1 minute read

Master Plan Framework

Establishing Connections:

Primary road: The retained thoroughfares of Olympic master plan are connected facing the stadium which act as the main arterial road.

Advertisement

Stadium access: The Olympic stadium can be easily accessed from the major roads like SP ring road, metro, Koteshwar-Bhatt road without much disturbance to the residential neighborhood.

Secondary roads: They connect the traffic from immediate neighborhood towards the arterial facing stadium with transit stops at walkable intervals.

17.5%

9.6%

Establishing connections to manage the large influx of visitors and day-to-day movement.

22% Public Road

Tertiary roads: with slow moving traffic cater to the residential neighborhood.

Experiential connectors:

Public trail: 9m green trail along 15m road

Pedestrian prioritized green fingers extending from stadium and ceremonial path towards immediate neighborhood with sports facilities along.

Shared street: 12m

Serving day to day movement of neighborhood with slow moving traffic, tree shaded pedestrian movement facilitating on-street parking and street vending.

Pedestrian pathway: 3m

Facilitating movement within the residential cluster.

Public open space: A city level open space which can host larger public events, connected from all directions.

Neighborhood open space:

They are connected to the public open space through green public trails with pedestrian and cycle track.

Consist of accessible sports facilities activated by public plazas and retail for day to day essentials.

Private open space: Anchored by private sports amenities like play ground, clubhouse, swimming pool and garden.

This article is from: