Adapting Procurement for Resilient Design Presentation

Page 1

FACADES+ CONFERENCE

April 24-25th New York, NY ADAPTING PROCUREMENT for RESILIENT DESIGN

Ana Bertuna Related Companies Vice President of Design & Construction


ADAPTING PROCUREMENT FOR RESILIENT DESIGN

§  §  §  §  §  §

Design challenges Rapidly evolving advanced technology and its influence on procurement approach Influence of an active construction market vs. a slow construction market How to create a competitive procurement package How schedule influences the process Impact of budget

§  Outcome of procurement §  Not always as expected §  Adapt quickly to revisions

§  Workshops with subcontractors


PROJECTS

ABINGTON HOUSE

ROBERT A.M. STERN – ARTEX PRECAST/PIONEER WINDOWS

MIMA

ARQUITECTONICA – W&W/SOTA SYSTEM

10 HUDSON YARDS

KOHN PEDERSEN FOX – ENCLOSE

15 HUDSON YARDS

DILLER SCOFIDIO + RENFO & ROCKWELL GROUP

520 WEST 28TH ST

ZAHA HADID – M. COHEN & SONS / STAHLBAU PICHLER


THE VENETO


SUPERIOR INK


CALEDONIA


CALEDONIA


ABINGTON HOUSE


ABINGTON HOUSE



MIMA






HUDSON YARDS


10 HUDSON YARDS







THERMAL U-VALUE - .33 - .34










15 HUDSON YARDS § Tower Design §  §  §  §

Height approximately 910 ft 70 stories Total Gross Area 960,000 Square Feet Floor plate range: •  Low Rise Typical floor plates – 14,625 SF •  High Rise Typical floor plates – 13,310 SF

§  Façade Challenge §  Complex geometry §  Integrate orthogonal base with upper tower consisting of four-curved towers at corners §  Multiple glass types within the corset §  §  §  §

Cold warped and cold warped with operable windows Trapezoidal flat and curved glass Conical and curved glass Kinked with irregular shaped glass

§  Workshops with subcontractors


15 HUDSON YARDS














520 WEST 28TH STREET § Design Architect: Zaha Hadid Architects § 36 luxury condominium residential apartments § Floor plates : 11,000 – 14,000 square feet § Zoning and lot restrictions created 5 foot split levels § 21 stories includes all split levels § Highline Frontage § Design assist with sub-contractors





520 WEST 28TH STREET § Design Challenges Unique façade expression to unify split levels Chevron is comprised of two metal types Study of various metal types and colors Metal component of façade includes double curvatures 3 D modeling to design and detail interior and exterior “C” components embrace balconies and are expressed on façade Achieve a lightness to the façade design Architectural design incorporating pure lines require vigilant detailing and coordination §  Façade maintenance

§  §  §  §  §  §  §  §








28TH STREET MOCK UP


§  Respect the design – reason we hire the architect §  Each project is unique §  Schedule constraints §  Budget constraints §  Market constraints

§  Identify and mitigate risk by thorough due diligence §  Use the subcontractors and vendors to help find solutions (most experienced) §  Be prepared for the unforeseen and be quick to change paths – nothing is set in stone §  Keep an open mind, listen to everyone but draw your own conclusions §  Great talent – seek it out and pull together a collaborative team to move the project forward