YMI 2023

Page 1

Building the Future, One Mechanical Solution at a Time.



Welcome to The YMI Group. Established with its headquarters in Chicago, The YMI Group has been a trusted provider of specialized mechanical contracting services in the HVAC, Sheetmetal, plumbing, and service/maintenance sectors. With a strong commitment to excellence and customer satisfaction, we have expanded our operations to the great state of New York in 2019, bringing our expertise and quality services to clients in this region. Our team of highly skilled professionals brings years of experience and expertise to every project we undertake. We understand the unique challenges and requirements of the mechanical contracting industry, and we have the knowledge and capabilities to handle projects of any size and complexity. In the field of HVAC, we recognize the importance of creating comfortable and efficient environments. Our team works closely with clients to design and install HVAC systems that meet their specific needs, ensuring optimal performance and energy efficiency. From commercial buildings to industrial facilities, we have successfully completed numerous projects, earning the trust of our clients. Sheetmetal fabrication and installation is another area of expertise for The YMI Group. Our skilled craftsmen utilize state-of-the-art equipment and techniques to deliver precisionengineered sheet metal components for various applications. Whether it’s ductwork, ventilation systems, or custom metalwork, we take pride in our ability to deliver top-notch solutions

that meet the highest industry standards. Plumbing is an essential aspect of any building, and we offer comprehensive plumbing services to ensure efficient water distribution and waste management systems. Our team of licensed plumbers is well-versed in the latest plumbing technologies and practices, enabling us to provide reliable and cost-effective solutions for residential, commercial, and industrial projects. At The YMI Group, we understand the importance of regular service and maintenance for the longevity and optimal performance of mechanical systems. Our dedicated service team offers preventive maintenance plans and prompt repair services to keep your systems running smoothly. With our proactive approach, we help our clients avoid costly breakdowns and ensure uninterrupted operations. With our recent expansion into New York, we are excited to bring our expertise and quality services to clients in this region. We are committed to providing the same level of excellence and customer satisfaction that has made us a trusted name in the industry. When you choose The YMI Group, you can trust that you are partnering with a reliable and experienced mechanical contracting company. Contact us today to discuss your project requirements and experience the difference of working with a trusted industry leader.


Vassar Brothers Medical Center

NUVANCE HEALTH NEW PATIENT PAVILION Established in 1884 on Henry Livingston farmland along the Hudson River, Vassar Brothers Hospital opened on April 11, 1887 and treated 80 patients in its first year. A training school for nurses was established in 1890, and a stone wall was erected around the perimeter of the 17 acres. Enter the new age with this extraordinary 752,000-squarefoot addition to our campus, funded in part by the generosity of the community, allows our client to dramatically enhance how healthcare is experienced. With its distinctive shape that follows the aesthetic of the Hudson River, the new Patient Pavilion adds an eight-level addition to the existing Vassar Brothers Medical Center (VBMC) in Poughkeepsie, NY. The Patient Pavilion features amenities that provide the caliber of healthcare and the environment expected by sophisticated modernday patients and their families. The spacious building includes: • 263 private rooms on four floors • 30 intensive care rooms • 13 surgical suites • Emergency and trauma center with 66 exam rooms and ample parking for ambulances and the public • Flexible conference center that accommodates up to 300 people for use by the public and service groups • 220-seat cafeteria with outdoor dining • Green roofs to assist in water management and patient views

• Rooftop helicopter landing pad • Four dedicated visitor elevators that run from the underground parking lot to the patient floors • Designated meditation room, gift shop and access to an outdoor public terrace • Two-level open atrium that overlooks the Hudson River • Footbridge over Livingston Street that connects to the Emergency and Trauma Center. • Emergency and Trauma Center consisting of The Anna-Maria and Stephen Kellen Emergency Department is nearly 58,000 square feet. It has its own entrance, spacious lobby, 66 exam and treatment rooms as well as including three trauma rooms and a pediatric-friendly area


Health Alliance Kingston

PATIENT BUILDINGS RENOVATION SPELLMAN, SMC AND PHARMACY The renovation of two buildings Spellman and SMC as well as the Pharmacy at The NewHealth Alliance Kingston Campus. The two buildings were renovated to be 100% exhaust and addition of Isolation room. The Pharmacy received a complete upgrade of HVAC and plumbing systems.

Health Alliance Hospital Kingston, NY

PIPING, SHEETMETAL, PLUMBING Health Alliance Hospital’s

NEW AND EXPANDED SERVICES As your community hospital and regional health network, WMCHealth and HealthAlliance continue to invest in Kingston and Ulster County by enhancing facilities and improving local access to high-quality medical treatment, advanced technology, and talented specialists. The $113 million HealthAlliance Hospital expansion and enhancement will deliver a technologically advanced and welcoming environment for patients.

Westchester Medical Health Alliance, NY

It will feature: • A new Emergency Department with a behavioral health triage area •A new Family Birth Center with private rooms for birthing mothers •A dvanced cardiac care in our new Cardiac Catheterization Laboratory •N ew advanced critical care capabilities •R efreshed private rooms and a new Caregiver Center •N ew advanced imaging supported by WMCHealth’s partnership with Philips • I npatient psychiatry services (coming in 2023)


Fermi Lab

CRYO MODULE TEST FACILITY (CMTF) BUILDING TITLE II DESIGN - HVAC SYSTEM Commissioned by the U.S. Atomic, Energy Commission in 1967, Fermilab (Fermi National Accelerator Laboratory) has been home to the Tevatron, the world’s most powerful atomic particle accelerator, for more than 20 years. Fermllab Is the premiere national laboratory for physics in America and Is dedicated to working with global partners on pioneering research to transform technologies for science and industry.

Fermi Lab Kane County, IL

Whether it is hiring the top scientists in the world, creating new technologies for research or building new facilities, Fermilab is committed to providing the best facilities in the world to explore particle physics research. The YMI Group was contracted to install the HVAC system for two new buildings at the lab, the Cryo Module Test Facility (CMTF) building and Compressor building. Upon completion, the new buildings conformed to the U.S. Department of Energy’s Guiding Principles for High Performance and Sustainable Buildings.


ARGONNE NATIONAL LABORATORY Argonne National Laboratory is a multidisciplinary science and engineering research center, where talented scientists and engineers work together to answer the biggest questions facing humanity, from how to obtain affordable clean energy to protecting ourselves and our environment. Ever since Argonne was born out of the University of Chicago’s work on the Manhattan Project in the 1940s, the goal has been to make an impact — from the atomic to the human to the global scale.

Argonne National Laboratory DuPage County, IL


Mercy Hospital and Medical Center

BOILER PLANT PROJECT Mercy Hospital and Medical Center, a 150-year old city facility nestled in the heart of Chicago, faced an aging boiler system that was not able to supply the necessary heat output needed on a daily basis to run the hospital efficiently. The YMI Group, Inc. was awarded a contract to completely overhaul the mechanical boiler room located in the sub-basement of the patient tower and replace the original 1960 era boilers with four new state-of-the-art, 750 HP, high-pressure steam boilers.

So how do you overhaul the boiler room of a bustling Chicago hospital and medical center that operates 24 hours a day, 7 days a week and 365 days a year? To ensure minimal interruption to the hospital and its patients, YMI Mechanical used a phased approach to install the new system. Due to the high demand on the hospital and the needs of the patients, two boilers had to be running at all times. Working closely with the Owner, Owners Representative, and the General Contractor, YMI implemented a coordinated team approach allowing for an intricately designed shut down. YMI connected all the steam tie-ins to the existing system, installed blast gates in a new location for the flues and upgraded the existing incoming gas supply from People’s Gas. YMI was able to replace the outdated 196O’s era boilers with four new high-efficiency boilers equipped with Lo-NOx burners that have a 12:1 turn down ratio, all with no noticeable interruption to patient care. Through innovative design and implementation, Mercy’s Central Boiler Plant improvements made by YMI Mechanical qualified and received a substantial rebate to the hospital from the gas utility company.


St. Mary’s Medical Center

CENTRAL EXPANSION PROJECT Having opened In 1973, St. Mary’s Medical Center, located in Hobart, IN, has been meeting the daily needs of its patients for over 40 years. To meet the needs of a growing suburban population, the hospital, in 2013, approved building a new 4-story patient tower to provide additional capacity for patient expansion. The YMI Group was hired in the lead role as General Contractor to provide a turnkey and seamless construction process.

The project had an accelerated build schedule with specific milestone dates. The client issued a “Notice to Proceed” on December 23, 2013. Faced with an extremely tight time frame to carry out the updates, The YMI Group laid out the project into the three phases to be completed over a three month period as follows:

1. P hase one required The YMI Group to ensure all

major piping revisions and structural steel were in place. Completed and running by March 1, 2014, this deadline was achieved with seven days to spare.

2. Phase two involved installation of a new 1,000-

Ton centrifugal chiller, along with all associated electrical switchgear upgrades, electrical infrastructure and BAS controls. Start-up and testing met the milestone completion date of April 15, 2014.

3. Phase three involved installation of a 350 horsepower

boiler and associated piping modifications, electrical infrastructure upgrades, and a new BAS integration. Startup and testing met the milestone completion date.

The addition of the chiller and boiler to the hospital’s central plant allows St. Mary’s the ability to provide additional capacity in efficiently heating and cooling their 4-story patient tower expansion.

Innovation: We embrace innovation and continuously seek

new ways to improve our products, processes, and services.


Collaboration: We foster a collaborative and inclusive work environment, encouraging teamwork and cooperation among our employees.

NEW TRIER HIGH SCHOOL


New Trier High School

UNDERGROUND BLUE DUCT FOR HIGH SCHOOL’S NEW THEATER


Advocate Christ Medical Center

UPGRADE MEDICAL GAS SYSTEM Remove existing carbon dioxide, nitrogen and nitrous oxide manifold and install new carbon dioxide, nitrogen and nitrous oxide manifold. Furnish and install new conduit and wire from Critical power to Med Gas locations, install low voltage cabling through existing conduit from tank farm to Med Gas locations and install low voltage cabling through existing conduit from boiler room to Med Gas locations.

Excellence: We strive for excellence in everything we do,

delivering high-quality products and services to our customers.


John H. Stroger Hospital of Cook County

UPGRADE MEDICAL GAS SYSTEM Replace the existing Medical Vacuum and WAGD System with new systems and manifold upgrades.


Northwestern Medicine Palos South Campus


Northwestern Medicine Palos Health

CENTRAL UTILITY PLANT


University of Chicago Medical Center Hyde Park Campus


University of Chicago Medical Center AdventHealth La Grange

AIR COOLED CHILLER AND DUCTWORK


University of Chicago Smart Museum

AHU REPLACEMENT


Rush Oak Park Hospital

AIR COOLED CHILLER FOR OPERATING ROOM

Customer Focus: We prioritize our customers’ needs and strive to exceed their expectations by providing exceptional service and support.


McCormick Place

COVID-19 ALTERNATIVE CARE FACILITY


Joliet

CHILLER REPLACEMENT


The YMI Group, Inc. was incorporated with Safety, Quality and Service being our main objectives. Everyone at The YMI Group is dedicated to ensure we achieve these requirements every day, without exception. The YMI Group provides sound, professional and cost effective service distinguishing and separating ourselves from the rest. Built on a strong foundation of professional and diverse workforce comprising over 30 years in the construction industry. Performing services in the plan & spec. as well as services in Design Build, Design Assist in the Healthcare, Commercial, Educational, Data Corporate Centers, Hospitality and High Rise Residential market places in the private and public sectors.

AREAS OF EXPERTISE • Hospitals-Operating Rooms, Patient Areas, Central Plant • Medical Office Buildings

SERVICE AND MAINTENANCE The YMI Group, Inc. has a state-of-the-art computer dispatching system to ensure serving you efficiently, accurately and on a timely basis. Our Technicians are qualified

• MRI

to service and maintain the following

• Professional Office Buildings

equipment:

• Laboratories/Clean Rooms

Chillers – Centrifugal and Air-Cooled

• Food Processing Facilities

Cooling Towers

• Plastics Manufacturing • High Tech Industry • Data Centers

• Hot Water & Steam Boilers – Power Burners and Atmospherics •

Pumping

Computer Room

• Educational Facilities

Make-Up Air

• Tenant Construction

Exhaust

• Renovations & Additions

Humidification

Dehumidification

Packaged Heat/Cool

Commercial Refrigeration

Ice Machines

Walk-In Coolers and Freezers

Reach-In Coolers and Freezers

Energy Management and Building Control

• Design/Build • Special Projects (Unique) • Technologies Used: BIM (Building Information Modeling), Trimble


Northwestern Medicine Delnor Cancer Center

ADDITION & RENOVATION


Beacon Health System

COMPLETED HVAC & PLUMBING FOR THE NEW BED TOWER


Swedish Covenant Hospital

FOSTER MEDICAL PAVILION


YMI Fab Shop

Mission Statement: “Our mission is to empower individuals and organizations with innovative solutions that drive growth and success. We are committed to delivering exceptional products and services, fostering a collaborative work environment, and maintaining the highest standards of integrity. Through our dedication to excellence and customer focus, we aim to become a trusted partner for our clients, helping them achieve their goals and maximize their potential.”


COMMITMENT TO

2018

SAFETY 2017

2016

2015

2014

2013


The YMI Group Inc. 2483 Greenleaf Avenue, Elk Grove Village, IL 60007 Ph: (847) 258-4650 • Fax: (866) 519-6172 www.theymigroup.com

Piping | Sheet Metal | Plumbing | Electrical | Refrigeration | Building Automation | Service and Maintenance


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.