUAL
460
B1 BASIN 1 B2 BASIN 2 BIN GARBAGE BIN - PULL OUT BT-1 BENCH TOP TYPE 1 - MAXIMUM TILE 'TAXOS' BT-2 BENCH TOP TYPE 2 - CAESAR STONE 'RAVEN' CD CLOTHES DRYER CT COOK TOP DW DISHWASHER - FULLY INTEGRATED FP FIREPLACE FR REFRIGERATOR - FULLY INTEGRATED FS FIXED SHELF GPO-AB GENERAL POWER OUTLET (ABOVE BENCH) GPO-BB GENERAL POWERACCORDINGLY: OUTLET (BELOW BENCH) CARCASS FINISH TO MATCH HT1 TYPE 1 - BLACK INDEX CO 'J PULLS XL' PA-1 FINISH, HANDLE MATCHED WITH MELAMINE CARCASS. MATTE POWDER COAT ‘BLACK ETCH' PA-2 FINISH, (900JPXL06) MATCHED WITH WHITE MELAMINE CARCASS. HT2 HANDLE TYPE 1 - INDEX CO 'J PULLS XL' MATTE POWDER COAT 'BLACK DIMENSIONS (600JPXL06) ARE TO STRUCTURE AND JOINERY AND ETCH' HT3 HANDLE TYPE 1 INDEX CO 'J PULLS XL' EXCLUDE WALL LININGS & FINISHES UNLESS NOTED OTHERWISE. (300JPXL06) MATTE POWDER COAT 'BLACK ETCH' HR HANGER RAIL KB KICK BOARD BLACK FINISH ON SITE PRIOR TO ALL MEASUREMENTS TO -BE CONFIRMED LC PRODUCTION.LAUNDRY CHUTE MIX1 MIXER TYPE 1 - KITCHEN MIX2 MIXER TYPE 2 LAUNDRY SHARK-NOSE HANDLES FOR ALL PULL DRAWERS AND OS CABINETS. OPEN SHELF OV OVEN PA-1 PANEL TYPE 1 - EVENEER 'RAVEENA' 0% GLOSS PA-2 PANEL TYPE 2 - 2 PAC WHITE TYPE 1 TO MATCH BT-3 PA-3 PANEL TYPE 3 - 2 PAC DULUX 'ARMADA' PA-4 PANEL TYPE 4 - 2 PAC WHITE TYPE 2 AS ADJUSTABLE PA-5 PANEL TYPE 5SHELF - 6mm STEEL SHEET W/ BLACK B1 BASIN FINISH 1 B2 BASIN PN HAFELE2 'ARENA' PULL OUT PANTRY BIN GARBAGE BIN - PULL OUT RH RANGE HOOD BT-1 BENCH TYPE 1 - MAXIMUM TILE 'TAXOS' RS ROUTEDTOP SLOT FCL BT-2 BENCH TYPE 2 -33.00 CAESAR STONE 'RAVEN' SB-1 SPLASHTOP BACK - MAXIMUM TILE 'PEPPER' CD CLOTHESSINK DRYER SI1 KITCHEN TYPE 1 CT COOK TOP MACHINE WM WASHING DW DISHWASHER WT WALL TILE - FULLY INTEGRATED FP FIREPLACE ZIP ZIP TAP FR REFRIGERATOR - FULLY INTEGRATED FS FIXED SHELF NOTES: GPO-AB GENERAL POWER OUTLET (ABOVE BENCH) GPO-BB GENERAL POWER OUTLET (BELOW BENCH) HT1 HANDLE TYPE 1 - INDEX CO 'J PULLS XL' 1. IF CLEARANCE FROM PULL-OUT PANTRY (900JPXL06) MATTE POWDER COATSYSTEM ‘BLACK ETCH' AVAILABLE, PLACE VERTICAL FACEXL' OF PANTRY. HT2 HANDLE TYPEGPO 1 - INDEX CO 'JONPULLS IF NOT(600JPXL06) POSSIBLE, PLACE ON SPLASHBACK MATTEGPO POWDER COAT 'BLACK ETCH' HT3 HANDLE TYPE 1 - INDEX CO 'J PULLS XL' (300JPXL06) MATTE POWDER COAT 'BLACK ETCH' HR HANGER RAIL KB KICK BOARD - BLACK FINISH LC LAUNDRY CHUTE TOP OF BENCH UPDATES/AMENDMENTS: MIX1 MIXER TYPE 1 - KITCHEN MIX2 MIXER TYPE 2 30.90 - LAUNDRY · OS NOTE UPDATE CARCASS FINISHES OPEN REGARDING SHELF OV OVEN PA-1 PANEL TYPE 1 - EVENEER 'RAVEENA' 0% GLOSS 20mm PA-2 PANEL TYPE 2 - 2 PAC WHITE TYPE 1 TO MATCH BT-3 PA-3 PANEL TYPE 3 - 2 PAC DULUX 'ARMADA' PA-4 PANEL TYPE 4 - 2 PAC WHITE TYPE 2 PA-5 PANEL TYPE 5FFL - 6mm30.00 STEEL SHEET W/ BLACK FINISH PN HAFELE 'ARENA' PULL OUT PANTRY RH RANGE HOOD RS ROUTED SLOT SB-1 SPLASH BACK - MAXIMUM TILE 'PEPPER' SI1 KITCHEN SINK TYPE 1 WM WASHING MACHINE WT WALL TILE ZIP ZIP TAP
GPO
HT1 HT1
PA-2 OV
PA-3 (SPLASH BACK)
LED LIGHT PN
PA-2
KB
90
FFL 30.00
GPO
CT
1100
1000
680
NOTE:
A ELEVATION 2 - J.02
A41
-
1:50
1
1100
600
FR
GPO
AS RH
SB-1
GPO
810
PA-2
DR PA-2
DR PA-2
DR
PA-2
DR PA-2
DR PA-2
DR
PA-2
DR PA-2
DR PA-2
DR
2460
GPO
BINCT
PN
PN
PN
ZIP SI1 GPO PN
OV
PN
AS
J.01
AS PA-3 PA-3 (CARCASS)
FS PA-3
PA-3 (SPLASH BACK)
PN
BT-1
HT1 HT1
PA-2 OV
AS PA-3 AS PA-3
RECESSED LED LIGHT
MIX1
GPO
DW
PN
AS
PA-2
4
KB
3600 6 EQUAL
460
3 1100
1000
680
ELEVATION 2 - J.02 APPLIANCE
-
CUPBOARD
POCKET 1:50 DOORS
2100
2
2
OV x2 Under benchtop
BROOM
overhead cupboards
PULL OUT PANTRY
J.03
J.02
AS
680
40
40mm CAVITY
1000
3600
460
600
RECESSED LED LIGHT GPO SB-1
1100
900
1200
AS
PA-2
FS PA-2 PN
PA-2
280
A/C
AS
KB
90
FFL 30.00
1:50
AS
PA-1 AS
1200
40 DR
700
AS
PA-1
3090
LCAS
PA-1
HT1 BT-1
800 EQUAL 3
DR
PA-1 AS
AS
BT-1 DR
PA-1 AS
AS
600
RECESSED LED LIGHT GPO SB-1
PA-1 AS
620
40mm CAVITY
AS
1190
20 280 1200
AS
1050
PA-2
1200
PA-2
APPLIANCE CUPBOARD/PA-3
AS
4000 300
A/C GRILLE TO MATCH PA-2
FCL 33.00
580
280
A/C
700
2
BT-1
800 EQUAL 3
DR DR
A
DR
A41
700
-
KITCHEN
-
J.01, J.02
ELEVATION 1 - J.0
1
1:50
1.
PA-3 CARCASS
FCL 33.00
-
NOTES:
1:50
12 SHAD 2
IF CLEARANCE FROM PULL-OUT PANTRY SYSTEM AVAILABLE, PLACE GPO VERTICAL ON FACE OF PANTRY. IF NOT POSSIBLE, PLACE GPO ON SPLASHBACK
FCL 33.00
PA-2 PA-2
PA-2
PA-2
PB
UPDATES/AMENDMENTS:
20mm KB
GPO PA-2 AS
APPLIANCE CUPBOARD W/ DIFFERENT 1:50CARCASS FINISH
AS AS
4000
600
DR
PA-2
DR PA-2
DR PA-2
DR
OV
OV
PN
AS
PA-2
GPO
FFL 30.00
1:50
KB
AS
PA-2
1900
4
RECESSED LED LIGHT GPO SB-1
DR
1:50
BIN
1:50
issue
2460
AS
ELEVATION 4 - J.01
-
600
570
570
PA-2
DR PA-2
PA-2
DR PA-2
PA-2
DR PA-2
460
project:
JOINERY 1 ELEVATION 2 - J.02 2
11
-
12/02/2019
UPDATE
06/02/2019
UPDATE
drawing title:
10
scale:
1:50 @ A1AMENDMENTissue no: 11 14/01/2019
issue
date
9
drawing no:
A41
amendments ãcopyright
Contractors must verify all dimensions on site before commencing any work or preparing shop drawings.
FCL 33.00 A/C
AS
40mm CAVITY
40 RECESSED LED LIGHT GPO SB-1
12mm BT-1 / 20mm SHADOW LINE / 20mm PA-2
FFL 30.00 GPO-AB
CVETANOVSKI RESIDENCE 12 CAMERA STREET. MANLY (LOT 1) RESIDENTIAL project:
DR
20mm KB
600
GPO HT1 20mm BT-1 KB
12 CAMERA STREET. MANLY (LOT 1) RESIDENTIAL
1:50
BT-1
GPO-AB
AS
AS
DW
JOINERY 1
DR
drawing title:
DR
scale:
1:50 @ A1
700 drawing no:
A41
issue no:
11 ãcopyright
Contractors must verify all dimensions on site before commencing any work or preparing shop drawings.
B
KITCHEN CONCEPT IMAGE 1
-
OPEN SHELF W/ DIFFERENT CARCASS FINISH
GPO ON UNDERSIDE OF OVERHEAD + GPO-AB VERTICAL ON PANTRY (NOTE 1)
IMAGE 2 ON UNDERSIDE OF C GPO @ 1600mm GPO ONCONCEPT UNDERSIDE SECTION A KITCHEN AGPO APPLIANCE W/ DIFFERENT CARCASS FINISH OVERHEAD W/ CT KILL FROM FFL OFCUPBOARD OVERHEAD -
GPO-BB FOR OV x2 GPO-BB FOR CT
-
1:50
AS BT-1
800 EQUAL 3
DW
AS
AS
FFL 30.00 KB CVETANOVSKI RESIDENCE
BT-1 PA-2
AS
PA-1 AS
600
GPO FOR FR x2
AMENDMENT amendments
PA-2
AS
4000
20 280
date
UPDATE
PA-1 AS
280
-
14/01/2019
940
GPO IN OS GPO FOR DW
06/02/2019
9
Zip unit clearance
700
GPOA IN OSSECTION A
MIX1
680
DR
570
GPO
UPDATE
PA-2
BT-1 DR
FFL 30.00
10
4000
1200
PA-2
470
IX1
0
BT-1
1100
1000
850
3600 6 EQUAL
PA-3 (CARCASS) 11 12/02/2019 PA-3 (SPLASH BACK)
ZIP
PN
30
DR PA-2
AS PA-3 FS PA-3
RECESSED LED LIGHT
PN HT1 HT1
PA-2
AS PA-3
600
3000
DR PA-2
PN
3000
940
PA-2
KB
40mm CAVITY
12mm BT-1 / 20mm SHADOW LINE / 20mm PA-2
20mm KB
-
GPO
PA-2
PA-2 AS
220
KITCHEN CONCEPT IMAGE 2
DR
BT-12 - J.02 ELEVATION
2
OS
A/C
BT-1
-
PA-3
DR PA-2
PN
GPO CT
DR PA-2
PN
PN
620
Zip unit clearance
AS
SB-1
GPO
PA-2
FS PA-2 PN
810
PA-2
FCL 33.00
AS PA-3
90
PA-2
1200 FCL 33.00
GPO
810
PA-3
ELEVATION 1 - J.01
1
PA-2 DW
AS
600
FREEZER
MIX1
PA-2
AS
460
ZIP
580
ZIP
AS
900
FREEZER
MIX1
3000
-
AS
PA-2
1200
900
C
FFL 30.00
1900
4000
KB 12mm BT-1 / 320 LINE / 940 20mm SHADOW 20mm PA-2
P50 SHADOW LINE
PA-2 AS
90
OS
1:50
-
AS
HT1 BT-1
ELEVATION 3 - J.03
3
AS
AS
PA-1
280
220
ZIP
FRIDGE BT-1 FRIDGE HT1 GPOHT1
FFL 30.00
4000
AS
PA-1
RH
1200
TOP OF BENCH 30.90 ELEVATION 1 - J.01 1 FFL 30.00 -
AS
AS
PA-1
40
AS
PA-1
600
2100 2980
900
MIX1 PA-3
HT3 PA-2 HT3 PA-3 HT1 GPO-AB GPO GPO-AB PA-2 AS AS 20mm KB HT2 HT2
FFL 30.00
AS
PA-1
AS
PA-2
NOTE UPDATE REGARDING CARCASS FINISHES
PA-2 PA-1
AS
FS
AS
12mm BT-1 / 20mm SHADOW LINE / 20mm PA-2
PA-2
800 EQUAL 3
2100
GPO
AS
TOP OF BENCH 30.90
1200
APPLIANCE AS CUPBOARD
·
20
AS
AS
300
A/C GRILLE TO MATCH PA-2
APPLIANCE CUPBOARD/PA-3
FCL 33.00
FCL 33.00
APPLIANCE CUPBOARD W/ DIFFERENT CARCASS FINISH
-
20 280
KITCHEN CONCEPT IMAGE AS 2
C
FCL 33.00
NO
NOTE
THE DEV ENVIRON ENVIRON CONSTRU THE ACT
1
ST
2
ST
3
ST
4
ST
-
-
-
200mm JOISTS BEYOND (refer to structural drawings)
TIMBER FLOOR - Tongue n Groove;
NOTE
TIMBER FLOOR - Tongue n Groove;
40x200x10mm FINS WELDED TO PFC TO ALLOW FIXING POINT FOR RIBBON BALUSTRADE
NOT FOR CONSTRUCTION
-
20mm STRUCTURAL SHEET POLYURETHANE SEAL
200PFC 200 PFC
THE DEVELOPMENT WILL COMPLY WITH THE ACT ENVIRONMENT PROTECTION AUTHORITY, ENVIRONMENT PROTECTION GUIDELINES FOR CONSTRUCTION AND LAND DEVELOPMENT IN THE ACT, AUGUST 2007
150 LVL
BLOCKING
NO
270
64
BATTEN
POLYURETHANE SEAL
NOTE
THE DEV ENVIRON ENVIRON CONSTR THE AC
10mm PLYWOOD
1
STAIR DETAIL 1
2
STAIR DETAIL 2
3
STAIR DETAIL 3
4
STAIR DETAIL 4
TIMBER FLOOR - Tongue n Groove;
-
-
270
64
-
270
FINS WELDED TO PFC TO ALLOW OF 150mm x 10mmPLATE FIXING POINT FORLINE RIBBON STRINGER FIXED TO WALL BALUSTRADE (refer to structural detail) FRAMING Groove; Engineered stair -nosing 225 xTongue 12mmnPLATE TREAD SUPPORT (to match TIMBER FLOOR) WELD FIXED TO STRINGER & PLATE BALUSTRADE - WRAPPED IN TIMBER TIMBER FLOOR - Tongue n Groove; FLOOR BOARDS WITH 6mm PACKING structuralWRAP sheet ZONE20mm & ISOLATION
64
115
TIMBER FLOOR - Tongue n Groove;
1 issue
07/09/ date
20mm STRUCTURAL SHEET POLYURETHANE SEAL
115
15
0
-
150 LVL
CVETANOV
TIMBER FLOOR - Tongue n Groove;
200PFC
12 CAMERA S RESIDENTIAL
150 LVL
project:
BLOCKING
STAIR D drawing title:
scale: 1:5 @ A1/
BATTEN 200PFC
POLYURETHANE SEAL
10mm PLYWOOD TIMBER FLOOR - Tongue n Groove;
6 -
STAIR DETAIL 6
drawing no:
A
Contractors must verify shop drawings.
64
4
3
2
3
4
64
2
270
64
NOT FOR CONSTRUCTION
115
TIMBER FLOOR - Tongue n Groove;
NOTE
90
THE DEVELOPMENT WILL COMPLY WITH THE ACT ENVIRONMENT PROTECTION AUTHORITY, ENVIRONMENT PROTECTION GUIDELINES FOR CONSTRUCTION AND LAND DEVELOPMENT IN THE ACT, AUGUST 2007
1 A63
1
STAIR DETAIL 1
2
STAIR DETAIL 2
3
STAIR DETAIL 3
4
STAIR DETAIL 4
5 A63
-
400
THE ENVI ENVI CON THE
200PFC (REFER TO STRUCTURAL DRAWING) P50 SHADOW LINE
-
FFL 33.40
NO
16mm STEEL PLATE
106
400
240 LVL
FCL 33.00 200 PFC
-
2 A63
-
1611
200 PFC
3 A63
250 250 250 250
270
150 LVL
150 LVL
20
20
40x200x10mm FINS 40x200x10mm FINS WELDED TO PFC WELDED TO ALLOW TO PFC TO ALLOW FIXING POINT FORFIXING RIBBON POINT FOR RIBBON BATTEN POLYURETHANE SEAL BALUSTRADE BALUSTRADE 4
20
20
400
FFL 30.00
10mm PLYWOOD
FCL 29.60 200 PFC
TIMBER FLOOR - Tongue n Groove;
4
200mm JOISTS BEYOND 200mm JOISTS BEYOND (refer to structural(refer drawings) to structural drawings)
200PFC
BLOCKING
200PFC -
200PFC
-
TIMBER FLOOR - TIMBER Tongue nFLOOR - Tongue n Groove; Groove; 1000
200 PFC
150 LVL
20mm STRUCTURAL 20mm SHEET STRUCTURAL SHEET
200PFC
16mm STEEL PLATE
1075
260
270
200 PFC
BAL2
BLOCKING
200 150 PFC LVL 150 LVL
150 LVL
200 PFC
150 LVL
200PFC
200PFC
64
260 260
1300 TIMBER STAIR FRAMING BY BUILDER
260
270
1
07/09/2018
issue
date
For Costing
260
amendments
BATTEN
20mm structural sheet
SL 26.85
260
270
TIMBER FLOOR - Tongue n Groove;
FFL 27.05
200PFC
200PFC
POLYURETHANE POLYURETHANE SEAL BATTEN SEAL
64
P50 SHADOWLINE
10mm PLYWOOD10mm PLYWOOD 150 LVL
ELEVATION/SECTION 1
2 - TIMBER 4 5ELEVATION/SECTION TIMBER FLOOR Tongue nFLOOR - Tongue n Groove; CVETANOVSKI RESIDENCE Groove; STAIR DETAIL 5
-
-
-
12 CAMERA STREET. MANLY (LOT 1) RESIDENTIAL
200PFC
project:
260 STAIR DETAILS - DETAILS 1 drawing title: issue no: 1
64
scale: 1:5 @ A1/ 1:10 @ A3
drawing no:
A64
copyright
120
Contractors must verify all dimensions on site before commencing any work or preparing shop drawings.
260
64
FINS WELDED TOFINS PFC WELDED TO ALLOW TO PFC TO ALLOW FIXING POINT FORFIXING RIBBON POINT FOR RIBBON BALUSTRADE (refer BALUSTRADE to structural(refer detail) to structural detail)
120
1475
FINS WELDED TO PFC TOBLOCKING ALLOW FIXING POINT FOR RIBBON BALUSTRADE (refer to structural detail)
Tongue n Groove; Engineered stair nosing 260 (to match TIMBER FLOOR) 358
20
12PL STRINGER FIXED TO STUD WALL
260
200PFC
LAND. FFL 28.525
64
7 A63
POLYURETHANE SEAL POLYURETHANE SEAL
A63
260
TIMBER FLOOR - TIMBER Tongue nFLOOR - Tongue n Groove; Groove;
3
3
270 6mm FLANGE FLUSH w/ FFL
POLYURETHANE SEAL 250 200PFC
TIMBER FLOOR - Tongue n Groove;
2
TIMBER HANDRAIL
20mm STRUCTURAL SHEET
LAND. FFL 31.61
-
12PL TO STUD WALL
TIMBER FLOOR - Tongue n Groove;
40x200x10mm FINS WELDED TO PFC TO ALLOW FIXING POINT FOR RIBBON BALUSTRADE
1
6 A63
-
1789
200mm JOISTS BEYOND (refer to structural drawings)
Tongue n Groove;Tongue Engineered stair nosing n Groove; Engineered stair nosing (to match TIMBER(toFLOOR) match TIMBER FLOOR)
NOT FOR CONSTRUCTION
150 LVL
TIMBER FLOOR - Tongu Groove;
20mm STRUCTURAL S
1 issue
BLOCKING
0
date
200PFC
20mm structural sheet 20mm structural sheet
THE DEVELOPMENT WILL COMPLY WITH THE ACT ENVIRONMENT PROTECTION AUTHORITY, ENVIRONMENT PROTECTION GUIDELINES FOR CONSTRUCTION AND LAND DEVELOPMENT IN THE ACT, AUGUST 2007
Tongue n Groove; Engineered stair nosing (to match TIMBER FLOOR)
TIMBER FLOOR - Tongue n Groove;
TIMBER FLOOR - TIMBER Tongue nFLOOR Groove; - Tongue n Groove; NOTE
225 x 12mm PLATE TREAD SUPPORT WELD FIXED TO STRINGER & PLATE BALUSTRADE - WRAPPED IN TIMBER FLOOR BOARDS WITH 6mm PACKING ZONE & ISOLATION WRAP
7
STAIR DETAIL 7
-
150 LVL
150 LVL
CVETAN
200PFC
200PFC
12 CAME RESIDENT project:
1
STAIR DETAIL 1
-
STAIR
drawing title
2
STAIR DETAIL 2
3
STAIR DETAIL 3
4
STAIR DETAIL 4
-
-
-
scale: 1:5 @
drawing no:
Contractors mu shop drawings.
DEMONSTRATION HOUSING PROJECT Forrest, Canberra Multi-Residential - EOI Aug 2017 Initial design in collaboration with project architect; EOI organised by ACT Planning and Land Development to create an ‘alternate’ housing solution in hopes to challenge and test current development codes within the capital. Discovering possibilities that were positive for inhabitants and neighbours were of concern, but a major element that we wanted to achieve was providing a sufficient private green space for each unit, exclusively balconies were not acceptable. Role: - Sketch design - Preliminary plans
- 3D modelling
ARTICLE PUBLISHED BY THE CANBERRA TIMES https://www.canberratimes.com.au/story/6150098/future-homes-taking-shape/digital-subscription/
St CLARE’S CATHOLIC COLLEGE LEARNING COMMONS Griffith, Canberra Education - New building + Refurbishment Present Library knocked down to be replaced with state of the art learning common space. Spaces for studying and collaboration, a modern interpretation of a library in reaction to the change of how learning sources can be obtained and distributed. Role: - Documentation of existing and new stairs - Primary element present within the three-storey space. - Liason with structural, mechanical, and tradespeople. All drawings produced for A1 print F
E
8785
D
9330
FCL 582.53 PB1
SCD
PB1
2550
TIM1
BRIDGE 2
PA1 PA1 2 1
CPT1
LEVEL 2 FFL 579.98
STAIR 2
PB1 PA1
18
TIM1
17 700
16
PA1
15
FCL 579.28
14 PB1
13
BH
PA1
12
SK1
11
TIM2 PORTAL FRAME
10
PA1
9
TIM1
8 2550
7 5
BRIDGE 1
4 3
EXISTING LEVEL 1 FFL 576.73
TIM1
THROUGH TO PLACID WING
PA1
6
2 PB1 1
PA1
PA1
CPT1
STAIR 1
PA1 19
TIM1
18 750
N1
PB1
FFL 575.98
ceiling void mech. zone
PB1 PA1
865
JOINERY
CC
PA1
PA1
17 16 15
PA1
PA1
PA1
PA1 PA1
13
AC1
12
PA1
FFL 575.115
PA1
14
BH
11 1640
THROUGH TO CAFE 100
CURVED CORNER
8
AC1 (PINBOARD)
7 6
3 2 1
SK3
-
PA1
5 4
GROUND FFL 573.32
1
PA1
JG.14
810
1795
PLACID CORRIDOR
SL
9
AC1 (PINBOARD) 805
THROUGH TO PLACID WING
TIM1
PA1
10
10mm SCRIBE
STAIR 1 - ELEVATION 1 1:50
4
4
1
PB BH TIM1
TIM1
GLAZING BEYOND
PB1
50
SL
AC1
SL
HR1 HR1
1
OFC
BH
OFC/CC
180.56
EXISTING LEVEL 1 FFL 576.73
TG1
ST1 SN1 TF1
1
HR1
FFL 576.73
PCC
2
A6207
TG1
HR1
CPT1 OFC TIM1
PB1 PB2
FCL 576.08 TF1
PB1 15
2
200
1100
179.47
SK1
ceiling void mech. zone 1
ceiling void mech. zone
FCL 575.98
CS STAIR 1
FCL 575.87
TIM1
STAIR 1
2
CS
1
A6207
300
OFC
PA1
TIM1 10mm SCRIBE
2660
SL
CURVED CORNER
STAIR 1 & 2 - HANDRAIL &PA1BALSTRADE DETAIL
AC1 (PINBOARD)
1100
AC1
PA1 14a
CURVED CORNER
3
4
STAIR 1 - TREAD DETAIL
-
-
1:20 JG.14
GROUND FFL 573.32
PA1 2660
PB1
1:20
3
EXISTING LEVEL 1 FFL 576.73 FFL 573.32
AC1
3
RL 576.73
PB1
300
CPT1
200 OFCCS
PB1
-
RL 577.93 PA1
750
4
15
PB2
2
ST1 SN1
5
ST1 SN1
1100
HR1
4
TIM2 PORTAL FRAME
PCC HR1
SL
750
1099
WALL CODE 14a REFER TO WALL CODES DOCUMENTPB1
HR1 STAIR 2
A6208
AC1 ON PB BACKING
AC1 ON PB BACKING
25mm TOPHAT TIM1
750
PA1
HB1
900
HB1
210
SL
2450
HR1
STAIR 2
FCL 575.98
HR1
TIM1
TIM1
SL; 12mm LAM MDF STRIP
EXISTING LEVEL 1 FFL 576.73
HR1 PB1
90
TIM1
RL 576.73
PB1
FINISH FACE OF AC1 SETBACK FROM PB BH
PB1
50
GROUND FFL 573.32
STAIR 2 - TREAD DETAIL
CS
1:20
GROUND FFL 573.32
SK3
stair void
SK3
SB
2 -
STAIR 1 - ELEVATION 2 1:50
SL
3 -
PB1
STAIR 1 - SECTION A 1:50
4 -
STAIR 1 - SECTION B 1:50
100 x 8mm STEEL FLAT
100 x 8mm STEEL FLAT
10
PA1
9
TIM1
8 2550
7
TIM1
THROUGH TO PLACID WING
PA1
6 5
BRIDGE 1
4 3
2 PB1 1
EXISTING LEVEL 1 FFL 576.73
PA1
PA1
CPT1
PA1 19 18
750
N1
PB1
FFL 575.98
PA1 865
JOINERY
PA1
16 15
PA1
PA1
PA1
14
BH
CC
PA1
17
ceiling void mech. zone
PB1
13
AC1
12
PA1
11 1640
FFL 575.115
THROUGH TO CAFE 100
JG.14
810
1795
PLACID CORRIDOR GROUND FFL 573.32
CURVED CORNER
805
THROUGH TO PLACID WING
AC1 (PINBOARD)
SK3
1
STAIR 1 - ELEVATION 1
-
1:50
4
1
TIM1
GLAZING BEYOND
PB1 PB1
TIM1
SL
1
STAIR 2
A6208 PB BH
TIM1
4
1100
15 CS
GROUND FFL 573.32
TG1
1
1100
750
xBW xCS
2
xEC ST1 xST SN1 TF1 xTZ T
15 1
AC1 AC2 AG AW BAL1 BAL2 BAL3 BH CC CONC CONC CPT1 CS FB1 GN HB1 HR1 HR2 LSD OFC PA1 PB1 PB2 SK1 SK2 SK3 SL SN1 SN2 SN3 ST1 TC1 TD TF1 TG1 TIM1 TIM2
CPT1
GROUND FFL 573.32
CS TF1
1100 750 210
CURVED CORNER
JG.14
TG1
LEG
3
FFL 576.73
FFL 573.32
2
CS
AC1
300
PA1 ST1 AC1 SN1 TF1
1
15
1 TF1
900
3
FFL 573.32
2
CS
300
CURVED CORNER
200
200
900
200
300 3
2
AC1 (PINBOARD) 15
THE D ACT E ENVIR CONS THE A
2660
4
179.47
ST1 SN1
300 3
ST1 SN1
5 SCRIBE 10mm
NOT
HR1
FCL 575.87
4
AC1
180.56
5
PA1
PB1
FCL 576.08
BH
200
4
AC1 ON PB BACKING ST1 SN1
AC1 ON PB BACKING
PA1
HR1
OFC/CC
HB1
180.56
OFC
STAIR 1
179.47
PA1
TIM1
1099 2660
HR1
HB1
EXISTING LEVEL 1 FFL 576.73
ceiling void mech. zone
ceiling void mech. zone
HR1
A6207
SL
HR1
PB1
CS
SK1
PB1
1
OFC
WALL CODE 14a REFER TO SL WALL CODES DOCUMENT
ST1 SN1
PB1
FINISH FACE OF AC1 SETBACK FROM PB BH CPT1
50
HR1
AC1 ONTOPHAT PB 25mm BACKING TIM1
AC1 ON PB BACKING
PA1
90
SL; 12mm LAM MDF STRIP PB2 HR1 HB1
AC1
FINISH FACE OF AC1 SETBACK FROM PB BH 50
PB1
FCL 575.98
HB1
AC1
HR1
90
TIM1
750 SL
HR1
HR1
SL 50
EXISTING LEVEL 1 FFL 576.73
RL 577.93
PCC
PB1
50
BH TIM2 PORTAL FRAME
2450
RL 576.73
NOT
PB
TG1
SK3
STAIR 1 - ELEVATION 2
3
3
STAIR 1 & 2 - HANDRAIL & BALSTRADE DETAIL
SB SL
SL
PB1
PB1
100 x 8mm STEEL FLAT
100 x 8mm STEEL FLAT 100 x 8mm STEEL FLAT
2288
100 x 8mm STEEL FLAT MS FLAT BARS
100 x 8mm STEEL FLAT MS FLAT BARS
HR1
TIM1
HR1
HB1
280
22
CONC1 SN1
24
260 PB1
1
4
SK1 CS
4
xTZ - UNDERNEATH CPT1
3
xCS xCS
stair void
1
CPT1
8mm WELDED PLATE - TO CAPTURE CPT1 xCS
stair void
8mm WELDED PLATE - TO CAPTURE CPT1 xCS
xCS
TG1 PB1
PB1
PB1 108
SK1
SL
108
CS
CS
STAIR STAIR 3 -3TREAD - BALUSTRADE DETAIL 2 & BULKHEAD DETAIL
260
2
WALL CODE 14 REFER TO WALL CODES DOCUMENT
stair void
CPT1 - xTZ UNDERNEATH
PB1
TG1
WALL CODE 14 REFER TO WALL CODES DOCUMENT
8mm WELDED PLATES - FIXED TO SLAB EDGE, CAPTURES CPT1
5
4
2
21 20
xTZ - TO REMAIN CPT1 - xTZ UNDERNEATH
3
23 1185
1185 900
PB1
170.5
HB1 900
PB1
180.56
HR1
4
HR1
5 SL - 20mm; 16mm LAM MDF 16mm TOP HAT
275
TIM1
1100
TIM1
BH
275
2386 VARIES
1750
TIM1
BH
SL - 20mm; 16mm LAM MDF 16mm TOP HAT
- - 1:201:20
1:20
100 x 8mm STEEL FLAT MS FLAT BARS
xTZ - TO REMAIN
67
-
STAIR 2 - TREAD DETAIL
-
15
HR1
TG1
4
4
1:20
300
PB2
AC1
stair void
-
BH 300
15
24
STAIR 1 -4TREAD STAIR DETAIL 2 - TREAD DETAIL
1:20
PB1
100
100
PB1
BH
5
STAIR 1 - SECTION A
1:503 -
1:20
SB
PB2 PB2
23
-
STAIR 1 - TREAD DETAIL
-
1:20
170.5
-
1100
1:50 2
-
2288
2
RADE DETAIL
8 -
STAIR 7 4STAIR - TREAD 3 - DETAIL BALUSTRADE (EXISTING) & BULKHEAD DETAIL
1:20-
1:20
9 8STAIRSTAIR 4 - BALUSTRADE 4 - TREAD DETAIL 1 DETAIL (EXISTING) 1 -
1:10 1:20
910 STAIR STAIR4 4- BALUSTRADE - BALUSTRADE1 1DETAIL DETAIL1 2 - -
10 -
1:10 1:10
01
PG Studio 3
VERTICAL SCHOOL
A new typology that is currently emerging in architecture; the vertical school. This project provided opportunities to question what makes a school a school, and what can make a vertical building dynamic. Located in the CBD, the secondary education vertical school required a contextual relationship with its urban settings, publicly accessible facilities as a contribution will help enrichen and encourage the relationship with the public realm. Large focus on section reveals the potential of the architecture within; crafting and sculpting spaces from a block of stone.
Perspective section
CIRCULATORY CONCEPT
CIRCULATORY SYSTEM
Experimenting with an alternate circulatory system that causes a greater impact in providing events - Bernard Tschumi’s theory. The shift/split of the typical primary circulation distributor ‘stretches’ occupancy of a space, in this particular instance the school quad halfway through the building; an important quality of schools.
PROGRAMMATIC ORGANISATION
A
B
N
4th FLOOR
N
10th FLOOR
Section A
Public Library + Cafe
Art & Entertainment Facilities School Quad
Educational Facilities (Classrooms)
Rooftop Courtyard
Section B
PG Studio 4
DICKSON: ARCHIPELAGO REVIVED!
The Garden City dream and the many town-centres that are scattered through Canberra has withdrawn the potential of creating dense urban environments, Dickson Shops being one of them. Although located close to the CBD it is an area that is under utilised. Town-centres have not reached their full potential due to the lack of commitment to produce the facilities for these communities. What if we were to commit radically and discover the true potential of town-centres through the route of a hybrid-megaform, thus producing what we can consider an ‘archipelago’.
Final painting of site
Initial sketch of given site. Painting the site to help identify key surrounding elements and characteristics.
Direct element is identified, how to embrace and enhance it w/ architectural elements. This also highlights the path and route of the site.
Final draft; painting with regular forms and patterns, organised in a chaotic manner allows an observation of possibilities. Relationships of forms, view points, site axis’, and language of site are exposed.
Section A ‘Dining Pod’ sitting gently on the lifted ground plane. Transparency through pod maintaining the relation of the internal form as a whole. Marketplace expands the entire basement level.
Performance hall and public rooftop courtyard. Articulation of the ‘wall’ providing clear sightlines directly through the entire form. Section B
Woolley St
Cape St
A
B
Indoor Garden
Foyer
Towards Sector A
Sullivans Creek
Badhman St
Towards Sector C
Dining
Dining Amphitheatre
Bike parking
Dining
N
PG Studio 2
NORTHBOURNE AVENUE HOUSING
Successful housing projects are achieved through the success of communal and social facilities. The proposed sites were located along a vital prominent arterial road of historical significance to the conception of Canberra; currently undergoing large scale redevelopment to further densify the CBD and its surroundings. Northbourne Avenue has been neglected and lost its charm and connection to Canberra due to the jarring juxtaposition between humans and machine; focus has instead been reorientated towards the residential side of the adjacent sites or completely divided with the development of multi-storey offices with no relationship. This project was an exploration into altering a negative component of the city into an advantage, whilst solving the initial housing objective. A gateway that promotes the community values and culture of Canberra, and retuning the purpose of Northbourne Avenue back to what it originally was.
Project axonometric
Lyneham High School
ue
Stage 2
No
Lyneham Wetlands
rne
ou
b rth
en Av
is Ax
Dickson Shops
Black Mount
ain - Mt. Maj
ura Axis
Stage 1
c
ivi
C To
N or
tn
ec
oj pr
th
N or
tn
ec
oj pr
th
Arterial Road
Site Circulation
Hard edge has been broken and diminshed between the two sites. Hard edges continue beyond the sites along Northbourne Avenue
Circulation between site on either side of Northbourne available w/ pedestrian crossing at the southern end, and bridge at the northern end creating ownership of the space to pedestrians > to the residents of Canberra
Visual Breaks
Stage 2
Visual breaks provided with views towards the sky; lowest building height @ 3 storeys. Mass of buildings eased by elevating form a storey above ground level. Large setback of the forecourt eases the presence of a large building along Northbourne
Masterplanned to include adjoining sites
Ground Plan Scale 1:1000
N
Level 3 Scale 1:1000
N
uni.XYZ Competition
OPERA by the SEA
This project required a design of an Opera House fit for today - a cultural hub -, one that encapsulates the architectural style of the 21st Century that is iconic but can withstand the passage of time, lasting for decades to come. Designed to encapsulate the history, the culture, and the surrounding context Valge Laev - named after the mythological White Ship that brings freedom and takes people to a better land - is a cultural hub that belongs to the people of Tallinn, Estonia. It was essential that the project became a cohesive junction between the Soviet Union constructed Linnahall Arena and the Port of Tallinn resulting in a harmonious waterfront presence between all three sites.
Project contextual birds-eye
Diagrams analysing and identifying relationships of environmental and architectural elements. Orange representing primary elements; either mandatory links/relationships between functions, or highlighting that the collection of programs will represent the building’s spirit in function and form.
Ship
Linnahall Quick sketches in attempt to produce a form that is identifiable through simple lines; an icon that all can be easily remembered.
Dock
Designed based a hybrid of a ship, Linnahall, and a dock. Ship represented by curviliniear lines, dock orthogonal linework, Linnahall by the opera house as a whole - an alien mothership upon the shores of Tallinn.
Opera House
Above: Reforming site; creating interesting vantage points upon the shoreline for dwellers and incoming visitors. Initial sketch of opera house silhouette. Attempt to create heirachy within the sectional form. Side & Below: sketching architectural elements ie; beside - courtyard pavement characteristic to be achieved, and stair/ramp layout for lower court seen in plan.
DECK/AMPHITHEATRE
N BATH HOUSE
Main Con Hotel Atrium Plaza
Basement
ATRIUM PLAZA
Lower Court
ncert Hall
Museum Upper
MAIN CONCERT HALL
Museum Lower