Paul Bertram, FCSI, CDT, LEED AP – BD+C Director: Environment & Sustainability/ Government Affairs
Envelope Performance Impacts
50%+
* The pie chart includes 1 quad of energy (5.5%) that is a staIsIcal adjustment by the Energy InformaIon AdministraIon to reconcile two divergent data sources.
Envelope First Energy Efficiency
Energy  Management Â
Building Enclosure • Control FuncIons – Air – Moisture – Heat – Light – Sound – Etc.
Source: Peter Baker, Building Science CorporaIon
Therm & WUFI Modeling for more informed decisions
Castle Square 1960 Building No insulaSon Boston 72% EE Target over baseline IMPs over exisSng brick accounted for over 30% of EE improvement
Insulated Metal Panel DEEP Energy Retrofit
Financing for longer term paybacks MEETS – Metered Energy Efficiency TransacSonal Structure • Think of MEETS as a Green Power purchasing agreement • Part of the owner’s uIlity bill