B’
A’
CONTACT
A
ANDRÉ GATIEN ANDRE.GATIEN@YAHOO.CA (514) 931-8923
B
_technorythme 1
0
3
2
15
5
4
6
30 m
20
3979 NEWMARCH VERDUN, MONTRÉAL, QC H4G 1G9 NOTE : UNLESS OTHERWISE SPECIFIED, I PRODUCED ALL PLANS, RENDERINGS AND DRAWINGS PRESENT IN THIS DOCUMENT.
RURAL MASTERPLANNING
LA LÉGENDE MONT-TREMBLANT, QC
Collaborator : CATHERINE RIOUX A masterplanned community development situated in the ski resort town of Mont-Tremblant, Québec. Manitonga Soutana “La Légende” is a 1.4 million square meter property comprising 95 highly luxurious residences with an estimated value of over 300 million dollars. The objective was to preserve fully 80% of the site in it’s current state, create and preserve connections to the surrounding national park and protect local faunae and florae. The end product had to be invisible from the surrounding countryside because it is situated on the slopes of Mont-Tremblant, the highest mountain in the area as well as the driving element of the local economy. The residences all conform to a LEED-inspired building code and the road infrastructure was reduced to a minimum, in this case, between 4 and 5 m in total width (two lanes), thereby reducing traffic speeds. Every single home was located with the help
Bandes riveraines ministérielles
Bandes riveraines municipales
Zone peu utilisée par le cerf
Zones abri et abri-nourriture
Milieux humides et cours d’eau banDeS riveraineS MiniStérieLLeS
à éviter Pentes de 30% et plus
of detailed laser topographic maps and GPS markers from on-site visits. The sites were selected to reduce ecological and visual impact while at the same time maximizing real-estate value. Displacement corridors were preserved to allow deer and other animals access to the 1.2 million square meters of forest within the site and to the immense national park surrounding the site on three sides. Several GIS databases were used to determine the most sensitive areas of the property as well as areas where roads and homes could be built at minimum impact.
URBAN MASTERPLANNING
NUNTIP MONTRÉAL, QC
Collaborators: CHRISTIAN DUCHARME, DAVID POULIOT NunTip is the final phase of the development of Nun’s Island, being the last available undevelopped land. A commercial street, waterfront park connected to the regional bicycle network as well as housing are all planned for the area. The most prominent feature of the development is the public park located at the end of the commercial street and plaza.
RURAL MASTERPLANNING
LAC-EN-CIEL MONT-TREMBLANT, QC
Collaborators : IBI/DAA URBAN DESIGN DEPARTMENT Lac-en-Ciel is a development project located in the Mont-Tremblant area. The project consisted of determining ideal locations for homes, roads, amenities and parks. Custom furniture, docks, signage and lighting was developped in order to give the project a distinct identity. The project was marketed to europeans and americans and this was reflected in the rustic but clean design guidelines for the different elements of the project. The faunae and flaura being the most important touristic appeal, it was important to enhance and work with nature.
SUDBURY DEVELOPMENT SUDBURY, ON
NUMBER OF LOTS: 124 Single family unit = 81 Row dwelling residential = 10 Multiple dwelling - condos = 29 High rise = 4
Collaborator : SERGE GALLANT LEGEND Single family unit Row dwelling residential Multiple dwelling - condos High Rise Park, approx Lot line Thoroughfare road
NOTE Not for construction. Conceptual plan only.
MASTER PLAN - NUMBER OF LOTS SCALE 1:2000
S.E.N.C.
The mandate was to develop a masterplan for a suburban vacant lot on which the client wished to build residential units at the highest density permitted by zoning while adhering to all municipal regulations and bylaws.
N
SUBURBAN MASTERPLANNING
MASTERPLAN
PRESENTATION DOCUMENT - JUNE 2010 SILVER HILLS DEVELOPMENT - SOUTH LANDS
DARTMOUTH, NS
Collaborator : SIMON PÉLOQUIN Dartmouth Crossing is a residential development project near Halifax. The specifications for the project required high density and central public spaces accessible by pedestrian networks throughout the project. The site was challenging due to it being enclosed by highways and cliffs as well as the abrupt topography of the region.
master plan
18
8
18
20
18
18
12
18
16
20
14 6
10
10
15 18
12
12 18
20
mouth_doc_Master-Plan_v03_2010-07-14.indd
SUBURBAN MASTERPLANNING
DARTMOUTH CROSSING
URBAN MASTERPLANNING
RETISSAGE MONTRÉAL, QC
Collaborator : SERGE GALLANT, FLORIAN VILAIN A study in urban renewal and community masterplanning. We chose to reinvigorate a currently neglected urban industrial site we identified as a rupture in the surrounding urban fabric and proceeded with a resewing of the city. The site, centered around the VanHorne overpass is sandwiched between two neighbourhoods known for their artistic communities. Reimagining this abandoned urban landscape was the objective. Therefore, we created green spaces, changed the grain of the urban fabric to better suit the human scale and considered cross-city transportation as well as a multitude of other factors. A full report detailing zoning and land use as well as a development strategy was also produced.
2 3
New Buildings
1 New Green Spaces
City Renewal Plan
TERREBONNE, QC
DATE D'IMPRESSION DU FICHIER -27 janvier 2011 07:53:14
DATE D'IMPRESSION DU FICHIER 27 - janvier 2011 07:53:14
OUIMET-GASCON STREAM
Client
Ville de Terrebonne
PLANTATIONS RIVERAINES
PISTE CYCLABLE
PLAN CLÉ
RIVE EN PIERRE DE RIVIÈRE
LP
N
PROFIL DE SOL PROPOSÉ 0,500
RUISSEAU 0,500 PIERRE NATURELLE 20,6
Collaborator : FRÉDÉRIC DÉOM, HÉLÈNE CRAUSTE
PENTE
G
PENTE
1
1,0
2.8
2,5
1,0
4,5
COUPE TYPE - 0+730,00
1
Notes générales :
3.65
1.
Variable
ÉCHELLE 1:150
Ce document ne doit pas être utilisé à des fins de soumission ou de construction
2.
Avant de commencer tout travail, l'entrepreneur devra:
2,500
2.1.
PALFEUILLE
Vérifier toutes les dimensions des dessins, les niveaux et les conditions existantes sur le chantier. Avertir aussitôt le directeur de toute erreur et/ou omission. Avant de creuser, appeler INFO-TRAVAUX : 286-9228
2.2. 2.3.
02
0,500
ENROCHEMENT DU CÔTÉ EXTÉRIEUR DES COURBES
Aménagement du ruisseau Ouimet-Gascon
Titre du dessin
Détails Coupes et détails
03
----
Approuvé par 1:150 0
1.5
3
6
9m
Date 14 Décembre 2010
MAADI Group Inc., tout droit réservé 2011
Projet
Fichier DAO
10201
PASSERELLE
03
ÉCHELLE 1:50
10201-L-PP-601-R00-COUPES.DWG
Feuille no.
Révision
AP-602
01
Ville de Terrebonne
PLAN CLÉ N
SENTIER SUR PONCEAU EXISTANT
3.
0+000
PLAN DE NIVELLEMENT
0
10
40
60m
0+10 0
1.
C
4.
Les pentes, travaux autorisés en fonction des pentes et stabilité du sol sont tirés d'études préparées par Groupe Qualitas inc. Dossiers : G09298-3D-rap-1, G09298-1D-rap-1-rév.1, G09298-4D-rap-1, G09298-3D-Rap-1-rév.1, G09298-D-rap-1-rév.1.
PH
F AP 600
0+ 77 4
Les données géographiques, topographiques et cadastrales sont tirées de plans préparés par Meunier, Fournier, Bernard McClish inc. Arpenteurs - Géomètres. Minutes : 2381, 2382, 2309, 2743, 2746 .
A
0 75
G AP 601
SECTION DU COURS D'EAU AVEC SEUILS
Ce plan constitue, à titre d'instrument de travail, la propriété de l'architecte et ne peut être reproduit sans son autorisation. Toutes les idées et informations apparaissant sur ce dessin sont réservées à l'usage exclusif de ce projet et ne peuvent être utilisées à d'autre fin sans la permission écrite de l'architecte.
PISTE CYCLABLE EXISTANTE PISTE CYCLABLE PROPOSÉE 1:1000
PLAN GÉNÉRAL DE DESCRIPTION DES TRAVAUX
Ce dessin ne pourra être utilisé pour la construction qu'après avoir été émis pour construction et scellé et signé par l'architecte.
3.
AP 600
0+
Vérifier toutes les dimensions des dessins, les niveaux et les conditions existantes sur le chantier. Avertir aussitôt le directeur de toute erreur et/ou omission. Avant de creuser, appeler INFO-TRAVAUX : 286-9228
2.3.
AP 600
Les pentes, travaux autorisés en fonction des pentes et stabilité du sol sont tirés d'études préparées par Groupe Qualitas inc. Dossiers : G09298-3D-rap-1, G09298-1D-rap-1-rév.1, G09298-4D-rap-1, G09298-3D-Rap-1-rév.1, G09298-D-rap-1-rév.1.
Avant de commencer tout travail, l'entrepreneur devra:
2.2. LIMITE DE SECTEUR
0 70 0+
Les dimensions ne doivent pas être mesurées directement sur ce dessin L'entrepreneur doit vérifier toutes les dimensions ainsi que les conditions de chantier. Toutes erreurs et omissions devront être signalées à l'architecte.
Ce document ne doit pas être utilisé à des fins de soumission ou de construction
2.
B AP 600
0+500
LIMITE DE PROPRIÉTÉ
20
0+200
2.1.
0+55 0
Ce plan constitue, à titre d'instrument de travail, la propriété de l'architecte et ne peut être reproduit sans son autorisation. Toutes les idées et informations apparaissant sur ce dessin sont réservées à l'usage exclusif de ce projet et ne peuvent être utilisées à d'autre fin sans la permission écrite de l'architecte.
1:1000
0+250
0 0+45
Les données géographiques, topographiques et cadastrales sont tirées de plans préparés par Meunier, Fournier, Bernard McClish inc. Arpenteurs - Géomètres. Minutes : 2381, 2382, 2309, 2743, 2746 .
4.
F AP 600
PISTE CYCLABLE EXISTANTE PISTE CYCLABLE PROPOSÉE
0+150
0+300
50 0+0
50 0+0
LIMITE DE SECTEUR
0+500
0+350
00 0+4
0+600
0+650
LIMITE DE SECTEUR
Notes générales : DE ITE R LIM TEU SEC
E AP 600
Vérifier toutes les dimensions des dessins, les niveaux et les conditions existantes sur le chantier. Avertir aussitôt le directeur de toute erreur et/ou omission. Avant de creuser, appeler INFO-TRAVAUX : 286-9228
0+000
Avant de commencer tout travail, l'entrepreneur devra:
2.3.
AP 600
0+ 77 4
Frédéric Déom
Conçu par
Échelle
DE R EU
Ce document ne doit pas être utilisé à des fins de soumission ou de construction
2.
2.2. B AP 600
LIMITE DE PROPRIÉTÉ G
André Gatien, Hélène Crauste
Dessiné par
AP 602
Client
LIMITE SECTE DE UR
1.
A
AP 601
Révision
Groupe IBI / DAA Inc. 460, rue McGill Montréal QC H2Y 2H2 Tél 514 954 5300 Téléc 514 954 5345
ITE LIM CT SE
DE R EU
0+10 0
C
0 75
01 00
Description
D
0+200
AP 600
0+
Date
Sceau
SEUIL FRANCHISSABLE - VUE TYPE
ÉCHELLE 1:25
Projet
AP 600
0+150 0+250
0 0+45
0 70 0+
01
LOCALISATION DU FICHIER - J:\10201_TERREBFAUNIQ\5.0 PHASE DE CONCEPTION\5.9 DESSINS\59LSC\FEUILLET\10201-L-PP-601-R00-COUPES.DWG
LOCALISATION DU FICHIER - J:\10201_TERREBFAUNIQ\5.0 PHASE DE CONCEPTION\5.9 DESSINS\59LSC\FEUILLET\10201-L-PP-601-R00-COUPES.DWG
CROQUIS GÉNÉRAL PRÉLIMINAIRE 1 PONT ALUMINIUM 12000 mm (40') LONG DESSIN FINAL À REVISER AVEC INGÉNIEUR
LIMITE DE SECTEUR
0+300
2.1.
0+55 0
11-01-27 ÉMIS POUR APPROBATION 10-12-16 ÉMIS POUR APPROBATION
1,000
Notes générales :
0+350
00 0+4
03 AP 602 1,000
D AP 600
DE ITE R LIM TEU SEC
E
Les dimensions ne doivent pas être mesurées directement sur ce dessin L'entrepreneur doit vérifier toutes les dimensions ainsi que les conditions de chantier. Toutes erreurs et omissions devront être signalées à l'architecte.
SOL NON REMANIÉ OU REMBLAI
DATE D'IMPRESSION DU FICHIER -27 janvier 2011 07:53:29
N
AP 600
Les pentes, travaux autorisés en fonction des pentes et stabilité du sol sont tirés d'études préparées par Groupe Qualitas inc. Dossiers : G09298-3D-rap-1, G09298-1D-rap-1-rév.1, G09298-4D-rap-1, G09298-3D-Rap-1-rév.1, G09298-D-rap-1-rév.1.
Ce plan constitue, à titre d'instrument de travail, la propriété de l'architecte et ne peut être reproduit sans son autorisation. Toutes les idées et informations apparaissant sur ce dessin sont réservées à l'usage exclusif de ce projet et ne peuvent être utilisées à d'autre fin sans la permission écrite de l'architecte.
TERREAU DE PLANTATION
ÉCHELLE 1:25
DATE D'IMPRESSION DU FICHIER 27 - janvier 2011 07:53:29
DATE D'IMPRESSION DU FICHIER -27 janvier 2011 07:53:25
DATE D'IMPRESSION DU FICHIER 27 - janvier 2011 07:53:25
PLAN CLÉ
0+600
Les données géographiques, topographiques et cadastrales sont tirées de plans préparés par Meunier, Fournier, Bernard McClish inc. Arpenteurs - Géomètres. Minutes : 2381, 2382, 2309, 2743, 2746 .
4.
Ce dessin ne pourra être utilisé pour la construction qu'après avoir été émis pour construction et scellé et signé par l'architecte.
The project consisted of analysing the problematic areas, determining a new path for the stream, changing it’s elevation, stabilisation and renaturalisation. All of the work was coordinated with the MDDEP (Department of Environment)
Ville de Terrebonne
LIMITE SECTE DE UR
3.
DESSUS DE L'EAU
RUISSEAU- COUPE TYPE
03
Client
0+650
RIVE EN PIERRE DE RIVIÈRE
0,500
The Ouimet-Gascon Stream was rendered unstable, biologically dead and unisghtly by poor city planning and lack of municipal supervision that led to the developer infilling parts of the stream and leveling all of the surrounding areas in order to build homes. Many of the homes were too close to unstable slopes, leading to landslides and reduced drainage capacity.
ITE LIM CT SE
0
10
20
40
60m
Les dimensions ne doivent pas être mesurées directement sur ce dessin L'entrepreneur doit vérifier toutes les dimensions ainsi que les conditions de chantier. Toutes erreurs et omissions devront être signalées à l'architecte. Ce dessin ne pourra être utilisé pour la construction qu'après avoir été émis pour construction et scellé et signé par l'architecte.
Légende Lit du ruisseau Rives en pierre de rivière Gazon en plaques
11-01-27 ÉMIS POUR APPROBATION
01
Ensemencement à l'intérieur de la bande riveraine
10-12-16 ÉMIS POUR APPROBATION
00
Date
Description
11-01-27 ÉMIS POUR APPROBATION Date
SECTEUR CENTRE
34
André Gatien, Hélène Crauste
Conçu par
Frédéric Déom
Approuvé par
----
Échelle Date
LIMITE DE PROPRIÉTÉ
14 Décembre 2010
PISTE CYCLABLE EXISTANTE
Projet
PISTE CYCLABLE PROPOSÉE
PLAN DE PLANTATION
Fichier DAO
10201 1:1250 0
Feuille no. 12.5
25
50
75m
AP-401
10201-L-PP-401-R00-NIV.DWG
Révision
01
Rue Plaisance
31 30 29 28
31
Profil du sol existant 15m à droite de l'axe central du ruisseau proposé. (ORGANGE)
26
29 28
-6.00%
22
-0.52%
21
-0.52%
Aménagement du ruisseau Ouimet-Gascon
23
-0.98%
22
Profil proposé du lit du ruisseau
Titre du dessin
21
Description des Travaux Plan général de description des travaux Profil du ruisseau
20 18 Seuils franchissables. 3m x 15cm. Voir détail.
19
19 18
-0.90% -0.12%
17 16
16 15 0+775
Projet
26 24
-0.72%
-6.00%
0% -6.0
20
27 25
-0.52%
-0.28%
24 23
18
Groupe IBI / DAA Inc. 460, rue McGill Montréal QC H2Y 2H2 Tél 514 954 5300 Téléc 514 954 5345
30
Profil du sol existant le long de l'axe central du ruisseau. Note : Le relevé ne contient pas le niveau du lit du ruisseau existant. Lorsque l'axe central du ruisseau proposé traverse le ruisseau existant, c'est le niveau existant de l'eau qui est indiqué et non pas le niveau du lit existant.
27 25
17
33 32
0+750
0+700
0+650
0+600
0+550
0+500
0+450
0+400
0+350
0+300
0+250
0+200
0+150
0+100
0+050
0+000
Dessiné par
André Gatien, Hélène Crauste
Conçu par
Frédéric Déom
Approuvé par
----
Échelle
Axe - Ruisseau Proposé Date 14 Décembre 2010 Projet
Fichier DAO
10201 1:1250
PROFIL DU RUISSEAU
0
Feuille no. 12.5
25
50
75m
AP-400
10201-L-PP-400-R00-NIV.DWG
Révision
01
LOCALISATION DU FICHIER - J:\10201_TERREBFAUNIQ\5.0 PHASE DE CONCEPTION\5.9 DESSINS\59LSC\FEUILLET\10201-L-PP-400-R00-NIV.DWG
Dessiné par
LOCALISATION DU FICHIER - J:\10201_TERREBFAUNIQ\5.0 PHASE DE CONCEPTION\5.9 DESSINS\59LSC\FEUILLET\10201-L-PP-400-R00-NIV.DWG
DE R EU
ITE LIM CT SE
Titre du dessin
Description des Travaux Plan de nivellement Plan de plantation
LIMITE DE SECTEUR
LOCALISATION DU FICHIER - J:\10201_TERREBFAUNIQ\5.0 PHASE DE CONCEPTION\5.9 DESSINS\59LSC\FEUILLET\10201-L-PP-401-R00-NIV.DWG
Groupe IBI / DAA Inc. 460, rue McGill Montréal QC H2Y 2H2 Tél 514 954 5300 Téléc 514 954 5345
Projet
Aménagement du ruisseau Ouimet-Gascon
Profil du sol existant le long de l'axe central du ruisseau. Note : Le relevé ne contient pas le niveau du lit du ruisseau existant. Lorsque l'axe central du ruisseau proposé traverse le ruisseau existant, c'est le niveau existant de l'eau qui est indiqué et non pas le niveau du lit existant.
Profil du sol existant 15m à gauche de l'axe central du ruisseau proposé. (ROUGE)
32
DE ITE R LIM TEU SEC
Révision
SECTEUR NORD
34 33
LIMITE SECTE DE UR
00
Description
Sceau SECTEUR SUD
Arbre / Arbuste
LIMITE DE SECTEUR
01
10-12-16 ÉMIS POUR APPROBATION
Révision
Sceau
Ensemencement à l'extérieur de la bande riveraine
LOCALISATION DU FICHIER - J:\10201_TERREBFAUNIQ\5.0 PHASE DE CONCEPTION\5.9 DESSINS\59LSC\FEUILLET\10201-L-PP-401-R00-NIV.DWG
REHABILITATION
AP 602
“E” LAKE PARK
SAINT-LAURENT, MONTRÉAL, QC
LÉG
Collaborator : RENÉ PERREAULT, FRÉDÉRIC DÉOM
01
DÉTAI NUMÉ PLANC
GAZON VOIR D
“E” Lake Park is a nearly 3 million dollar park built around a retention basin disguised as a lake/pond. Water is recirculated through the lake and filtered mechanically and chemically by a sediment berm covered with specially selected vegetation. The park features a 35 meter self supporting bridge and is scheduled for completion in spring of 2013.
PAVÉ VOIR D DÉTAI
CRIBL VOIR D
CRIBL VOIR D
PIERR VOIR D
LIT DE VOIR P
FIBRE VOIR D
DALLE VOIR D
ASPHA VOIR P
BÉTON VOIR P
The mandate included coordination and site supervision of landscape architecture, civil, electric, structural and mechanical engineering.
FOSSE VOIR P
06 603
03
Béton couleur Silver Diamond (BL3212R, 1 sac) de la compagnie Interstar ou équivalent approuvé
601
09
03 605
PIS
TE
600
04 605
03
01
C
YC
LA
BL
E
602
603
02
03
602
601
602
603
09 600
06 606
LIMITE TE
MU
LT
605
IF
ON
CTI
ON
LL
E
I IGLI
PISTE MULTIFONCTIONNELLE
OD
PISTE MULTIFONCTIONNELLE
SENTIER
ÉO -M
.00
37
.50
IER
0
0
0
39.0
39.5
40.0
NT SE
.50
39
0
0
0
UR
UX
E
AIR
600
TS
AN
0
35.0
0
35.5
0
36.0
0
603
36.5
02
A
602
0
600
37.0
03 01
600 602
37.5
02 01
38.0
6
601
07
Béton couleur Silver Diamond (BL3212R, 1 sac) de la compagnie Interstar ou équivalent approuvé
38.5
605
.00
39
Béton des murs de soutènement couleur Moonsoon (NR5157R, 2 sac) de la compagnie Interstar ou équivalent approuvé.
01
.50
AM ÉD
605
602
.50
RU E
06
04
Béton couleur Sedona (JO-6435R, 2 sac) de la compagnie Interstar ou équivalent approuvé.
BELVÉDÈRE
38
601
LAMPA
PIS
.00 38
02
605
601
36
601
03
RUE DES OUTARDES
AN
602
07
601
06
LAMPA VOIR D ET ING
NE
05
6
05
B
02
01
502
Béton couleur Silver Diamond (BL3212R, 1 sac) de la compagnie Interstar ou équivalent approuvé
BANC, VOIR D DÉTAI
SEPT PIERRES GRANITIQUES COULEUR GRISE SERVANT DE BANC INSTALLÉES DEVANT LA SCÈNE, DIMENSIONS (600mm X 600mm X 600mm). LES PIERRES SERONT DÉPOSÉES DIRECTEMENT SUR LA MEMBRANE DE L'AIRE DE JEUX. STABILISER LA PIERRE AVANT DE METTRE LA FIBRE DE CÈDRE DANS L'AIRE DE JEUX, VOIR DEVIS.
RUE DE L'ÉQUATEUR
01
605
RUE DES MIGRATIONS
RUE DES PALMIPÈDES
PANIE VOIR D DÉTAI
37
DESIGN / BUILD
604
DE
F EN
PO
605
IER
SENTIER
BELVÉDÈRE
33.00
SENTIER
33.50 34.00
601
Béton couleur Silver Diamond (BL3212R, 1 sac) de la compagnie Interstar ou équivalent approuvé
011 200
01 200
011 200
09 601
LÉGENDE:
10 200
011 200
02
05
200
200
011
011
200
200
15 01
11
601
601
08 601
03
10 601
03 601
01
04
02
05
03
06
604
604
200
011 200
601
Béton couleur Silver Diamond (BL3212R, 1 sac) de la compagnie Interstar ou équivalent approuvé
SENT
31.50 32.00 32.50
08
JE
605
06
605
602
SENTIER
29.00
05
05 06
1
ZONE GLOBALE DE CHANGEMENTS. SE RÉFÉRER AUX DIFFÉRENTS PLANS POUR LE DÉTAILLÉ DES MODIFICATIONS .
604
604
604
604
01 601
RUE DES ANDES
011 200
09
08
06
200
200
200
011
011
011
200
200
200
02 605
04
07
011
011
200
200
200
200
02 601
05 601
10
605
11 605
14
13
09
605
605
08 605
605
16 605
605
12 605
1
B’
A’
A
B
_technorythme 1
0
3
2
15
5
4
6
30 m
20