04.29_pba

Page 1

stage l

ba

glo

y

nit

mu

m co

al

du

ivi

ind

vertical exclusion

horizontal fragmentation


holistic metric life systems

sustainability

health

access

surplus

equality


process

connect combination, dialogue, understanding

empower equip, encourage, initiate

make collaborate, materialize, manifest

sustain partnership, reflect, grow,


product growth support role of facility Initial Cycle

growth of project in 4th dimension

establishment of independant networks for project sustainablity

life systems

life systems

sustainability

health

health

life systems

sustainability

health

sustainability

surplus

access

surplus

phase II

phase I

access

phase I

surplus

equality

access

equality

equality


networks of action dialogue with larger citizenry

establisment of neighborhood non-profit construction training for residents

forum for ongoing community discussion

use of recycled materials

establishment of neighborhood dialogue

“work-from-home” workshops

neighborhood elders

tax-exemption for new infrastructure

reuse of vacant infrastructure

parents at day care

pro-bono design services from landscae firm rising neighborhood “champions”

community identity neighborhood elders

neighborhood action events

student construction experience conditional use permit

local skilled craftspeople

in-kind donation from major construction company

reuse of vacant infrastructure

involvement of emerging demographics

partnership with local construction guild

engagement with neighborhood “old guard”


symptoms and system symptoms

process

products

community input

project instigation

system

solution strategies


objective

“the metropolis as a factory for the production of the common” hardt, negri

“the sleeping creator must be awakened... better the more consumers it is able to turn into producers, that is, readers or spectators into collaborators.” asger jorn


variable investment

temporary

semi-perm

perm


investment

operations

time


delivery

_deployable

_subsidiary

_clearing house

facility facility

need

need deployable infrastructure product (solution)

product (solution)

facility subsidiary design-build

need product (solution)


primary structure

welded moment connection

ent m o ed m bolt ction e conn

pan

els

at 2

’o

c.

beams at

.

4’oc.

oc

g

s t r i

.

n

t a s

c

m u l o

6

c o ’

a

’ 4 t


4’ dimens ion

expansion

6’

dim

en

sio

n

vertical

horizontal

12ft

9ft

office

room size

small shop

room height

16ft

large shop


infill kit of parts

user-defined

container


onsite expansion

existing warehouse temporary structures

year 1 repurposing of existing infrastructure



new building

grading

planned grid

year 10 addition of basic infrastructure



program infill

workshops, offices

year 25 expansion of foundation and structures



potential removal of existing str.

year 65 mobilization & deployment of program elements



simple grid leaves value onsite

year 100 piers and anchor remain for repurpose



elevation


south elevation


section b


west elevation


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.