FONDATION LUMA

CAFE 00.104A

RAMPE 00.023

235.61 m²

HSP: 4.65 m

HSP:

EXT

E 09

E 10 HSP:

HSP:

L: 550 P: 250 H: 1000

RIA

PB CAFE

ZONE TECH. SALLE D'EXPOSITION 00.115 10.43

ASCENSEUR E 07 HSP:

HSP: 4.875 m

EXT EXT

ESCALIER 19 00.019S m²

HSP:

CAFE 00.104D

SALLE D'EXPOSITION 1 00.105

214.19 m²

HSP: 5.35 m

HSP: 4.775 m

HALL 00.101 5m

HSP:

ESCALIER10 00.010S 2.36

ESCALIER10

HSP:

-

SAS ESC. 10 00.010V m²

4.09

4.5 m

HSP:

5.06

-

HSP:

2.52

HSP:

SAS 2 ESC. 10 00.010

-

EXT

HG C°

SAS 2 ESC. 9 00.009

4.5 m

3.18

HSP:

3.31

SAS ESC. 2 00.002V 3.13

HSP:

SAS ESC. 9 00.009V

4.41

HSP: 2.75 m

HSP:

CO²

2.85

HSP:

RIA

ESCALIER 11 00.011S

RIA

ESCALIER 9 00.009S

ESCALIER 4 00.004S

2.7 m

SAS ESC. 4 00.004V 4.20

HSP:

4.44

HSP:

5.0 m

ESCALIER 2 00.002S m²

2.81

-

HSP:

-

PCI 00.106

5.0 m

38.86 HSP:

2.4

PB SECURITE 550 L: 250 P: 1000 H:

PB GE 550 L: 250 P: 1000 H:

E 01 HSP:

HALL 00.101 HSP:

DIVERS 00.112 3.56

6m

RIA

-

HSP:

E 02 HSP:

ARMOIRE ELEC. 00.113 6.07

HSP:

-

SANITAIRES F. 00.120 13.24

4.85

SAS EXP. 1 00.122 10.24

HSP:

SAS ESC. 3 00.003V

-

HSP:

2.93

HALL 00.101

HSP: 4.65 m

HSP:

2.5 m

ARMOIRE ELEC. 00.114 5.82

6.0 m

HSP:

5m

SAS ESC. 1 00.001V

RIA

HALL 00.101

1175.61 m² HSP:

4.20

HSP: 4.65 m

-

DIVERS 00.118 2.45

HSP:

HSP:

EXT

-

HSP:

L: 550 P: 250 H: 600

HSP:

PB BOOK

6.0 m

HSP:

ESCALIER 1 00.001S

E 04

5.5 m

2.51

HSP:

E 03

EXT

RIA

74.56

HSP:

ESCALIER 3 00.003S HALL ASCENSEURS 00.117

LIBRAIRIE 00.102

-

EXT

E 08 HSP:

HALL 00.101 HALL 00.101 HSP:

HSP:

6m

6m

SAS EXP. 2 00.121 10.11

HSP:

4m

ESCALIER 8 00.008S m²

-

HSP:

ESCALIER 5 00.005S m²

HSP:

EXT

J.D

13.29

HSP:

HG

-

SANITAIRES H. 00.109 m²

2.5 m

ESCALIER 6 00.006S

RIA

L: P: 550 H: 250 600

EXT

ESCALIER 7 00.007S

HSP:

-

PB INFO

HSP:

-

SALLE D'EXPOSITION 2 00.107 376.83 m²

HSP:

INFORMATIONS ET BILLETERIE 00.110 62.40

4m

EXT EXT

HSP:

J.D

ESCALIER 20 00.020S m²

HSP:

-

PB EXHIB. 2

J.D

2019

EXT

Arles_france

et de panneaux de béton précast évoque par ses reflets les montagnes des Alpilles avoisinantes. Par la mission d'architecte d’exécution, Studios Architecture est en charge de la mise en œuvre des volontés de Gehry Partners, et de mener à bien la réalisation des travaux.

EXT

STUDIOS ARCHITECTURES

Sur une friche ferroviaire désaffectée, une mécène suissesse a fait appel aux service de l'architecte Frank Gehry pour réaliser une fondation culturelle. Moteur d’innovation grâce à l'Atelier Luma, qui développe de nouveaux matériaux, comme des carreaux d'algues ou des briques de sel. Ce projet de tour (IGH) composé de briques d'inox en façade

J.D

L: P: 550 H: 250 800

4.9 m

4m

-



RE F

DEC_MAN

B2

.11

SAS ARCH. 4 B2.113B

B2

VP_XX

.11

.10

52.23

B2

.11

ATELIER DIVERS B2.128

EX

T

2A

B2

3.93

1A

5.04

B2

.12

B2 .14 0A

9C

.11

1B

B2 .12 9E

DEC_MAN

SAS ATELIER DIV B2.XXX m² 4.46 LOCAL ENGIN DE MAINTENANCE B2.140

8B .12

PB GEN ST

SAS INTER 1 B2.129B 8.07

88.02

VP_XX

.11

B2 .12 9D

LB_BB2.XX LB_BB2.XX

ATE

2B

SAS ARCH. 5 B2.112B

JJ..D D

6B

ARCHIVES B2-5 B2.112A

3A

3.93

B2 .12 8B

83.03

B2

C MWM

B2 .01 3S

LB_BB2.XX

BUREAU ADMINISTRATIF B2.106

L: P: 550 H: 250 800

5m

B2

97.84

HSP:

GR

4.88

HALL D'ACCUEIL BB2.09

B

ESCALIER 13 B2.013S

SAS S.BIBLIO B2.11 4.68

99.30

4.71

VP_XX

10.08

SANITAIRES BB2.04 4.71

71.89

SAS TOILETTES BB2.07

2.5 m

3.10

HSP:

5.86

B2

.14

2A

LOCAL TGS B2.142 7.26

2.9 m

ECHELLE

3.3 m

HSP:

E 18

HSP:

3m

DIVERS B2.141

2.5 m

3.24

.

5.20

SANITAIRES FEMMES BB2.06 HSP:

HSP:

HSP:

2.5 m

LOCAL MENAGE BB2.18

B2

SAS TGS B2.143

SANITAIRES BB2.05

HSP:

0.92

LBB_BB2.XXXA

HSP: 2.9 m ET_XX

HSP:

ESCALIER 4 BB2.04S

FOYER BB2.12

B2 .14 3A

4.43

5m

B2 .11 0A

84.23

HSP:

30.95

B2 .14 1A

3.84

LB_BB2.XX

SAS ARCH. 6 BB2.01B

ARCHIVES B2-6 BB2.01A

J.D

CHC ZONE TECHNIQUE B2.130B

ATELIER TEMPORAIRE DES OEUVRES B2.111B

LB_BB2.XXXA

ESCALIER 5 BB2.05S

B2

.1

B2

VP_XX

LOCAL TGS B2.110

SANITAIRES HOMMES BB2.03

LB_BB2.XX

11.09

HSP:

HSP:

11.60

2.5 m

LB_BB2.XX

HALL DES ARCHIVES BB2.17 115.34 m²

LB_BB2.XX

HSP:

3.3 m

ESCALIER 2 BB2.02S 1.79

LB_BB2.XX

HSP:

VB

ESCALIER 1 BB2.01S 4.33

RECEPTION D'ARCHIVES & BIBLIOTHEQUE BB2.08

HSP:

J.D

210.89 m²

HSP:

LB_BB2.XXXA

SAS ARCH. 7 BB2.16B

ARCHIVES B2-7 BB2.16A 35.09

HSP:

5m

ATELIER BB2.10 95.50

HSP:

5.7 m

LBB_BB2.XXXA

4.43

HSP: 2.9 m ET_XX

LB_BB2.XX

SALLE DE CONSULTATION BB2.15

65.50

HSP:

3m

5m

HALL D BB

97.8

HSP:

SALLE D'EXPOSITION 1 BB2.14 159.28 m²

LB_BB2.XX DEC_MAN B2

SAS ARCH. 4 B2.113B

DEGAGEMENT BB2.13

3A

42.54

HSP:

5.81

.11

SAS ARCH. 5 B2.112B

ATELIER DIVERS B2.128

EX

T

2A

8B

.12 8B B2

9D

HSP:

11.09

B02 - PLINTH 2

HSP:

A DEFINIR xx cm

Atelier

D

HALL DES ARCHIVES BB2.17 115.34 m²

LB_BB2.XX

HSP:

3.3 m

ESCALIER 2 BB2.02S 1.79

Complexe chape xx cm RADIANT

LB_BB2.XX

LB_BB2.XX

HSP:

ESCALIER 1 BB2.01S 4.33

ARCHIVES B2-7 BB2.16A 35.09

HSP:

4.43

9B .11

B2

0A

A T

19

EX

B2 .1

E

3A

.14

2A

XX

LOCAL TGS B2.142 7.26

2.X

B SAS INTER 7 X B2.007V

XX

B2.

4.20

ECHELLE

6 cm ravoirage. 14 cm foamglass recup polyane 36,00 14,6 cm radiant 1,4 briques ou 8r +8f +20,6pr +1,4b

LOCAL TGS B2.110 11.60

SAS INTER 2 B2.109 16.36

210.89 m²

HSP:

LB_BB2.XXXA

SAS ARCH. 7 BB2.16B

8D

RECEPTION D'ARCHIVES & BIBLIOTHEQUE BB2.08

HSP:

J.D

2.5 m

.14

2.9 m

SANITAIRES HOMMES BB2.03

LB_BB2.XX

HSP:

B2

.11

0A 3.10

HSP:

5.86

B2

SAS TOILETTES BB2.07

3.3 m

E 18

.14 B2

11 B2 .1

B2

2.5 m

5.7 m

LBB_BB2.XXXA

HSP: 2.9 m ET_XX

JJ..D D

5m

Finition sol: Classroom Briques clairesB02 : Ref.: Thumbleweed - PLINTH 1 B

LB_BB2.XX

Béton 30mm

Complexe chape 22 cm RADIANT

SALLE DE CONSULTATION BB2.15 65.50

HSP:

5m

validé encastrer 25,00 distribution cfa /cfo si foureaux obsolètes

VB

HALL D'ACCUEIL BB2.09 97.84

HSP:

5m

SALLE D'EXPOSITION 1 BB2.14

PARC DES ATELIERS_LUMA ARLES / NOUVELLE CONSTRUCTION PHASE 2 : FICHE DE DEBLOQUAGE TRAVAUX _ ATELIER D’ARTISTE PLINTH II

159.28 m²

HSP:

5m

DEGAGEMENT BB2.13 42.54

HSP:

2.9 m

LB_BB2.XX

DEC_MAN

B02 - PLINTH 1

C

J.D

VP_XX

Bureau administrati f

Béton 30mm

Complexe chape 22 cm RADIANT

ESCALIER 5 BB2.05S 3.84

LB_BB2.XX

HSP:

25,00

FOYER BB2.12

71.87 HSP:

3m

3m

1A

4.71

88.49

LB_BB2.XX DEC_MAN

.10

.14

DIVERS B2.141

2.5 m

SANITAIRES BB2.04 LOCAL MENAGE BB2.18

5.20

SANITAIRES FEMMES BB2.06 10.08

HSP:

B2

SAS TGS B2.143

2.5 m

HSP:

3.24

Ind C Porte CR4

SANITAIRES BB2.05 4.71

ATELIER BB2.10 HSP:

30.95

LBB_BB2.XXXA

HSP:

4.68

B2

HSP: 2.9 m ET_XX

VB

SAS S.BIBLIOTHEQUE B2.119B

CHC ZONE TECHNIQUE B2.130B

ATELIER TEMPORAIRE DES OEUVRES B2.111B 99.30

E 08

B2

4.43

5m

0.92

HSP:

T

84.23

HSP:

9C

B

.12

9E

.12

36,00

27.79

EX

SAS ARCH. 6 BB2.01B

ARCHIVES B2-6 BB2.01A

J.D

ESCALIE BB2.04

3m

STOCKAGE BIBLIOTHEQUE B2.119A

SAS ATELIER DIV B2.XXX m² 4.46 LOCAL ENGIN DE MAINTENANCE B2.140 5.04

B2

LB_BB2.XXXA

3.

HS

71.87

B2

1A

.12

C

ESC BB

5.34 m² LB_BB2.XX

FOYER BB2.12

HSP:

.11

B2

B02 - PLINTH 2

Béton poli 10 cm

Complexe chape 26 cm INERTE

B

ARMOIRE ELEC. B2.137

Prescriptions STUDIOS

PB GEN ST

8.07

7A

3 2.1

88.02

Réserve de sol mise au point EXE totale (cm) 30.3.20

3.93

Prioritaire E 04

TX

B2

43.33

LB_BB2.XX

2B

SAS INTER 1 B2.129B

Palier escalier

HALL ASCENSEUR-CHC B2.101

2.9 m

.11

.12

L: P: 550 H: 250 800

Finition (lot béton poli, carrelage, menuiseries )

Local

Zone

B2

Recharge (lot Recharges inertes et Planchers radiants ) 52.23

B2

ARCHIVES B2-5 B2.112A

.11

3.93

LB_BB2.XX DEC_MAN

Niveau

5m

HSP:

ESCALIER 4 BB2.04S 0.92

HSP:

VP_XX

ESCALIER 7 B2.007S 13.44

m



MARCHÉ DE LACANAU : LIEU D’ÉCHANGE VACHERON ARCHITECTES

Ce concours avait pour objectif de développer le centre bourg de Lacanau-Ville qui actuellement ne connaît pas de pôle d’attractivité.

Lacanau_france P R O J E T L AU R É AT 2018

Au croissement des deux axes principaux de la ville, à côté de la médiathèque et de l’ancienne salle des fêtes, sur un terrain vague, nous avons proposé une halle de marché qui

utilise les matériaux locaux et réinterprète la forme des granges traditionnelles. La charpente métallique évoque l’ancienne industrie des forges, la brique renvoie aux maisons du secteur et le bois s’inspire des séchoirs à tabac des environs.



HIPPODROME : CONCOURS VACHERON ARCHITECTES L a Te s t e d e B u c h _ f ra n c e 2015

Ce concours avait pour objectif de créer 40 logements sociaux individuels, 40 logements collectifs pour un foyer pour jeunes travailleurs ainsi qu’une maison de quartier. Le site proposé pour accueillir ce projet est localisé sur l’hippodrome du Becquet, au Sud du Bassin d’Arcachon.

Le parti a été de développer un projet tissant un lien entre l’hippodrome et le contexte urbain environnant. La maison de quartier accueille les visiteurs, et le foyer pour jeunes travailleurs offre des vues directs sur les pistes et les écuries.



LE HAMEAU : MAISONS DE VACANCES VACHERON ARCHITECTES Contis_france 2015

Sur la dune de sable de Contis-Plage, à proximité direct de l’Océan Altantique, la commande a été portée par trois couples d’amis qui souhaitaient établir des maisons de vacances.

Ils désiraient évoluer dans des lieux de vie offrants de l’intéraction, de l’échange, tout en proposant une intimité pour chacune des familles. Proche de la forêt des Landes, nous avons élaboré des maisons jouants avec le pin des Landes et la maçonnerie afin de s’intégrer au site.


35 90

80

90

80

10

174

80

90

80

184

+2,97

+2,82

Poutre Retroussée Béton

Chape

16 9 20

+6,66

35

9 20

60

165

40

165

40

250

204

215

+0,00

Faitage à sec

165

Isolant ISOVER Comblissimo ép: 460mm

+2,97

80

+2,82

90

80

Poutre Retroussée Béton

10

174

80

90

250

90

EFISOL TMS 68

184

10 12 6

35

Chape

16

31

Chape

35

9 20

+0,00

40

165

Maîtres de l'ouvrage : 204

165

250

40

215

165

CALIOT Virginie & Vincent CURUTCHET Véronique & Guillaume DAVANT Anne & Pierre-Emmanuel

Chape EFISOL TMS 68 10 12 6

10 12 6

Bardage bois

31

16

Béton Armé

Membrane PVC KNAUF Thane F 160 mm

250

Capot Alu

80




OYSTER HOUSE Sur le port ostréïcole de La Teste de Buch, au Sud du Bassin d’Arcachon, ce projet de maison individuelle s’inscrit dans un tissus au caractère fort, essentiellement composé de cabanes d’ostréïculteurs.

VACHERON ARCHITECTES L a Te s t e d e B u c h _ f ra n c e 2015

avec ces deux étendues d’eau. Afin d’offrir une certaine intimité et profiter des vues, les lieux de vie ont été développés à l’étage supérieur, tout comme la piscine.

43

Implantée entre le port à l’Ouest, et un canal à l’Est, nous avons eu pour objectif de créer une maison communiquant

0,00 niveau de référence! mur voisin

126,5

115

142,5cm

stepoc

76

15 m3 d'eau

dalle BA coullée en place

-0,95 niveau voirie -0,95

te 3 0%

124cm

pen

102

niveau voirie

COUPE transversale passage voiture

216


340 253

285

243 239

257 271

15 x 19 ht marche

48

0,00

niveau de référence! mur voisin

395 ngf -0,95

206

282

niveau voirie

COUPE entre files D & E


199 plancher hourdis isolant KP1

150

97

7

passage faux plafond

nourice chauf nourice sanitaire

86

89 3 4 5

6

82

15 ht de 19,00 giron 22

7

12,00 m2

7 8 9

10 11 12

CHAMBRE 2 12,10 m2 hsp 248

13 ht de 18,50 giron 22

94

Niveau sol fini

180

83/204

0,00

81

Niveau sol fini

DRESSING 2

83/204

EU évier

7

265 LINGERIE

Niveau sol fini

CHAMBRE 3 11,80 m2

S. D'EAU 2

4,40 m2

évac sèche linge

0,00

0,16

Niveau sol fini

136

6,54 m2

344

clapet de décompression

83/204

74

WC

83/204

S. D'EAU 1

83/204

cuvette wc air9

Niveau sol fini

0,16

TERRASSE chambre 2

82

DEGAGEMENT

83/204

10

0,32

Niveau sol fini

0,00

297

Garde corps

73

24 m2

40

93

147

220

CHAMBRE 1

80

1 2

83/204

297

DRESSING 1

131

150

réservation EU! en plancher

réservation EU! en plancher

VMC! réservation EU!salle d'eau 1 en plancher

VMC! wc

VMC! salle d'eau 2

réservation EU! en plancher VH

S résine: 63,63 m2

habillage zinc, y compris support bois

PLAN niveau intermédiaire SH: 76,18 m2

EDF

Corbeau BA liaison asc

regard EP

150 60

298

RANGEMENT

16,46

131

TEL

EV wc étage

mach asc

VH 138

EAU

Niveau sol fini

102

0,00

39

Niveau dalle brute

156

44

-0,15

HSP 210 20,55 m2

83/204

1 2

3 4 5

6

7 8 9

ATELIER

13,93

10 11 12

160

14 ht 17,90 giron 22

regard EP

11,00 m2

ENTREE

Module! PAC VB

9,30 m2 HSP 210

Garde corps 83/204

VH

RAMPE VOITURE rampe 30%

regard EP

caniveau grille fonte

-0,02

Corbeau BA Corbeau BA

27 juillet 2015

83/204


36 dalles 60/60! NOVOCERAM outdor

SANIT

6 7

8 9

10 11 12 13 14

15 ht de 19,00 giron 22

73/204

TERRASSE EST

3 4 5

83/204

318

CELLIER

vélux GGL! M04! 78/98

SEJOUR

vélux GGL! M04! 78/98

REPAS

CUISINE

110

340

PLAN niveau haut

SH: 70,20 m2 27 juillet 2015


PROJET DE FIN D’ÉTUDE : BROOKLYN AQUARIUM BROOKLYN AQUARIUM Brooklyn NY_USA 2015

Après une année de stage à New York, j’ai pu constater qu’il n’existait pas vraiment d’aquarium dans cette ville. Le site du Brooklyn Navy Yard, désaffecté depuis de nombreuses années, entre deux quartiers vivants de Brooklyn, constitue une barrière dans la ville. Mon désir a été d’établir un lien entre ces quartiers qui ne communiquent pas, et de donner à voir aux visiteurs, les

rives de l’East River. Le bâtiment en lui même est une expérimentation de l’architecture organique qui est en connexion avec le sujet qui l’habite.





ANTOINE VACHERON - PORTFOLIO

18.08.1990 18.08.1990 29 Avenue Rue desdeFaures 82 Saint Ouen 33 018 000Paris Bordeaux 75

06 70 10 34 73 antoinevacheron @gmail.com

ANTOINE VACHERON - PORTFOLIO


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.