sukkah

Page 1

Main Proposal Connection method

Final component

a temporary space is not a problem, but the

U.P x:-11.973 y:-26.849

difficult point is that the space is consistent with

pattern ideas:

environmental protection, and environmental

The intermediate cut lines perpendicular to the horizontal portion of the removed half of the balloon part

1

z:33.155

the primary joint connects with U.P of the primary component and D.P of secondary.

2

the secondary joint connects with D.P of the primary component

D.P

and U.P of secondary.

y:11.974

x:-0.021 z:32.873

of this action will make the effect of rotation started to appear.

protection definition for them? For me, access the

U.P

3

largest factor of nature and to create maximum

x:-27.6

choose ex-D.P b’ : clockwise rotation

SECONDARY COMPONENT

y:0.0 z:5.6

choose ex-D.P b : counterclockwise rotation

of space is the simplest also the most environmentally D.P x:0.022

friendly, so the lightest gas on earth has the largest

y:-27.593 z:-5.617

take out

element, if I can use different characteristics of each gas to build up space, like this one to the

pattern test:

U.P

and fast dynamic.

a

x:-0.021

space must be the most environmentally friendly

y:11.974 z:32.873

To square as a basic pattern, then the vertical line connecting the different points, this way will be four

.

b’

D.P

intersecting line segments, adjust the length of the line in time, will start near the intersection with each

x:-27.6 y:0.0

PRIMARY COMPONENT

Structural Analysis

other in the moving process, Be split five different sizes like air bags will produce high and low changes in

z:5.6

twist angle of a : 30`

In this case, the I make a bold experiment in my

the beginning, so to will find the first control element vertical change, then just look for ways to make it

twist angle of a’ : 30` twist angle of b’ : 30`

inflatable system as the main structures, inflatable

produce Levels of factors can change the formation of the basic actors of 3d space.

twist angle of b : 30`

a’

vertical distance between origin & a : 5cm

buildings that can start to indirect changes shape

U.P

vertical distance between origin & a’ : 5cm

x:0.022

vertical distance between origin & b : 5cm

y:-27.593 z:-5.617

vertical distance between origin & b’ : 5cm

b

total length of both a & a’ : 28.5cm

of space while meet the different space of function

total length of both b & b’ : 28.5cm

D.P x:27.6 y:0.0

according to use of population and functional .

p

pneumatic structure

z:5.6

seal line

In the past history of the Sukkah is mainly crowded

gyrate center

places, but also in the traditional thinking in that space must have the shelter of the function there, it also fixed structure !!! But this idea should not exist

1:1 scale model of practical function and type, the actual structure of the intensity of challenge and tension

k l wa

u S e h t

! ! h a kk

I found out in the modern to build construction of

in modern, I think the temporary space should be

Step Choose Concept

free to move, and appearance can also beginning

length of two points:26cm

length of two points:15cm

length of two points:5cm

length of two points:0cm

length of two points:5cm

length of two points:15cm

important point is, the size of the space to adjust

ccumulation point of space can move each other, Space filled with

air bag of inflation

because the volume of people, Construction

the formation of helium buoyancy float up, full of schach roof as the pressure under the weight of the formation of socks Each other cancel

began serving people, the crowd to control the

each other out, the leaves in the morning in a shelter, in the evening, by

building at any time!

distort the line

.

folding up

adjusting the aeration rate to the roof started to watch Star. The main point in addition to soft structure of

height of raise after changed

folding down

inflatable, it's also very exciting gas of choice, Layer 1 Plan

0

50

100

Layer 2 Plan

150

1

0

50

100

150

He

the wall with full of helium The inflatable structure of the main wall, a large number of units to provide a

Structural strength of various sizes and people try to sit in the chair

Physical model tests and field base for the design space

to change as watching the night sky, more

Based on the assumption that all schach as a base, floating in every a

Helium

stable state, the A lesser extent also allow bending to create an appropriate privacy.

2

the wall with full of helium facilitate the control of inflation to adjust the amount of.

3

1.

1cbm weight of Air:1.286kg

the number 2 and 3, the wall is one wall forming the inflatable structure to

=6 x 6 inch

1cbm weight of Hydrogen:0.089kg

the wall with full of helium

weight : 0.1kg

9.3 feet

7.3 feet

3.7 feet

0.1/1.107 = 0.09 cbm

1cbm Buoyancy of Hydrogen=1.286-0.089=1.197kg

3.

x 2 = total 928balloons

layer 3 18x 5= 90

0.09/0.002 = 45 balloons

1cbm Buoyancy of Helium=1.286-0.179=1.107kg

=464 balloons

16 x 9 = 144

2.

full unit selection gas density and structure of the pull wire to achieve the

x

layer 2

3

108 inch = 2.048 ml

Whether to support the weight of the roof, or to reward stars for night activities

perfect type change.

23 x 10 = 230

3

6 x 6 x 3 = 108 inch

1cbm weight of Helium:0.179kg

On the 3rd wall is the main structure, because in this regard will be based on

layer 1

volume of helium

Ventilation system with the line structure

parts of Independent pneumatic

Layer 3 Plan

FLOATING

MOVEMENT

AIR CIRCULATION

TERMINAL STATION

Preface 0

40

80

120

the walls will begin to expand After filling , forming

Generated by the ground after floating would be

After balance of light weight the helium density,

schach is the most important building material to

This project is mainly to investigate to inflation for the past formed the building materials or that space, for the use of

two walls face to face , As for the helium gas filling

the circulation of air with the roof open, even in

people can move and dragged freely like dynamic

build Sukkah roof , in other words there is room to

any different now, of course, a reason to start using this material is to control the light and easy to carry and convenient

Building the ideas to gather is no longer a fixed form,

schach Called the Sukkah, so the space will be

for construction characteristics evolves to have talked about the so-called soft construction, whether or not a fixed

this should make easy the decision with the building

moving in a schach under the branches eventually

location .

, on the one hand As the basis for a fixed space, on

the wall will begin to float up and the density and

hot Summer also happy to chat and party.

volume of helium will Adjust the weight of each film, so that the height of wall consistent with the space

the one hand as the key to the morning sun block.

the size of the crowd.

TF

boundary of fuzzy types of people are beginning to redefine the appearance of this material. As technology advances, this material was used in different functions, so that the word is not just being used inflatable

Transformation

construction, the structural strength to solve the compression problem, flexible scalability also ignored the tension, inflatable structure now looks better than bricks seem weak, much lighter in weight, even more exciting is the concept of using inflatable molded construction is more surprising, the price is also cheaper and-------------------------------------------------- THERE IS NO PROBLEM FOR COLUMN AS LONG AS THE FULLY CHARGED GAS, ALL KIND OF SHAPES CAN STAND. -------

DAY 1

3

2

4

Shading system (off state)

Volume Of Gas Whatever the shape of the type body, as long as internal and filled with air, so that the same internal pressure and

the third wall

external, at this time is equivalent to a thin film floating in the atmosphere, so as long as the film strength is high enough, non-expand

primary form

secondary form

the leaves and/or branches of schach

third form

or even start lifting weights, Mountains of farmers in China use this feature to load the gas far away, out of the walls for the space could be turned into temporary shelters, but also architects use to solve real-time characteristics of inflatable

Whether to support the weight of the roof, or to reward stars for night

previous round or arched roof construction difficulty Problems.

activities. the wall is the main structure, because in this regard will be based on full unit selection gas density and structure of the pull floating wall

wire to achieve the perfect type change.

Soft Form When the inflation in the production of goods, in fact, similar to the production of clothing, must have shape, and then

Ventilation system with the line structure

follow the 3D lay dismantled into many fragments in the 2D version of sub-proofing or the material above, according to

In order not to directly affect the type change of the second layer of wall, with

the shape of the clip down and then sew it up Or sealed, so the process is basically the 3D to 2D then 3D.

pipeline structure to connect the gap between the second floor, As well as structural, the other hand, as the ventilation tube 'control of inflation in different parts of the two, by Different routes, so that changes in parts of the third layer can work independently. perspective from indoor

pneumatic units

in the morning, in order to block the sun, the roof is to present the state locked up, produced by floating and ground The benefits gap, allowing air circulation space has the effect of attachment on the wall and schach become Select a location basis, has become the third wall.

first wall units

mathematical operation of computer

data

Paper Models photos How to use paper models to make design?

NIGHT 6 11.4 ‘ 16.2 ‘

the angles by 4 components

17.3 ‘

15.8 ‘

15.1 ‘

9

4

6 6

18.9 ‘

23 ‘

bend angles 36.7 ‘

Air volume adjustment

27.8 ‘

26‘

4

42.7 ‘

strength as a strong connection

10

4

56.7 ‘

7

7

33.6 ‘

5

48.9 ‘

lager angles

between the two walls, is flexible

12

10

28.5 ‘

compared with the plastic pipe of

9

10.2 ‘

20.4 ‘

23.8 ‘

12

4

smaller angles

cell’s edge

Star system( on state)

9

6

The angle analysis of macro scale

11

11

5

straight hard water tube.

6

62.1‘

11

7

7

67.5 ‘

10

5

12

75.6 ‘

12

8 8

6

84.7 ‘

5

13 13

9 9

7 6

second wall units

13

9 6

7

13

9

This analysis map shows the rules of the joints between the units, and the formation of a surface affect relations At night, the device of the roof by adjusting the volume to achieve the expand of the movement, people from the space through Hole watch

connection detail

the stars of night sky, more open space to gather more people, at this time there is a chance to become the third wall Activity partitions.

between every components.

Use of external force to the commencement of the exercise unit shall change and second change is also starting to replace paper model of the actual model of operation to changing circumstances, by the operation of paper molding line can be more easily and to facilitate the possibility to challenge, but one drawback is that Victoria Finally to prove that to achieve the actual model.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.