CONTENT 1. Acknowledgement 2. Introduction 2.1 Company Profile 2.2 Organization Chart 3. Weekly Log Sheet 4. Projects / Tasks 4.1 Project 1: Evolve Mall 4.2 Project 2: Cheras Service Apartment 4.3 Project 3: Dark & Twisted 4.4 Project 4: F.O.S 5. Conclusion
Â
ACKNOWLEDGEMENT
I would like to express my gratitude to my supervisor, Ar. Ari Methi who has given me the chance and opportunity to work in this company during my two-month duration of internship. Under his guidance and supervision, I have broadened my understanding of how does an architecture firm works in real life.
Besides that, I would like to give my appreciation to my colleagues who have spent their time and effort to teach and guide me throughout the time that I have been here. They have been knowledgeable in their field and did not hesitate to share them with me.
Lastly, my utmost appreciation to the lecturers and staffs in Taylor’s Lakeside, especially my tutor, Ms. Indrani who has aided us in internship report writing and also teaching us to prepared ourselves for future working in a company.
Â
INTRODUCTION 2.1 Company Profile Arkitek Ari Methi is a sole proprietorship company that locates in Bangsar, Kuala Lumpur. It provides the service of architecture and interior consultancy to their clients of various building and interior designs to achieve the high quality standard of living spaces. The core value of this company is fozcusing on the little details on every project because the little things matter. The working loads are usually distributed evenly among employees according to their specialties. Employees may be able to get involved in different areas to be from schematic design to contract administration to project management so that more exposures are allowed.
2.2 Organization Chart
Project Titles Project 1: Evolve Mall
/
LOG SHEET.WEEK
1
Building By-law, Set Fire escape requirement
<t:
J to location,building
finishes, fittings and te or co-ordinate
with consultants lEstablish requirements for, and , consultants, product suppliers
Total:
9.5
9.0
8.5
11.0
8.5
0.U
4t
NOTE: You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3"..1 .5, 2.5, 3.5... etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
Remark
ARC2625 Log Sheet-WK1
ry^*, Page 11
OG SHEET.WEEK 2
7
NOTE: You might involve muitiple projects per week, record the project details accordingly (top of this Log Sheet) Recordyourhour/hoursinthe'greybox'.Examples0.5, 1,2,3.. 1.5,2.5,3.5. etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file Lunch Break & Chinese New Year break should be excluded from this Log Sheets file Public Holiday (PH) A vaiid reason
ARC2625 Log Sheet-WK2
SHEET -WEEK 3
Total:
11.0
NOTE:
You might involve multiple projects per week, record the proJect details accordingly (top of this Log Sheet)
1,2,3...1
Recordyourhour/hoursinthe'greybox'.Examples0.5,
5,2.5,3.5
etc
You might involve multiple stages per day. record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you
I weeks should be !'ecorded all in the I Log Sneets tab prepared in this file Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) Each Log Sheet per week, total
Remark:
Ebsence on 21st Jan due to sict ness
L
--
ARC2625 Log Sheet-WK3
Page 11
SHEET.WEEK 4
d: Building By-law, Set Fire escape requirement
Total:
0.0
8.5
8.5
a<
9.0
0.0
34.5
NqIE: You might involve multaple projects per week. record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box' Examples 0 5. 1 ,2.3. .1 5. 2 5, 3 etc
5
You might involve multiple stages per day, record the hour/hours accordingly Oo nol !'ecord Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file Lunch Break & Chinese New Year break should be excluded from this Log Sheets file Public Holiday (PH) A valid reason or exolanatron is reourre for anv dav of absence. Dlease write rn the remark'blank below
Remark:
'..*-q-ARC2625 Log Sheet-WK4
Page 11
SHEET.WEEK
rt. Building BY-law Set Fire escape requiremenl
Total
uu
(top of this Loq Sheet) per week' record the prolect details accordingly You mighl involve multiple prolects etc 5' 25' N9-TE
Recordyourhourlhoursinthe'greybox'
Examples05' 1'2'
3
1
per-dav' **|"1ll:,T::loLrrs You might !nvolve multiple stages if is not applicable to,yotr oo-not i"coro Saturday and Sunday
35
accordinsrv
(PH) :il"r$i:,::'""T:#H:[?":i:;::',#;"';#:]i:,1""i'":'"::::ii:'Ji;r;:;,Hf this Los sheets rire Pubric Hotidav ::::.T:":Hffl;""1J'i::'"ffi;;;;;";"d rrom.i^5co in the'remark'blank belgvt^/rito
r
,/\\*{A \
Page
ARC2625 Log Sheet-WK5
1 1
LOG SHEET.WEEK 7
TOTAI:
6.5
U.5
Y.U
'IU.U
U.U
U.U
JI
NOTE:
you might invotve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hourihours in the 'grey box'. Examples 0.5, 1,2' 3...1.5' 2.5' 3 5 'etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total I weeks should be recorded all in the 8 Log Sheets tab prepared in this file Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
ARC2625 Log Sheet-WKl
Page
11
\ SHEET.WEEK 8
I
(t: Building By-law, Set Fire escaPe requirement
Total:
lUU
l4c
ou
oil
NQTE.
YoUmighllnvolvemullipleprolectsperweek,recordtheprojectdetailsaccordingly(topofthlsLogSheet) etc Recordyourhour/hoursInthe'greybox' Examples05 1,2,3 1 5 25' 35 You might involve multipie stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to yollr
EachLogsheetperweek.tota|8weeksshouldberecordedallintheELogsheetstabpreparedinthlsfile
file Public Holiday (PH) Lunch Break & chinese New Year break should be excluded from this Log Sheets 'blank below in the
ARC2625 Log Sheet-WK8
N
Page 11
PROJECTS/TASKS Project 1: Evolve Mall
Fig 1: The entrance of Evolve Mall
• Location: Ara Damansara, Petaling Jaya • Status: Final stage of construction • Skills learnt: Contract Documentation
On the first week of internship, I have been appointed to follow my senior, Adele to Evolve Mall and learn how project management works. During the time, there are many defects and requirements that need to be amended in the mall. Thus, my first task was to sketch out solutions for the areas that need attention.
Â
During my time being in project management, I was lucky enough to be involved in the site meeting on the 11th January of 2016 regarding the process of construction in the mall.
Fig 2: Example of solution proposed in sketches
Fig 3: Final solution approved drawn in sketches
Â
After that, I get to handle lists on different categories such as defects, outstanding and enhancements that I observed on site. After checking on the mall, I gather the information and reorganized them into different checklists to be sent to respective parties to either fixed the defects or making it better.
Fig 4: List of defects discovered on site
Later on, I aided another of my senior, Yoong in drawing out proper drawings of the sticker placement on demising pier and bulkhead for the contractorsâ&#x20AC;&#x2122; better understanding. In this case, I have used Adobe Illustrator to align the sticker accordingly as these graphics are going to be printed out and stick on the demising pier and bulkhead on site
Â
20 (CH: 3050 mm)
(CH: 3050 mm)
LG
01B
20
(Blow Up)
100
LG
01A 135
(Blow Up)
LG
01B
Sticker Font : Century Gothic Bold Size : 35mm ht Color : t.b.c
100 100 mm thk demising pier
135
LG
01A PT 1 wall paint
(Floor Finish)
Internal Signage Demising Pier Icons
TD:IS/DP/01
Fig 5: Setting out for demising pier
(Ceiling Finish)
LG 06 (Blow Up)
200 mm thk bulkhead
100
PT 1 wall paint
LG 06
200
50
(Blow Up) Sticker Font : Century Gothic Bold Size : 35mm ht Color : t.b.c
Internal Signage Bulkhead Icons
Fig 6: Setting out for bulkhead
TD:IS/DP/01
Â
Furthermore, I was assigned to design the direction stickers that will be paste on the columns for visitors in the mall to understand the location of important places, such as concierge, washroom, ATM and other more.
WF9.1
WF5
P A Y
A T M
A T M
P A Y
A T M
WF15
WF8 A T M
A T M
A T M
Fig 7: Wayfinding signage on mall
Fig 8: Location of stickers to be paste on which column
A T M
Â
Fig 9: Clearer indication of stickersâ&#x20AC;&#x2122; placement
Fig 10: Example of design for column stickers
Â
Not only was I involved with tasks within the mall, I was to assist me seniors in proposing an exterior signage to be place outside so that passerby will notice the new constructed mall and attract more visitors.
Fig 11: Location of external signage to be placed
Fig 12: Details on how to set up the external signage
Project 2: Cheras Service Apartment
Fig 13: Initial plan
• Location: Cheras, Kuala Lumpur • Status: First stage, Design approved • Skills learnt: Schematic Design
When I was done with my tasks in Evolve mall, I was later on followed under the guidance of another senior, Hoi Yee to design and cad out the plan of the service apartment. On each floor, the apartment consists of 4 types of units: Unit 1A, Unit 1B, Unit 2A, and Unit 2B. Each of the units have their own benefits and obstacles in designing as to enhance their advantages and following the requirements by the authorities.
Fig 14: Progressing plan
Project 3: Dark & Twisted • Location: Shoplot in Evolve Mall • Status: Designing stage • Skills learnt: Schematic Design, Contract Documentation
In this project, I got the chance to be exposed into the interior designing field. Under the aid of the interior designer, Tessa, in the office, I have learnt more details stuff focusing on furniture in comparison to larger buildings. The project was being passed on to me to complete the photoshop of restaurant’s front perspective. This is to let the contractors have a deeper image of how will we want the restaurant to look like.
Fig 15: Front perspective of restaurant
Â
Fig 16: Back perspective of restaurant
When I have completed the Photoshop stage, I was then in charge of the details part of the restaurant whereas another colleague of mine, Jacquelyn, who is also an intern will be working in plan and elevation.
A
S1 internally lit signage c/w acrylic panel & metal letterings
B
B
B
B
B
B
B
B
B
C
C
C
C
C
C
C
C
C
D
D
D
D
D
D
D
D
D E
E 3315
D
D
D
D
D
D
C
C
C
C
C
C
B
B
A
A
B
B
B
B
A
A
A
A
D
D
D
C
C
C
B
B
B
A
A
A
25
380
50
laser cut partition (S2)
05 BU
04 BU
03 BU
02 BU
01 BU timber skirting FFL
6386
Dark & Twisted 131, Jalan Medang Serai, Bukit Bandaraya, Bangsar, 59100, Kuala Lumpur.
A
01 Elevation FW SCALE 1:20
Proposed Interior Design for Dark & Twisted at Evolve Mall, Pacific Place, Ara Damansara
Partition Wall - elevation
Fig 17: Elevation of partition wall TD:PW/01
ARKITEK ARI METHI
D&T/20162175
angela
tessa
17-02-16
00
1:20
17-02-16
A
A
02 PLAN FW SCALE 1:20
02 DT
timber stud
03 DT
04 DT
03 FW
SECTION A-A
02 DT
SCALE 1:25
DETAIL
03 DT
SCALE 1:2
Proposed Interior Design for Dark & Twisted at Evolve Mall, Pacific Place, Ara Damansara
Dark & Twisted 131, Jalan Medang Serai, Bukit Bandaraya, Bangsar, 59100, Kuala Lumpur.
ARKITEK ARI METHI
DETAIL
04 DT
SCALE 1:2
Partition Wall - plan & section - detail D&T/20162175
angela
DETAIL SCALE 1:2
TD:PW/04 tessa
17-02-16
00
as shown 17-02-16
Fig 18: Construction details of partition wall
4615
3500mm HT.
01 DT
368
S1 internally lit signage c/w acrylic panel & metal letterings
2982
FFL
02 LS
FRONT ELEVATION SCALE 1:20
Dark & Twisted 131, Jalan Medang Serai, Bukit Bandaraya, Bangsar, 59100, Kuala Lumpur.
Proposed Interior Design for Dark & Twisted at Evolve Mall, Pacific Place, Ara Damansara
Lit Signage front elevation
TD:LS/02
Fig 19: Elevation of restaurant’s logo
ARKITEK ARI METHI
D&T/20162175
angela
tessa
25-02-16
1:20 25-02-16
00
65
CEILING HT.
4615
A
02 BU
645
368
LED strip light
10mm thk acrylic board w/ sticker
645
A 01 DT
FRONT ELEVATION DETAIL SCALE 1:20
S1 internally lit signage c/w acrylic panel & metal letterings
01 BU
SECTION A-A SCALE 1:5 4615
10
10 5
securely fixed 3mm thk S1 to plywood ceiling
368
welding using 'L' bracket
348
10
02 DT
LED strip light (warm white)
BACK ELEVATION DETAIL SCALE 1:20
10mm thk acrylic board w/ sticker
02 BU
BLOW-UP DETAIL SCALE 1:1
Dark & Twisted 131, Jalan Medang Serai, Bukit Bandaraya, Bangsar, 59100, Kuala Lumpur.
Proposed Interior Design for Dark & Twisted at Evolve Mall, Pacific Place, Ara Damansara
Lit Signage details section & blow up detail
TD:LS/04
Fig 20: Construction details of restaurant’s logo ARKITEK ARI METHI
D&T/20162175
angela
tessa
25-02-16
as shown 25-02-16
After I have completed the partition wall and the logo, I continue to work on the door and material schedule of the restaurant. This is somewhat similar to what I have learnt during the short semester (Measure Drawing) last year.
Fig 21: Door schedule for Dark & Twisted
00
Project 4: F.O.S • Location: Evolve Mall • Status: Proposed stage; Design presented • Skills learnt: Schematic Design During the period of rushing the door schedule for Dark & Twisted, we were suddenly assigned to complete the backdrop and chandelier design for F.O.S. The three interns, Crystallina, Jacquelyn and I were all in charge of different brands under F.O.S. I was given the brand named Damsel & Republic who the target customers are youngsters age from teens to young adults. As the main customers are on the average age of below 25, I have come out with a more vibrant design using striking but bold colours. Integrating with the core idea of the brand of being playful and young, I added the element of chic to make it more modern looking yet unique at the same time.
Fig 22: Proposed design for backdrop
Â
Fig 23: Chandelier ideas
Fig 24: Progressed chandelier designs
Â
CONCLUSION After two months of doing my internship in Arkitek Ari Methi, I realized I have gained more than I expected no matter in soft or hard skills. I have learnt from my supervisor may little details that need to be attended, like the theory of corners, edges and surfaces. These are the things that I have never take notice of when visiting a site and observing the entire flaw within construction. Besides that, I have also learned to get used to the working lifestyle of an architecture firm. It has many fields in a company, from department that in charge of schematic design, and department that is responsible of contact authorities. Each of them has their own responsibilities and deadline to be meet. In this company that I interned in, all the staffs will work together and help one another to meet the requirement. It taught me that being a good teammate is very important because team work is crucial in finishing a big project that is meeting its due date. Lastly, I have grown to like the responsibility of being in project management team. I have witnessed how my supervisor discussing problems with the clients and contractors, and also how my senior settle on-site construction matters with the subcontractors and workers in order to make sure everything is done on time.