Anniehukainan portfolio

Page 1

THE PAST OF SHAM SHUI PO



STREET VENDOR-­ CLOTHING AND FOOD MARKET FOR LOCAL RESIDENT TAI NAN STREET KI LUNG STREET APLIU STREET

KWEILIN STREET

PEI HO STREET FOOD MARKET

1960

1960 -­ T E RE T S NG KI LU

1970

C

NT E R UR

FASHION SHTEET-­ WHOLESALE FOR OUTSIDER AND LOCAL RESIDENT YU CHAU STREET CHEUNG SHA WAN ROAD




THE CHANGING OF SHAM SHUI PO


NARRATIVES

STUDY MODELS


BUILDING TYPES OF SHAM SHUI PO TYPE 1 -­ ARCADE (1920 -­ )

TYPE 2 -­ HANGING (1950 -­ 60)

TYPE 3 -­ SETBACK (1970 -­ )

A

TYPE 4 -­ TOWER (1980 -­ )

TYPE 2

TYPE 4 PAVEMENT

ROAD

ROAD

ROAD

ROAD

SITE B

B

TYPE 1

TYPE 2

A

PAVEMENT UNDER THE ARCADE CEILING

EXTENTED UPPER FLOORS

UPPER FLOORS SETBACK

UPPER FLOORS ABOVE PODIUM

-­ SHOPS ARE ON THE GROUND FLOOR AND RESIDENCES ARE ON THE UPPER FLOORS. YARD TO BE REQUESTED FOR VENTILATION AFTER THE PLAGUE HAPPENED AT 1894.

YARD

TOILET

LEGEND TYPE 1 TYPE 2 TYPE 3

BALCONY TO BE PROVIDED AND 75° SETBACK OF UPPER FLOORS FOR FRESH LIGHT ENTERING THE BUILDING.

KITCHEN WINDOW

STAIRCASE

TYPE 4 BALCONY


LAYOUT PLANS LANDSCAPE LAYOUT PLAN

AP LIU

YU

CH AU

ST RE ET

SITE ELEVATION

SITE PERSPECTIVE

ST RE ET

S. K. M .S TR EE T

NA M

CH EO NG

ST RE ET

MASTER LAYOUT PLAN

ENTRANCE LAYOUT PLAN


MASSING MODELS 25 STUDY MODELS


SITE ANALYSIS DIAGRAM -足 PEDESTRIAN PATH

SITE LOCATION PLAN APLIU STREET

S.K.M. STREET

DIAGRAM -足 VIEW ANGLE

DIAGRAM -足 SUN PATH VIEWS STUDY

DIAGRAM -足 LANDSCAPE


BACKGROUND

BACKGROUND

In the past, the neightbour relationship of people are very closed. However, this condition is changing because of the faster working speed. In order to maintain this relationship, changing the perspective according of the different platforms level can be a good method. Besides, people can focus on the foot level as same as the level of shoes which is the main concept of this building.

-­ A Couple: both leather shoe makers, another cobbler is hired -­ To design flexible and functiona spaces for owner -­ To enhance the problems affected by high density in Sham Shui Po (e.g. less daylight, ventilation and noise)

PATTERN

PATTERN

A.M. P.M. EVENING

11a.m. I 6p.m. Closed

Closed

A.M.

before 11a.m.(home)

Closed (home)

Closed

P.M.

11a.m. -­ 6p.m. (shop)

Shop/ Studio

Closed

Home/ Studio

Home/ Studio

According to the pattern of this couple, it can see that they always stay at studio though after shop closed. A shorter distant from studio to live area shall be provided.

DESIGN CONCEPT There are three main design concepts of this building: 1) To change people’s perspective through different height levels of each space, it can help to attract people to focus on the foot level;; 2) To provide a free and long fitting path for customers;; 3) To increase interaction between cobbler and customers.

EQUIPMENT REQUIREMENT -­ Cabinet/ Hanging Shelves: Hammer, Kit hand sewing tool etc. -­ Space for placing: Sewing Machine, Peeling Machine, Skiving Machine etc.

SPACES REQUIREMENT

EQUIPMENT REQUIREMENT -­ Cabinet/ Hanging Shelves: Hammer, Kit hand sewing tool etc. -­ Space for placing: Sewing Machine, Peeling Machine, Skiving Machine etc.

SPACES REQUIREMENT -­ Display Area -­ Consultation Area -­ Lasts Production Area -­ Store Room for Lasts -­ Store Room for Leather Material -­ Leather Skiving Area -­ Leather Dying Area -­ Leather Drying Area -­ Studio -­ Pantry -­ Waiting Area -­ W.C.

EVENING

The seperation between main spaces.

-­ Kitchen -­ Dining Room -­ W.C. -­ Living Room -­ Master Bedroom with W.C. -­ Guest Bedroom with W.C. -­ Outdoor Gardern/ Terrace on Roof -­ Store Room -­ Study Area

Different levels of spaces can create interaction and change people’s perspective.


DEVELOPMENT 1) CHAGING PERSPECTIVE

Eye Level Changed

Normal Eye Level

Eye Level Changed

Normal Eye Level

2) FORM DEVELOPMENT

(a) The relationship are not closed enough.

(b) The long fitting path has been provided.

(c) Some inter locking spaces occurs to increase the relationship.

(d) The perspective of people has been changed as the different levels of platform.

3) WORKING PROCESS

CONSULTATION

FOOT MEASUREMENT

CUSTOM PATTERN

The customer will be involved in the whole process of custom made shoe from the design stage to the final fitting stage. During the product stage, customer has to come back for fit testing.

LASTS PRODUCT

LASTS PRODUCTION

LASTING THE UPPER

LASTING THE BOTTOM

FIT TEST


DEVELOPMENT REFERENCE PHOTOS OF WORK SPACES

STORAGE FOR LASTS

LASTS PRODUCTION

LEATHER PRODUCTION

DYING MATERIAL

1) WALKING ROUTE

2) CHANGING PLATFORM

The Shop subdives to five parts which are Consultation Area/Display Area, Waiting Area, Lasts Production Area, Lounge/W.C., Fitting Area. Customers can see the shoe whether outside or inside the building as the perspective has been changed in order to the different levels of platforms. Customers can also walk around the shop from the Consultation to the Fitting Area which closed to the Studio for shoe fitting.

The Working Part subdives to four parts which are Consultation/Display Area, Last Production Area, Material Storage and Studio. A private staircase has been provided for cobbler working.

The Live part subdives to five parts which are Kitchen, Dinning Area, Living Room, Master Bedroom and Guestroom. Owner can enter to the living area from Studio. Also, another route is taking lift to enter the Living Room.


PLANS (SCALE 1:50)

LEGEND: 1. CONSULTATION AREA 2. DISPLAY AREA 3. STORAGE

4. WAITING AREA 5. LASTS PRODUCTION 6. LASTS STORAGE

GROUND FLOOR PLAN


PLANS (SCALE 1:50)

LEGEND: 1. LOUNGE 2. W.C. 3. OUTDOOR SITTING AREA

FIRST FLOOR PLAN


PLANS (SCALE 1:50)

LEGEND: 1. LEATHER SKIVING AREA 2. LEATHER DYING AREA 3. LEATHER STORAGE 4. FITTING AREA 5. PROTECTED LOBBY

SECOND FLOOR PLAN


PLANS (SCALE 1:50)

LEGEND: 1. LEATHER SKIVING AREA 2. STUDIO 3. ROOF OF LOUNGE 4. FITTING AREA 5. PROTECTED LOBBY

THIRD FLOOR PLAN


PLANS (SCALE 1:50)

LEGEND: 1. STUDIO 2. OUTDOOR DRYING AREA 3. DINING ROOM 4. KITCHEN 5. W.C.

6. LIVING ROOM 7. STUDY AREA 8. MASTER BEDROOM 9. GUEST BEDROOM 10. PROTECTED LOBBY

FOURTH FLOOR PLAN


PLANS (SCALE 1:50)

APLIU STREET

S.K.M. STREET

ROOF PLAN


WALKING MOVEMENT -­ PUBLIC

SECTIONAL DIAGRAM LASTS PRODUCTION AREA

WAITING AREA

CONSULTATION AREA

LONG SECTION

LASTS PRODUCTION AREA

WAITING AREA

CONSULTATION AREA

CROSS SECTION

LEATHER SKIVING AREA

LOUNGE

LASTS PRODUCTION AREA

LONG SECTION


WALKING MOVEMENT -­ OWNER & COBBLER

SECTIONAL DIAGRAM

LEATHER SKIVING AREA

OUTDOOR SITTING AREA

LOUNGE

LASTS PRODUCTION AREA

LONG SECTION

OUTDOOR SITTING AREA

LOUNGE

LASTS PRODUCTION AREA

CROSS SECTION


WALKING MOVEMENT -­ OWNER


ELEVATIONS (SCALE 1:100)

NORTH-­WEST ELEVATION

NORTH-­EAST ELEVATION


ELEVATIONS (SCALE 1:100)

NORTH-­EASTELEVATION

SOUTH-­WEST ELEVATION


SECTIONS (SCALE 1:100)

SECTION A-­A

SECTION B-­B

A

B

A

B


SECTIONS (SCALE 1:100)

SECTION C-­C

C

SECTION D-­D

C D

D


INTERNAL VIEWS

CONSULTATION & DISPLAY AREA

WAITING AREA


INTERNAL VIEWS

LASTS PRODUCTION AREA

FITTING AREA


INTERNAL VIEWS

MATERIAL STORAGE/ SKIVING/ DYING AREA

STUDIO (TO ROOF OF LOUNGE)


INTERNAL VIEWS

ROOF FOR LEATHER DRYING AREA/ ENTRANCE OF LIVING

ENTRANCE OF LIVING/ DINING AREA


INTERNAL VIEWS

LIVING ROOM

MASTER BEDROOM


EXPLODED CONSTRUCTION DIAGRAM

TIMBER LIKE PLASTIC PLATE

STEEL FRAME GLASS WALL PANEL CIRCLED ALUMINUM MESH

PROPOSED STRUCTURAL LAYOUT

The main structure of this building is Steel Frame. As there are different inter-­locking and cantilevered spaces, the loading also through the structural wall transfer to the ground. The structural walls are willing to on the same position for the loading transfer.


STRUCTURAL DIAGRAM

STEEL FRAME

FACADE MATERIAL TIMBER LIKE PLASTIC PLATE

CIRCLED ALUMINUM MESH

CURTAIN WALL

The facade is just like the bottom plate of leather shoe which is to support the loading. The most of leather shoes are used the wood bottom plate as its duration. For the building facade, the timber like plastic plate can become the main symbol. The circled aluminum mesh is used in the semi-­private spaces such as Studio, Lasts Production Area and Material Storage. The private spaces such as Master Bedroom and Guest Bedroom also used this mesh in facade. The reason is not only to block some of sunlight, but also provide transparence between inside and outside. On the lower level like Last Production Area, it can increase the relationship with the people outside street. They can see the lasts and shoes level. The curtain wall also adopt for increasing the relationship with external.


EXTERNAL VIEWS


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.