PORTFOLIO PROJECTS

Page 1

SELECTED WORKS 2023 ALONSO CASTILLO


CONTACT Phone (+51) 980710935

/

(+39) 3516854985

Email alonsocn9@hotmail.com / alonsocn0912@gmail.com

Web https://issuu.com/alonsocn9/

BIO Graduated from Politecnico di Milano - Italy in the Master program of Building Architecture and from Universidad de Lima-Peru in Architecture belonging to the upper third of bachelor´s degree students. Architectural designer with skills in the elaboration of 3D models and architectural visualization with a special interest in the parametric design and innovative modeling tools. Through the career in architecture has obtained various distinctions in the design studio as well as getting selected works for the annual exhibition of projects of architecture school.

Linkedin www.linkedin.com/in/alonsocn9

Behance www.behance.net/alonsocastillo5

Home 20131 - Milano , Italy


EXPERIENCE 2022 - 2023

ALBAGHUBA

Milan, Italy

Intern Development of the architectural concept for the remodeling of a disused building, and subsequent development of a housing complex at the level of layout and architectural details, 3D modeling and generation of views for marketing.

2020 - Now

L3 STUDIO

Lima , Peru

Architect Personal entrepreneurship of modeling, virtual tours and professional architectural visualization in the field of commercial views and real estate for architecture and real estate offices.

2017 - 2020

METROPOLIS

Lima , Peru

Junior Architect Design of housing complex, commercial projects such as shopping centers and mixed-use buildings, offices and coworking spaces by BIM methodology, realization of commercial views and files of architectural projects at the municipal and construction level.

2016 - 2017 Lima , Peru

SOFTWARE SKILLS AutoCAD

V-ray

Lumion

Photoshop

SketchUp

Revit

3ds Max

Illustrator

Rhinoceros

Grasshopper

Office

Indesign

LANGUAGES SKILLS Spanish (Native Language)| English (written and spoken fluently) Italian (written and spoken at intermediate level)

EDUCATION 2020 - 2023

POLITECNICO DI MILANO

2016 - 2017

UNIVERSITÁ IUAV DI VENEZIA School of Architecture

TO2 ARQUITECTURA Intern

Development of constructive details (Doors, windows, screens, covers,curtain wall and metal structures), Design of metallic facades and curtain wall structures.

Master´s degree in Architecture AUIC

2012 - 2016

UNIVERSIDAD DE LIMA Bachelor´s degree in Architecture School of Architecture


TABLE OF CONTENTS

01

02

03

PASEO COLON STATION

THE MEANDER

RE-BOND

Bachelor´s Degree Final Project

Master´s Degree Project

Master´s Thesis

Transportation hub

Housing complex

Renovation and Expasion Project


04

05

STARTUP HUB

POLIFUNCTIONAL BUILDING

Master´s Degree Project

Bachelor´s Degree Project

Offices building

Mixed use


BRT System

3

PASEO COLON STATION - TRANSPORTATION HUB Prof: Alejandra Acevedo , Andres Carpio , Enrique Santillana , Juan Carlos Arias Time: 2019

3

Site: Lima , Perú

Urban Bus

Type: Transportation Hub Team: Mauricio Ramirez Honors: Project selected for the annual exhibition at Universidad de Lima

5

4

1 4 5 Metro Line

2 3 The city of Lima is starting a transportation reform to get a better connection of the Lima fencing productive areas and the multiple centralities in the periphery. The vision of expansion of the city contemplates the integration of all transportation systems under construction and projected, among which are the 6 metro lines, the BRT, the complementary corridors (Urban buses). It is expected that all these modalities are interconnected at an intermodal point throughout, creating a centrality which aim is to recover its old character as a priority pedestrian route and connection of cultural facilities, all this will create a new space for the city, to benefit exchanges and social interactions. The centrality of the “Civic Center” is the point of arrival and departure from the city center for thousands of citizens, the estimated maximum demand would be up to 445,690 people per day on a horizon by 2050 when the stations operate at maximum capacity and with all other systems working together.

3 2

Vial Ring

2 3



01 | Design Strategies

1. BUILDING SITE

2. PATHS

3. TENSION

4. DELIMITATION

5. RESTORATION

Current situation of the Neptuno park

Generated by daily activities of different intensity , help to create the new network

The fountaine is under tension as a central object, surrounded by the new volumes

The new green areas,meeting spots and entrance volumes to subway are delimited

Tree massing is restored to create an urban forest to manages roads and gathering areas

0

25

50

100


01 | Function

Level

0

Green area Paths Buffer zone

Parking lots

Level

-1

Techincal area Retail area Logistic area Bike parking Emergency scape Parking lots

Level

-2

Techincal area Retail area BRT station Emergency scape

Level

-3

Parking lots Techincal area Vertical circulation core Hall station L2

Level

-4 -5

Parking lots Techincal area Vertical circulation core

Parking lots

Level

-6

Techincal area Vertical circulation core Platform station L2 Emergency scape

Level

-7

Emergency scape Techincal area Vertical circulation core Hall station L3

Level

-8

Emergency scape Techincal area Platform station L3


01 | Urban Hall

5

1

3

2 7 4

6

Legend 1. Urban Hall 2. Art Gallery 3. Parking lots 4. Bike Parking 5. Logistic Area 6. Food Court 7. Technical Area

Underground level -6.40m

0

5

10

20



01 | Sections

Detail

Section A-A

Section B-B

0

5

15

25

50


01 | Details

5

1

2 6

7

3

8

4

Legend 1. Brick Wall 250mm Air Chamber 200mm Concrete Wall 1 m 0

1

3

5

10

2. Concrete Pilar 0.8x 1m Aluminium Cladding

3. Fiberglass Signage 4. Flooring 20mm Screed 50mm Composite Slab 150mm Concrete Foundation 1.5 m

5. Galvanized Steel cladding Steel support for cladding 6. Flooring 20mm Screed 50mm Composite Slab 150mm

7. Steel Cladding colours 8. Concrete Staircase Rubber Edge


Open spaces Green areas Empty ground Site

THE MEANDER - HOUSING COMPLEX Prof: Maurizio Sabini , Andrea Matteo Azzolini

Functions

Time: 2020-2021

Institutions

Site: Chicago, USA

Housing

Type: Mixed use

Mixed use

Team: Irem Topal

Retail

Transportation Main roads

The project addresses the challenges of a vertical city with a horizontal experience that can be enjoyed from different points of view, the focus of the project is the integration of many actors of the city such as the river, the people and the existing infrastructure. The site is composed by one pavilion in the southern entrance, this pavilion concentrates generally free activities related to nature due to is nearness to the riverside, and four buildings with a public basement that consist of two levels of retail space divided onto the ground floor and underground level, on the top of this basement are placed the residential floors. The volumes are aligned with the structure of the city, due to the existence of urban voids the architectural proposal aims to requalify them and include them in the site to give greater value to them however the program considers public and private uses so that the privacy of the users within the housing program is guaranteed. In addition, particular strategies were implemented, such as the presence of work spaces from home as well as multifunctional and independent rooms, which are considered for future situations in a post-covid world.

Secondary roads Pedestrian roads Navigation roads

Heights 16-30 floor 10-15 floor 7-9 floor 4-6 floor 1-3 floor



02 | Strategies

1. BUILDING SITE

2. LANDSCAPE

The site is located in the South Loop district next to river

The riverside is designed following the concept of meander to form a wavy shape

5. EXTRUSION AND EXCAVATION

4. PLATFORMS

The towers are extruded from the surface while the retail space is located in the underground

A big platform connect all the emerging volumes and are aimed to collective purposes

5. PRIVACY

6. VIEWS

Housing program is located in the towers separating it from the public program at ground level

Extruded elements from the facade open visual connection with the different parts of the city

0

5

10

20

30

50


02 | Public Building

1

2

3

4

5 7

8 6

Legend 1. Lobby housing tower 2. Covid- cleaning space 3. Coworking space 4. Study rooms 5. Courtyard 6. Exposition area 7. West entrance 8. East entrance

Ground level 0.00m

0

5

10

20


02 | Section

Longitudinal Section

0

5

10

20

30

50



02 | Plans

Typical floor - Tower A

0

1

5

10

20

Typical floor - Tower B,C,D

0

1

5

10

20


02 | Details Legend 1. Aluminium profile with opaque panel 2. Flooring 20mm

1

Screed 50mm Insulation 80mm Concrete slab 150mm Corrugated metal sheet

Det 1 3

4. Flooring 20mm

5

2

3. Glass Railing

Bearing support

4 6

Screed slope 1% Concrete slab 150mm

7

Corrugated metal sheet 5. Aluminium profile - double glazing 6. Floor edge cladding

8

7. Secondary beam IPE 270 8. Primary beam IPE 550

Detail 1

9. Facade blade system in aluminium mounting rail 90mm 10. Concrete parapet 1000mm Insulation 80mm

Det 2

9

Waterproofing membrane Steel flashing

11 10

12

11. Substrate layer Filtering layer Drainage layer Waterproofing membrane Insulation 80mm Vapour barrier Screed slope

13

Bubble slap 350mm 12. 80/400mm Larch strips on batters Bearing support Waterproofing membrane Screed with slope 1% Insulation 80mm Bubble slap 350mm 13. Flooring 20mm Screed 50mm Insulation 80mm Bubble slap 350mm

Detail 2


RE-BOND - Expansion Project

1910

Prof: Giulio Massimo Barazzetta Time: 2022-2023 Site: Cittá Studi, Milan, Italy Type: Educational building Team: Irem Topal 1949

The site is located in the central axis of the Veterinary campus, the role played by this building is that of the first visual impact and reference element since it is located on the primary road that connects transversally with the other buildings in the campus. The building has been modified over time, increasing its volume, however it has not lost characteristic features such as symmetry and the predominance of mass over void, thus achieving harmony with the other existing buildings. The first stage of the building dates back to 1910 where there is one storey building that served as a peak animal clinic, later on 1949 the first modification is evidenced, the first level of the building is built and the connection to the north with the paddock it is interrupted.

2022

Towards the present the paddock and the lateral connections are demolished, the use of the building changes to be completely educational, it is also noticed that during this period the building has a variation on its materiality ,the north facade shows 4 columns in concrete and in addition some cladding systems in aluminiun were added to this facade. Under this background the future implementation of a new volume of classrooms is evaluated, as well as the expansion in underground to house the program of the research center, also with the refurbishment and improvement of the interior spaces in technological and internal climate comfort terms.

Proposal



03 | Concepts

1. BUILDING SITE

2. DEMOLITION

3. ADDITION

4. EXTENSION

5. EXCAVATION

6. EXTRUSION

7. PROPORTIONS

8. SKYLIGHT

9. FORM FINDING

10. COVER

11. ROOF

12. LANDSCAPE


03 | Master Plan

0

5

10

20

30

50


03 | Plans

1 2

3 1

4

6

5 7

2

8 9

3

Legend

Legend

1. Machine room

1. Aula Grande

2. Atrium

2. Hall / Entrance

3. Computer lab

3. Vertical circulation

4. Wc men

4. Lab

5. Hall

5. Lab

6. Wc women

6. Researcher office

7. Service area

7. Professor office

8. Service area

8. Professor office

9. Vertical circulation

9. Hall / Entrance

4

5

6

8

7

9

10

10.Professor office

Underground level -4.50m

Ground level 0.00m

0

1

5

10



03 | Structure

Upper steel plate Internal structure of canopy Steel support fixed to primary beam Steel profile primary beam Reinforcement for primary beam

Marseille Tile Roof

Wooden truss structure Concrete beam Drywall partitions

PV Glass Steel profile box

Perforated aluminium panel

Hollow brick slab

Existing concrete Column Concrete panel

Folded panel system Glass volume Brick pavement podium

Interior glass partition

Curtain wall

Primary beam HEA 800

Retaining concrete wall by underpinning method in the historic building

Secondary beam IPE 400 Concrete retaining wall

Primary Beam HEA 600 Steel plate anchored Steel Column HEA 400 Primary Beam HEA 800


03 | Details

Legend 1

1 Flooring panel 20mm Adjustable support Screed 50mm Insulation board 7 6

6 5

Reinforced concrete composite slab 130mm 2. Ceramic Tile 20mm

Drainage system

Double glass roof s=2%

Screed 50mm Concrete slab 100mm Vapour barrier Insulation board Waterproof membrane Concrete cast in place Iglu Concrete (magro di apoggio) 3. Crawlspace 300mm

5 4

21

4. Flooring tile 20mm Screed 50mm Existing concrete slab 250mm 5. Aluminium mesh panel Air chamber Composite Insulation board 160mm Fixing bracket Metal plate Primary beam 6. Concrete panel Air chamber Insulation board 40mm Structure supporting cladding system / false ceiling

32

4 3


STARTUP HUB Prof: GianLuca Brunetti, Giacomo Boffi , Marco Scaioni Time: 2020-2021 Site: Cittá Studi, Milan , Italy Type: Office Building

This project was born as a response to a need to promote emerging companies by young university students in the city of Milan, this building is inserted in an unconsolidated area behind the old campus of the Politecnico di Milano. The area is the current Parco pubblico Smerlo , where there is basically urban furniture provided by the Politecnico to be a meeting place for students and the general public, it is an open space surrounded by green areas where it was planned to insert a contemporary building that generates a reference in the general layout of the university campus. the building has a regular shape in plan and is staggered that has 3 levels only in the last stage of the volume, the program is characterized by shared offices , laboratories , a library and in addition to relaxation spaces for users, the project respects the physiognomy of the adjoining buildings since it takes the form of a building with an interior patio and the architectural program is developed around it.



04 | Strategies

Second floor level Training area

1. BUILDING SITE

2. CONNECTION

The site is located in the East side of the citta studi next to the Leonardo campus

The shape of the building opens to create a path that connect the old campus with new facilities

First floor level Coworking Support area Entrance Labs

3. EXTRUSION

4. ENTRANCE

The building block are extruded irregularly aligning facades to the urban heights

The entrance is emphasized by a change in the materiality , being more transluscent Ground floor level Coworking Meeting area Support area Entrance Labs Private Offices

5. FOLDED ROOF

6. LANDSCAPE

Emerges as an element of design, the dynamism provides special character to the building

The main path connect the entrances with the building and the existing campus buildings


04 | Plans

3

4

2 5

1

6

7

8

Legend 1. Lobby 2. Wc 3. Library 4. Conference room 5. Laboratory 6. Coworking space 7. Private offices

Ground level 0.00m

0

2

5

10


04 | Structures

1. Second skin cladded to curtain wall

4

2. Primary beam connections

3

1

3. Truss beam connections

2

4. Roof main structure connection


04 | Details

3

4

1

D1 - Plan detail

Legend D1

5

1. IQ Optima Homogeneous vinyl

Steel stop removable

Waterproof membrane 10mm

Polycarbonite panel

Thermal insulation 20mm

Steel pipe

Concrete slab

Double glazing

Corrugated sheet

Vertical mullion

2. Finishing tiles 6mm

5. Horizontal mullion

Concrete slab 10mm

Tempered glass

Acustic insulation

Thermal insulation

Thermal insulation

Fixing bracket

Waterproof membrane

Primary beam

Light concrete Foundation 3. Corrugated metal sheet 2

6

4. Aluminium cover

Slab covering 20mm

Sloped roof insulation RHEINZINK-ArtColor Ice and water sheet Underlayment Fastener C profile

6. Foam glass insulation Drain channel Soil Geotextile layer Gravel Drain pipe Foundation


POLIFUNCTIONAL BUILDING Prof: Juan Carlos Arias , Fiorella Arispe Time: 2015 Site: Lima, Peru Type: Mixed use

The Polifunctional building looks for a way to complement the district of "Pueblo Libre" through mixed uses that reactivate the environment and connects two areas distanced by the barracks that represents a very strong limit and at the same time that this area obtains a better relationship with the city. The development of this equipment is based on the historical characteristic of "Pueblo Libre", so it is proposed an architecture that does not break the morphology of the district, with elongated volumes and always contemplating an interior square flanked by volumes that put this central space in tension and serve as a platform for various cultural and recreation activities.



05 | Concepts

1 1. CONNECTIVITY

2. VOLUMES

The site is accessible and the new urban environment must articulate collective activities for the users

The mass is distribuited sorrounding an urban core that concentrate all the collective activities

2

3

4

3. PERMEABILITY

4. DYNAMISM

Volumes rise on the ground floor ,generating openings to connect the paths and the central space

The architecture generates the sensation of movement through the displacement of the edges

5

Legend

6

7

1. Lobby housing tower 2. Covid- cleaning space 3. Coworking space 4. Study rooms 5. Courtyard 6. Exposition area 7. West entrance 8. East entrance

5. LANDSCAPE The new landscape desing incorporate strategies to gather user in the same physical space and differenciate activities on it by creating different levels and creating green areas to keep privacy inside the buildings

Ground level 0.00m

0

5

10

20


05 | Public volume

6 5

5

2 3

2

4

10

3

11

1

1

4

9 10

1

2

3 11 7

12 4 13 9

8

14

15

First floor plan 1.Cinema(south) 2.Common hall 3.WC women 4.Wc men 5.Cinema(north) 6.Emergency scape 7.Emergency scape 8.Vertical circulation core 9.Offices lounge area 10.Main circulation 11.Entrance hall 12.Food court 13.Vertical circulation core 14.Wc women 15.Wc men

12 6

7

8

13

6

14

Second floor plan 1.Cinema(south) 2.Common hall 3.WC women 4.Wc men 5.Cinema(north) 6.Vertical circulation core 7.Lounge 8.Coworking space 9.Main circulation 10.Vertical cirulation core 12.Vertical circulation core 13.Wc women 14.Wc men

7 8

5 9

Thirth floor plan 1.Hotel Lounge area 2.Vertical circulation core 3.Hotel single rooms 4.Main stair 5.Vertical circulation core 6.Kitchen /cafe 7.Reception 8.Seating area 9.Sky lounge

0

5

10

15

30

50


05 | Structure


05 | Views


A LO N S O C A S T I L LO N AVA R R O


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.