stage l
ba
glo
y
nit
mu
m co
al
du
ivi
ind
vertical exclusion
horizontal fragmentation
holistic metric life systems
sustainability
health
access
surplus
equality
process
connect combination, dialogue, understanding
empower equip, encourage, initiate
make collaborate, materialize, manifest
sustain partnership, reflect, grow,
product growth support role of facility Initial Cycle
growth of project in 4th dimension
establishment of independant networks for project sustainablity
life systems
life systems
sustainability
health
health
life systems
sustainability
health
sustainability
surplus
access
surplus
phase II
phase I
access
phase I
surplus
equality
access
equality
equality
networks of action dialogue with larger citizenry
establisment of neighborhood non-profit construction training for residents
forum for ongoing community discussion
use of recycled materials
establishment of neighborhood dialogue
“work-from-home” workshops
neighborhood elders
tax-exemption for new infrastructure
reuse of vacant infrastructure
parents at day care
pro-bono design services from landscae firm rising neighborhood “champions”
community identity neighborhood elders
neighborhood action events
student construction experience conditional use permit
local skilled craftspeople
in-kind donation from major construction company
reuse of vacant infrastructure
involvement of emerging demographics
partnership with local construction guild
engagement with neighborhood “old guard”
symptoms and system symptoms
process
products
community input
project instigation
system
solution strategies
objective
“the metropolis as a factory for the production of the common” hardt, negri
“the sleeping creator must be awakened... better the more consumers it is able to turn into producers, that is, readers or spectators into collaborators.” asger jorn
variable investment
temporary
semi-perm
perm
investment
operations
time
delivery
_deployable
_subsidiary
_clearing house
facility facility
need
need deployable infrastructure product (solution)
product (solution)
facility subsidiary design-build
need product (solution)
primary structure
welded moment connection
ent m o ed m bolt ction e conn
pan
els
at 2
’o
c.
beams at
.
4’oc.
oc
g
s t r i
.
n
t a s
c
m u l o
6
c o ’
a
’ 4 t
4’ dimens ion
expansion
6’
dim
en
sio
n
vertical
horizontal
12ft
9ft
office
room size
small shop
room height
16ft
large shop
infill kit of parts
user-defined
container
onsite expansion
existing warehouse temporary structures
year 1 repurposing of existing infrastructure
new building
grading
planned grid
year 10 addition of basic infrastructure
program infill
workshops, offices
year 25 expansion of foundation and structures
potential removal of existing str.
year 65 mobilization & deployment of program elements
simple grid leaves value onsite
year 100 piers and anchor remain for repurpose
elevation
south elevation
section b
west elevation