ARCHITECTURAL PORTFOLIO
GENERAL NOTES
1.Drawings no to be scaled.Only figured dimensions to be used.Descrepancies to be reported to the architect.
2.All dimensions are shown in milimetres unless otherwise specified.
3.P.V denotes permanent vent
4.All R.c works to S.E's details.All civil works to
C.e's details
5.All plumbing and drainage to comply with M.O.H rules and regulations and to be in M.E's details.
6.All electrical works to E.E's details and specifications.
7.All pipes passing under slab to be encased with 150mm concrete all round
CIVIL WORKS
1.All slabs at ground level to be poured over1000 gauge polythene sheeting on50-75mm coral screed on 50-100mm hardcore
2.All soils under slab to be treated for termite control
3.All soils on cut embankments to be stabilised
MECHANICAL
1.All plumbing and drainage to comply with Mombasa County Council specifications.
2.All service ducts to be accessible from all floors
3.SVP denoted Soil vent pipe to be provided at the head of the drainage
4.Drains passing beneath buildings and walkways to be encased in150mm concrete surround
5.All underground foul and waste drain pipes to be class41golden brwn pvc pipe
STRUCTURAL WORKS
1.Depth of foundation to be determined ob site to
S.Es approval
2.For all coral aggregate reinforcement works and masonry walls to be tied with strap wrought iton at every course.
4.All walls less than200mm thick to be reinforced with hoop wrought iton at every alernate course
ELECTRICAL
1.All conduit pipes must be laid before plastering
FIRE NOTES
1.Reserve 4500litres of water for hose reel
2.Provide2X3,000mm hose reel with booster pump
3.provide fire alarm system.
4.Provide dry users with laundry valve.
5.Provide sprinkler systme in the basement areas.
FINISHES SCHEDULE
1 FLOOR FINISHES
a.6mm thick polished terrazzo laid on lime mortar screed,50%chops with25X3mm dividing strips set off to architects approval
b.400X200x30mm granito tiles on1:4mortar mix, laid on lime mortar screed
c.
d.Approved200X65X20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm1:4lime sand screed
e.40mm screed smooth finish
f.300 x300 fully vetrified acid resistant tiles with straight continous joints not exceeding 6mm wide in both directionfixed with adhesive on cement sand screed 1:3 mix
2 SKIRTING FINISHES
.30MM x100mm thick ceramic tiles
b.ex.150mm x25mm thick mangrove nailed on wall
c.100mm X25mm dressed coral stone tiles
d.Random cut and stacked mazeras stones
e.100mm lime mortar on2mm thick lime mortar screed
3 WALL FINISHES
a.12mm thick lime wash coat on lime plaster treated with waterproofing admixture.Coats applied to manufacturers specifications
b.Exposed random cut mazeras stone
c.300X300X20mm thick glazed ceramic tiles 1200mm high with100mm background with grouting to approval
d.Coral lime plaster finish containing egg white upto3coats
e.emulsion paint
4 CEILING FINISHES
a.9mm first coat1:4lime/sand screed and3mm second coat of lime plaster smooth trowelled on structural slab
b.5mm Painted waterproofed rough cast lime finish
c.Mahogany timber strips T&G
d.Emulsion paint
e.Square cut mangrove,boriti,planks alternate with lime infill
NODATE DESCRIPTION
REVISIONS
12 43 Floor Skirting Wall W-01 Window (0/01) Room Flr. level
PROJECT TITLE:
PROJECT NUMBER:
DRAWING TITLE:
DRAWING BY:
DATE:
DRAWING NUMBER:
SCALE(S):
MARCH2018
GENERAL NOTES
1.Drawings no to be scaled.Only figured dimensions to be used.Descrepancies to be reported to the architect.
2.All dimensions are shown in milimetres unless otherwise specified.
3.P.V denotes permanent vent
4.All R.c works to S.E's details.All civil works to C.e's details
5.All plumbing and drainage to comply with M.O.H rules and regulations and to be in M.E's details.
6.All electrical works to E.E's details and specifications.
7.All pipes passing under slab to be encased with 150mm concrete all round
CIVIL WORKS
1.All slabs at ground level to be poured over1000 gauge polythene sheeting on50-75mm coral screed on 50-100mm hardcore
2.All soils under slab to be treated for termite control
3.All soils on cut embankments to be stabilised
MECHANICAL
1.All plumbing and drainage to comply with Mombasa County Council specifications.
2.All service ducts to be accessible from all floors
3.SVP denoted Soil vent pipe to be provided at the head of the drainage
4.Drains passing beneath buildings and walkways to be encased in150mm concrete surround
5.All underground foul and waste drain pipes to be class41golden brwn pvc pipe
STRUCTURAL WORKS
1.Depth of foundation to be determined ob site to
S.Es approval
2.For all coral aggregate reinforcement works and masonry walls to be tied with strap wrought iton at every course.
4.All walls less than200mm thick to be reinforced with hoop wrought iton at every alernate course
ELECTRICAL
1.All conduit pipes must be laid before plastering
FIRE NOTES
1.Reserve 4500litres of water for hose reel
2.Provide2X3,000mm hose reel with booster pump
3.provide fire alarm system.
4.Provide dry users with laundry valve.
5.Provide sprinkler systme in the basement areas.
FINISHES SCHEDULE
1 FLOOR FINISHES
a.6mm thick polished terrazzo laid on lime mortar screed,50%chops with25X3mm dividing strips set off to architects approval
b.400X200x30mm granito tiles on1:4mortar mix, laid on lime mortar screed
c.
d.Approved200X65X20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm1:4lime sand screed
e.40mm screed smooth finish
f.300 x300 fully vetrified acid resistant tiles with straight continous joints not exceeding 6mm wide in both directionfixed with adhesive on cement sand screed 1:3 mix
2 SKIRTING FINISHES
.30MM x100mm thick ceramic tiles
b.ex.150mm x25mm thick mangrove nailed on wall
c.100mm X25mm dressed coral stone tiles
d.Random cut and stacked mazeras stones
e.100mm lime mortar on2mm thick lime mortar screed
3 WALL FINISHES
a.12mm thick lime wash coat on lime plaster treated with waterproofing admixture.Coats applied to manufacturers specifications
b.Exposed random cut mazeras stone
c.300X300X20mm thick glazed ceramic tiles 1200mm high with100mm background with grouting to approval
d.Coral lime plaster finish containing egg white upto3coats
e.emulsion paint
4 CEILING FINISHES
a.9mm first coat1:4lime/sand screed and3mm second coat of lime plaster smooth trowelled on structural slab
b.5mm Painted waterproofed rough cast lime finish
c.Mahogany timber strips T&G
d.Emulsion paint
e.Square cut mangrove,boriti,planks alternate with lime infill
L(-)003 BASEMENT PLAN
NODATE DESCRIPTION
REVISIONS
12 43 Floor Skirting Wall W-01 Window (0/01) Room Flr. level
PROJECT TITLE:
PROJECT NUMBER:
DRAWING TITLE:
DRAWING BY:
DATE:
DRAWING NUMBER:
SCALE(S):
MARCH2018
GENERAL NOTES
1.Drawings no to be scaled.Only figured dimensions to be used.Descrepancies to be reported to the architect.
2.All dimensions are shown in milimetres unless otherwise specified.
3.P.V denotes permanent vent
4.All R.c works to S.E's details.All civil works to C.e's details
5.All plumbing and drainage to comply with M.O.H rules and regulations and to be in M.E's details.
6.All electrical works to E.E's details and specifications.
7.All pipes passing under slab to be encased with 150mm concrete all round
CIVIL WORKS
1.All slabs at ground level to be poured over1000 gauge polythene sheeting on50-75mm coral screed on 50-100mm hardcore
2.All soils under slab to be treated for termite control
3.All soils on cut embankments to be stabilised
MECHANICAL
1.All plumbing and drainage to comply with Mombasa County Council specifications.
2.All service ducts to be accessible from all floors
3.SVP denoted Soil vent pipe to be provided at the head of the drainage
4.Drains passing beneath buildings and walkways to be encased in150mm concrete surround
5.All underground foul and waste drain pipes to be class41golden brwn pvc pipe
STRUCTURAL WORKS
1.Depth of foundation to be determined ob site to
S.Es approval
2.For all coral aggregate reinforcement works and masonry walls to be tied with strap wrought iton at every course.
4.All walls less than200mm thick to be reinforced with hoop wrought iton at every alernate course
ELECTRICAL
1.All conduit pipes must be laid before plastering
FIRE NOTES
1.Reserve 4500litres of water for hose reel
2.Provide2X3,000mm hose reel with booster pump
3.provide fire alarm system.
4.Provide dry users with laundry valve.
5.Provide sprinkler systme in the basement areas.
FINISHES SCHEDULE
1 FLOOR FINISHES
a.6mm thick polished terrazzo laid on lime mortar screed,50%chops with25X3mm dividing strips set off to architects approval
b.400X200x30mm granito tiles on1:4mortar mix, laid on lime mortar screed
c.
d.Approved200X65X20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm1:4lime sand screed
e.40mm screed smooth finish
f.300 x300 fully vetrified acid resistant tiles with straight continous joints not exceeding 6mm wide in both directionfixed with adhesive on cement sand screed 1:3 mix
2 SKIRTING FINISHES
.30MM x100mm thick ceramic tiles
b.ex.150mm x25mm thick mangrove nailed on wall
c.100mm X25mm dressed coral stone tiles
d.Random cut and stacked mazeras stones
e.100mm lime mortar on2mm thick lime mortar screed
3 WALL FINISHES
a.12mm thick lime wash coat on lime plaster treated with waterproofing admixture.Coats applied to manufacturers specifications
b.Exposed random cut mazeras stone
c.300X300X20mm thick glazed ceramic tiles 1200mm high with100mm background with grouting to approval
d.Coral lime plaster finish containing egg white upto3coats
e.emulsion paint
4 CEILING FINISHES
a.9mm first coat1:4lime/sand screed and3mm second coat of lime plaster smooth trowelled on structural slab
b.5mm Painted waterproofed rough cast lime finish
c.Mahogany timber strips T&G
d.Emulsion paint
e.Square cut mangrove,boriti,planks alternate with lime infill
L(-)004 GROUND FLOOR PLAN
NODATE DESCRIPTION
REVISIONS
12 43 Floor Skirting Wall W-01 Window (0/01) Room Flr. level
PROJECT TITLE:
PROJECT NUMBER:
DRAWING TITLE:
DRAWING BY:
DATE:
DRAWING NUMBER:
SCALE(S):
MARCH2018
GENERAL NOTES
1.Drawings no to be scaled.Only figured dimensions to be used.Descrepancies to be reported to the architect.
2.All dimensions are shown in milimetres unless otherwise specified.
3.P.V denotes permanent vent
4.All R.c works to S.E's details.All civil works to C.e's details
5.All plumbing and drainage to comply with M.O.H rules and regulations and to be in M.E's details.
6.All electrical works to E.E's details and specifications.
7.All pipes passing under slab to be encased with 150mm concrete all round
CIVIL WORKS
1.All slabs at ground level to be poured over1000 gauge polythene sheeting on50-75mm coral screed on 50-100mm hardcore
2.All soils under slab to be treated for termite control
3.All soils on cut embankments to be stabilised
MECHANICAL
1.All plumbing and drainage to comply with Mombasa County Council specifications.
2.All service ducts to be accessible from all floors
3.SVP denoted Soil vent pipe to be provided at the head of the drainage
4.Drains passing beneath buildings and walkways to be encased in150mm concrete surround
5.All underground foul and waste drain pipes to be class41golden brwn pvc pipe
STRUCTURAL WORKS
1.Depth of foundation to be determined ob site to
S.Es approval
2.For all coral aggregate reinforcement works and masonry walls to be tied with strap wrought iton at every course.
4.All walls less than200mm thick to be reinforced with hoop wrought iton at every alernate course
ELECTRICAL
1.All conduit pipes must be laid before plastering FIRE NOTES
1.Reserve 4500litres of water for hose reel
2.Provide2X3,000mm hose reel with booster pump
3.provide fire alarm system.
4.Provide dry users with laundry valve.
5.Provide sprinkler systme in the basement areas.
FINISHES SCHEDULE
1 FLOOR FINISHES
a.6mm thick polished terrazzo laid on lime mortar screed,50%chops with25X3mm dividing strips set off to architects approval
b.400X200x30mm granito tiles on1:4mortar mix, laid on lime mortar screed
c.
d.Approved200X65X20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm1:4lime sand screed
e.40mm screed smooth finish
f.300 x300 fully vetrified acid resistant tiles with straight continous joints not exceeding 6mm wide in both directionfixed with adhesive on cement sand screed 1:3 mix
2 SKIRTING FINISHES
.30MM x100mm thick ceramic tiles
b.ex.150mm x25mm thick mangrove nailed on wall
c.100mm X25mm dressed coral stone tiles
d.Random cut and stacked mazeras stones
e.100mm lime mortar on2mm thick lime mortar screed
3 WALL FINISHES
a.12mm thick lime wash coat on lime plaster treated with waterproofing admixture.Coats applied to manufacturers specifications
b.Exposed random cut mazeras stone
c.300X300X20mm thick glazed ceramic tiles 1200mm high with100mm background with grouting to approval
d.Coral lime plaster finish containing egg white upto3coats
e.emulsion paint
4 CEILING FINISHES
a.9mm first coat1:4lime/sand screed and3mm second coat of lime plaster smooth trowelled on structural slab
b.5mm Painted waterproofed rough cast lime finish
c.Mahogany timber strips T&G
d.Emulsion paint
e.Square cut mangrove,boriti,planks alternate with lime infill
NODATE DESCRIPTION
REVISIONS
12 43 Floor Skirting Wall W-01 Window (0/01) Room Flr. level
PROJECT TITLE:
PROJECT NUMBER:
DRAWING TITLE:
DRAWING BY:
DATE:
DRAWING NUMBER:
SCALE(S):
MARCH2018
Ex 900 x 825 x 25 mm Mpingo balustrade with entirely finihsed 3 coats of lime wash and stained to approval.
Galvanised corrugated iron sheets roof of pitch 22.5 0 on 50mm thick batterns on 50mm x 150mm thick rafters on a 100mm x 150mm wall plate on 500mm thick ring beam all to detail.
porous Ex 50mm x 500mm Mpingo timber screen combined with balcony for screening.
900mm x 1800mm high wooden glazed windoe with intergrated louvred shutter to schedule
GENERAL NOTES
1.Drawings no to be scaled.Only figured dimensions to be used.Descrepancies to be reported to the architect.
2.All dimensions are shown in milimetres unless otherwise specified.
3.P.V denotes permanent vent
4.All R.c works to S.E's details.All civil works to C.e's details
5.All plumbing and drainage to comply with M.O.H rules and regulations and to be in M.E's details.
6.All electrical works to E.E's details and specifications.
7.All pipes passing under slab to be encased with 150mm concrete all round
CIVIL WORKS
1.All slabs at ground level to be poured over1000 gauge polythene sheeting on50-75mm coral screed on 50-100mm hardcore
2.All soils under slab to be treated for termite control
3.All soils on cut embankments to be stabilised
MECHANICAL
310 9741,4116301,3489002,0789001,6509001,2009002,9389746389001,5509002,6019001,2009001,7509001,0751,350850
4,5003,6003,6004,5003,6003,6002,400
Ex 900 x 825 x 25 mm high Mpingo balustrade with entirely finihsed 3 coats of lime wash and stained to approval.
arched window with 90 mangrove strips angled 450 from top to bottom creating mashrubiya screening the interior spaces and allowing croos ventilation
Cral aggregate entrance steps with screed and painted to approval to the fashion shop riser = 150mm tread = 500mm
balcony flooring of wood deck hardwood supported by wooden brackets at 100mm centres anchored to coral stone wall
1,1251,6503,1501,6501,9501,650,6981,4501,4501,4501,997
1.All plumbing and drainage to comply with Mombasa County Council specifications.
2.All service ducts to be accessible from all floors
3.SVP denoted Soil vent pipe to be provided at the head of the drainage
4.Drains passing beneath buildings and walkways to be encased in150mm concrete surround
5.All underground foul and waste drain pipes to be class41golden brwn pvc pipe
STRUCTURAL WORKS
1.Depth of foundation to be determined ob site to
S.Es approval
2.For all coral aggregate reinforcement works and masonry walls to be tied with strap wrought iton at every course.
4.All walls less than200mm thick to be reinforced with hoop wrought iton at every alernate course
ELECTRICAL
1.All conduit pipes must be laid before plastering
FIRE NOTES
1.Reserve 4500litres of water for hose reel
2.Provide2X3,000mm hose reel with booster pump
3.provide fire alarm system.
4.Provide dry users with laundry valve.
5.Provide sprinkler systme in the basement areas.
FINISHES SCHEDULE
1 FLOOR FINISHES
a.6mm thick polished terrazzo laid on lime mortar screed,50%chops with25X3mm dividing strips set off to architects approval
b.400X200x30mm granito tiles on1:4mortar mix, laid on lime mortar screed
c.
ribbed concrete.
d.Approved200X65X20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm1:4lime sand screed
e.40mm screed smooth finish
f.300 x300 fully vetrified acid resistant tiles with straight continous joints not exceeding 6mm wide in both directionfixed with adhesive on cement sand screed 1:3 mix
2 SKIRTING FINISHES
.30MM x100mm thick ceramic tiles
b.ex.150mm x25mm thick mangrove nailed on wall
c.100mm X25mm dressed coral stone tiles
d.Random cut and stacked mazeras stones
e.100mm lime mortar on2mm thick lime mortar screed
3 WALL FINISHES
a.12mm thick lime wash coat on lime plaster treated with waterproofing admixture.Coats applied to manufacturers specifications
b.Exposed random cut mazeras stone
c.300X300X20mm thick glazed ceramic tiles 1200mm high with100mm background with grouting to approval
d.Coral lime plaster finish containing egg white upto3coats
e.emulsion paint
4 CEILING FINISHES
a.9mm first coat1:4lime/sand screed and3mm second coat of lime plaster smooth trowelled on structural slab
b.5mm Painted waterproofed rough cast lime finish
c.Mahogany timber strips T&G
d.Emulsion paint
e.Square cut mangrove,boriti,planks alternate with lime infill
NODATE DESCRIPTION
REVISIONS
12 43 Floor Skirting Wall W-01 Window (0/01) Room Flr. level
PROJECT TITLE:
PROJECT NUMBER:
DRAWING TITLE:
DRAWING BY:
DATE:
DRAWING NUMBER:
SCALE(S):
MARCH2018
1200mm wide by 2400mm arched window with 90 mangrove strips criss-crossing from top to bottom creating mushrabiyyah screening the interior spaces and allowing for cross ventilation
moulded Ex 900mm x 1800mm high mpingo hardwood window with wooden louvres at 25mm spacing with 4mm thick glass panels held onto the window mullions by lime putty on the upper side to architects approval
1275mm x 2550mm rectangular arched mpingo wood casement window with 4mm thick glass panels held onto the window mullions by lime putty with an external elaborately carved frame holding burglar proofing bars to detail
moulded Ex 400mm x 800mm high steel window with steel louvres at 25mm spacing
moulded Ex 650mm x 1300mm high mpingo hardwood window with wooden louvres at 25mm to architect s approval
GENERAL NOTES
1.Drawings no to be scaled.Only figured dimensions to be used.Descrepancies to be reported to the architect.
2.All dimensions are shown in milimetres unless otherwise specified.
3.P.V denotes permanent vent
4.All R.c works to S.E's details.All civil works to C.e's details
5.All plumbing and drainage to comply with M.O.H rules and regulations and to be in M.E's details.
6.All electrical works to E.E's details and specifications.
7.All pipes passing under slab to be encased with 150mm concrete all round
CIVIL WORKS
1.All slabs at ground level to be poured over1000 gauge polythene sheeting on50-75mm coral screed on 50-100mm hardcore
2.All soils under slab to be treated for termite control
3.All soils on cut embankments to be stabilised
MECHANICAL
1.All plumbing and drainage to comply with Mombasa County Council specifications.
2.All service ducts to be accessible from all floors
arched lintel
timber frame screwed to lintel
glass glazing to manufacturers specification
15mm wide horizontal wrought iron at mid -centre for binding the welded vertical rods
wooden window cill
horizintal ex 50 x 12mm steel louvres
Ex 75mm x 50mm steel window mullion
3.SVP denoted Soil vent pipe to be provided at the head of the drainage
4.Drains passing beneath buildings and walkways to be encased in150mm concrete surround
5.All underground foul and waste drain pipes to be class41golden brwn pvc pipe
STRUCTURAL WORKS
1.Depth of foundation to be determined ob site to
S.Es approval
2.For all coral aggregate reinforcement works and masonry walls to be tied with strap wrought iton at every course.
4.All walls less than200mm thick to be reinforced with hoop wrought iton at every alernate course
ELECTRICAL
1.All conduit pipes must be laid before plastering
FIRE NOTES
1.Reserve 4500litres of water for hose reel
2.Provide2X3,000mm hose reel with booster pump
3.provide fire alarm system.
4.Provide dry users with laundry valve.
5.Provide sprinkler systme in the basement areas.
FINISHES SCHEDULE
1 FLOOR FINISHES
a.6mm thick polished terrazzo laid on lime mortar screed,50%chops with25X3mm dividing strips set off to architects approval
b.400X200x30mm granito tiles on1:4mortar mix, laid on lime mortar screed
c.
d.Approved200X65X20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm1:4lime sand screed
e.40mm screed smooth finish
f.300 x300 fully vetrified acid resistant tiles with straight continous joints not exceeding 6mm wide in both directionfixed with adhesive on cement sand screed 1:3 mix
2 SKIRTING FINISHES
.30MM x100mm thick ceramic tiles
b.ex.150mm x25mm thick mangrove nailed on wall
c.100mm X25mm dressed coral stone tiles
d.Random cut and stacked mazeras stones
e.100mm lime mortar on2mm thick lime mortar screed
3 WALL FINISHES
a.12mm thick lime wash coat on lime plaster treated with waterproofing admixture.Coats applied to manufacturers specifications
b.Exposed random cut mazeras stone
c.300X300X20mm thick glazed ceramic tiles 1200mm high with100mm background with grouting to approval
not applicable for arched mashrubiya window
a) 2 pairs pressed butt hinges galvanised
b) 2 lockable casement fasteners
c 4no lockable brass casement peg stays
d) 2no lever upright mortice lock as union
all iron mongery to be approved by architect and supplied with matching screws as required
a) 2 pairs pressed butt hinges galvanised
b) 2 lockable casement fasteners
c) 4no lockable brass casement peg stays
d)
2no lever upright mortice lock as union
all iron mongery to be approved by architect and supplied with matching screws as required
a) Lever upright Mortice lock or approved alternative
b) Cylinder dead lock Seal Master keyed/Or approved alternative
c Approved pair purpose made hinges and brass window stays
d) 1 No pr ornamental polished brass handle as UNION
all iron mongery to be approved by architect and supplied with matching screws as required
a) 2 pairs pressed butt hinges galvanised
b) 2 lockable casement fasteners
c) 4no lockable brass casement peg stays
d) 2no lever upright mortice lock as union
all iron mongery to be approved by architect and supplied with matching screws as required
d.Coral lime plaster finish containing egg white upto3coats
e.emulsion paint
4 CEILING FINISHES
a.9mm first coat1:4lime/sand screed and3mm second coat of lime plaster smooth trowelled on structural slab
b.5mm Painted waterproofed rough cast lime finish
c.Mahogany timber strips T&G
d.Emulsion paint
e.Square cut mangrove,boriti,planks alternate with lime infill
ground floor rear facade and front facade near the entrance
first and second floor rear facade along walkways along office staircase
groundfloor=12
firstfloor=4
secondfloor=6
Totaltype1windows=22
ground floor rear facade and front facade near the entrance first and second floor rear facade along walkways along office staircase
ground=5
offices=47
apartment=42
Totaltype2windows=94
ground floor front facade ground rear facade at the kitchen
ground=17
Totaltype2windows=17
All toilets basement
basement=23
Totaltype04windows=23
ground=15
office=7
apartmement=12
Totaltype05windows=34
NODATE DESCRIPTION
REVISIONS
12 43 Floor Skirting Wall W-01 Window (0/01) Room Flr. level
PROJECT TITLE:
PROJECT NUMBER:
DRAWING TITLE:
DRAWING BY:
DATE:
DRAWING NUMBER:
SCALE(S):
MARCH2018
Ex400mm x 800mm high steel window with steel louvresat25mmspacing
x 500mm thick RC column to structural engineersdetail 100mmthickprotectivescreed
200mmhigh150x150mmiron angle protection painted to approval 3 coats of 30mm thick horizontal mastic asphalt applied over concrete to approval
L(18)001 BASEMENT WALL SECTION
a
GENERAL NOTES
1.Drawings no to be scaled.Only figured dimensions to be used.Descrepancies to be reported to the architect.
2.All dimensions are shown in milimetres unless otherwise specified.
3.P.V denotes permanent vent
4.All R.c works to S.E's details.All civil works to C.e's details
5.All plumbing and drainage to comply with M.O.H rules and regulations and to be in M.E's details.
6.All electrical works to E.E's details and specifications.
7.All pipes passing under slab to be encased with 150mm concrete all round
CIVIL WORKS
1.All slabs at ground level to be poured over1000 gauge polythene sheeting on50-75mm coral screed on 50-100mm hardcore
2.All soils under slab to be treated for termite control
3.All soils on cut embankments to be stabilised
MECHANICAL
1.All plumbing and drainage to comply with Mombasa County Council specifications.
2.All service ducts to be accessible from all floors
3.SVP denoted Soil vent pipe to be provided at the head of the drainage
4.Drains passing beneath buildings and walkways to be encased in150mm concrete surround
5.All underground foul and waste drain pipes to be class41golden brwn pvc pipe
STRUCTURAL WORKS
1.Depth of foundation to be determined ob site to
S.Es approval
2.For all coral aggregate reinforcement works and masonry walls to be tied with strap wrought iton at every course.
4.All walls less than200mm thick to be reinforced with hoop wrought iton at every alernate course
ELECTRICAL
1.All conduit pipes must be laid before plastering FIRE NOTES
1.Reserve 4500litres of water for hose reel
2.Provide2X3,000mm hose reel with booster pump
3.provide fire alarm system.
4.Provide dry users with laundry valve.
5.Provide sprinkler systme in the basement areas.
FINISHES SCHEDULE
1 FLOOR FINISHES
a.6mm thick polished terrazzo laid on lime mortar screed,50%chops with25X3mm dividing strips set off to architects approval
b.400X200x30mm granito tiles on1:4mortar mix, laid on lime mortar screed
c.
ribbed concrete.
d.Approved200X65X20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm1:4lime sand screed
e.40mm screed smooth finish
f.300 x300 fully vetrified acid resistant tiles with straight continous joints not exceeding 6mm wide in both directionfixed with adhesive on cement sand screed 1:3 mix
2 SKIRTING FINISHES
.30MM x100mm thick ceramic tiles
b.ex.150mm x25mm thick mangrove nailed on wall
c.100mm X25mm dressed coral stone tiles
d.Random cut and stacked mazeras stones
e.100mm lime mortar on2mm thick lime mortar screed
3 WALL FINISHES
a.12mm thick lime wash coat on lime plaster treated with waterproofing admixture.Coats applied to manufacturers specifications
b.Exposed random cut mazeras stone
c.300X300X20mm thick glazed ceramic tiles 1200mm high with100mm background with grouting to approval
d.Coral lime plaster finish containing egg white upto3coats
e.emulsion paint
4 CEILING FINISHES
L(74)006 steel grating plan
a.9mm first coat1:4lime/sand screed and3mm second coat of lime plaster smooth trowelled on structural slab
b.5mm Painted waterproofed rough cast lime finish
c.Mahogany timber strips T&G
d.Emulsion paint
e.Square cut mangrove,boriti,planks alternate with lime infill
L(57)001
Basement ventilation
L(28)001 column angle protection
NODATE DESCRIPTION
REVISIONS
12 43 Floor Skirting Wall W-01 Window (0/01) Room Flr. level
PROJECT TITLE:
PROJECT NUMBER:
DRAWING TITLE:
DRAWING BY:
DATE:
DRAWING NUMBER:
SCALE(S):
MARCH2018
100mm dia downpipe with 300 x 300 hopper clamped to wall and spray painted to approval.
1500mm x 600mm mangroove moulded courtyardseats
L(74)006 steel grating plan
GENERAL NOTES
1.Drawings no to be scaled.Only figured dimensions to be used.Descrepancies to be reported to the architect.
2.All dimensions are shown in milimetres unless otherwise specified.
3.P.V denotes permanent vent
4.All R.c works to S.E's details.All civil works to C.e's details
5.All plumbing and drainage to comply with M.O.H rules and regulations and to be in M.E's details.
6.All electrical works to E.E's details and specifications.
7.All pipes passing under slab to be encased with 150mm concrete all round
CIVIL WORKS
1.All slabs at ground level to be poured over1000 gauge polythene sheeting on50-75mm coral screed on 50-100mm hardcore
2.All soils under slab to be treated for termite control
3.All soils on cut embankments to be stabilised
MECHANICAL
1.All plumbing and drainage to comply with Mombasa County Council specifications.
2.All service ducts to be accessible from all floors
3.SVP denoted Soil vent pipe to be provided at the head of the drainage
4.Drains passing beneath buildings and walkways to be encased in150mm concrete surround
5.All underground foul and waste drain pipes to be class41golden brwn pvc pipe
STRUCTURAL WORKS
1.Depth of foundation to be determined ob site to
S.Es approval
2.For all coral aggregate reinforcement works and masonry walls to be tied with strap wrought iton at every course.
4.All walls less than200mm thick to be reinforced with hoop wrought iton at every alernate course
ELECTRICAL
1.All conduit pipes must be laid before plastering FIRE NOTES
1.Reserve 4500litres of water for hose reel
2.Provide2X3,000mm hose reel with booster pump
3.provide fire alarm system.
4.Provide dry users with laundry valve.
5.Provide sprinkler systme in the basement areas.
FINISHES SCHEDULE
1 FLOOR FINISHES
a.6mm thick polished terrazzo laid on lime mortar screed,50%chops with25X3mm dividing strips set off to architects approval
b.400X200x30mm granito tiles on1:4mortar mix, laid on lime mortar screed
600mm high planter enhancinglandscape aesthetics.
6mm thick polished terrazzo laid on lime mortarscreed,50%chopswith25x3mm dividing strips set off to architects approval
c.
400mm high 450mm wide flower pots enhancing landscapeaesthetics.
400mm deep water drainage channel from roof to storm water drainage.
river rock paving along pedestrian walk way laid fromthebuildingedgeto thewalkwayend.
L(90)001 COURTYARD PART PLAN
d.Approved200X65X20mm mahogany parquet flooring in approved pattern laid with adhesive on 20mm1:4lime sand screed
e.40mm screed smooth finish
ribbed concrete. f.300 x300 fully vetrified acid resistant tiles with straight continous joints not exceeding 6mm wide in both directionfixed with adhesive on cement sand screed 1:3 mix
2 SKIRTING FINISHES
.30MM x100mm thick ceramic tiles
b.ex.150mm x25mm thick mangrove nailed on wall
c.100mm X25mm dressed coral stone tiles
d.Random cut and stacked mazeras stones
e.100mm lime mortar on2mm thick lime mortar screed
3 WALL FINISHES
a.12mm thick lime wash coat on lime plaster treated with waterproofing admixture.Coats applied to manufacturers specifications
b.Exposed random cut mazeras stone
c.300X300X20mm thick glazed ceramic tiles 1200mm high with100mm background with grouting to approval
d.Coral lime plaster finish containing egg white upto3coats
e.emulsion paint
4 CEILING FINISHES
a.9mm first coat1:4lime/sand screed and3mm second coat of lime plaster smooth trowelled on structural slab
b.5mm Painted waterproofed rough cast lime finish
c.Mahogany timber strips T&G
d.Emulsion paint
e.Square cut mangrove,boriti,planks alternate with lime infill
NODATE DESCRIPTION
REVISIONS
12 43 Floor Skirting Wall W-01 Window (0/01) Room Flr. level
PROJECT TITLE:
PROJECT NUMBER:
DRAWING TITLE:
DRAWING BY:
DATE:
DRAWING NUMBER:
SCALE(S):
MARCH2018
Tel: +254-791613506, +254-717447660
Email: antohkaully7@gmail.com