Extend Transformer Life Maximize Capacity Reduce Maintenance with
Transformer 67 Years of Power & Process Measurements
REPLACE UNRELIABLE ANALOG GAUGES
Winding 39 째 C Ambient 17 째 C
Liquid 44 째 C Load 31 MVA
ELECTRONIC TEMPERATURE MONITOR
• • • •
More precise measurements Smart control Remote monitoring Multiple channels
Retrofit an Existing Transformer
Install on a New Transformer
Replace Several Analog Gauges
Control Multiple Cooling Stages
Proven by Years of Field Experience
Used by OEM’s Worldwide
Install on Transformer
or in a Control Cabinet
Multiple Units for Additional Channels or Redundant Control
Models and Options to Fit Your Application • Calculated Winding Models (IEEE method) • Simulated Winding Models (heated well) • Load Tap Changer Monitors