Portfolio Assad Jaffer
rafter profile**
rafter profile**
rafter profile** min. cvr.
profile**
profile*
Lorem ipsum
cvr. min.
high span timber
rafter profile**
min. lap
barrier extg. rafter
post
plasterboard steel bolt min. cvr. min. lap
01
post
min. clear
steel str.
09
cvr. min.
stringer
profiled
5 gap
tread
nosing
plate
eave line is flush to deck
cvr. min.
rafter
gap
new threshold
flush to extg. FFL
eave line
*barrier **barrier
08
air cavity barrier
07
06
match extg.
bearer
min.
fixing
10
bolts
cvr. min.
birdnose
min.
raking bearer
pailing
min.
post fdn. cast
brackets
clear
min.
min.
05
contents
extg. fdn.
01 AADRL: Manifold Assemblage 02 AADRL: Game of Life 3D
steel reinf.
brackets
04 InForm: BIM 05 Y+R: Pastel documentation min.
steel reinf
04
min.
02
min.
cvr
08 A+E: Crafting a detail
cvr.
cvr.
03 Portfolio
Assad Jaffer
Prototype 1
simple post process-
linear planar based geometry into NURBS mesh.
-
01
ration allows for one single iteration to be repeated across spatial
Name: Manifold Assemblage Team: Martina R. , Patchara R. Role: 3D printing joinery conditions Geometry optimization Game engine visualization
Last test case for geometry optimization.
Prototype 28
Information for P1 incorporated into problem case. Especially joint condtions. Division geometry for problem condition: Fitting largest model in the
Prototype 15 mization to accomodate ing best practices.
Portfolio
Assad Jaffer
Youngest Generation: Low Complexity Follows Order
Older Generation: High Complexity
02
Name: Game of Life (GOL) S-piral Team: Liu Y., Milk., Role: Coding environment for 2D. GOL Coding environment for 3D. GOL
Generation of Spiral Columns starting conditions to allow for new generation typologies for vertical growth. GOL algorithm by John Conway is meant for a 2D environment.
spiral growth.
Portfolio
Assad Jaffer
RL: 4.60 COM ROOF
01 A11.50
RL: 3.42 BAY LEVEL Issue Date Issue Description
By
SCALE: 1 : 50
Check
RL: 1.55 Parking Level RL: 1.05 COMFFL RL: 0.00 sealevel KEY NOTES
EXTERIOR ELEVATION - COMMUNITY BUILDING
SCALE: 1 : 50
10
09
07
08
02 A11.51
02
06
05 01
SHEET NOTES
identify the design language of the existing architecture. Responding with landscape urbanism
02
03
01 A11.50
04
Seal / Signature
RL: 4.60 COM ROOF
RL: 3.42 BAY LEVEL
RL: 6.65 ROOF
building.
03 B
KENNEDY POINT MARINA
02
01 A11.50
C
Job Status
LEGEND
RL: 1.55 Parking Level
SELECTED TIMBER CLADDING GLAZING
RL: 1.05 COMFFL
RL: 2.05 OFFICE FFL
THE FINE PRINT All work shall comply with the N.Z.B.C. and all other relevant and associated standards, codes and Territorial Authority by-laws. All work shall comply with the terms and conditions of the Building, Resource and Demolition Consents issued for this project. All proprietary items and materials shall be fixed, installed or applied in strict accordance with the manufacturers recommendations. Architectural drawings shall be read in conjunction with all relevant Engineers documentation. Contractor shall check and confirm on site all dimensions and discrepancies or differences within the contract documents prior to starting the works. This drawing must not be scaled. This drawing must be read in conjunction with relevant specification clauses. This drawing and the intellectual property it represents remain the copyright of Young + Richards Ltd.
RL: 0.00 sealevel
RL: 2.05 OFFICE FFL
RL: 2.05 OFFICE FFL
RL: 1.55 PARKING
RL: 1.55 PARKING
200
01
PO Box 8171 Symonds St Auckland 1150 New Zealand
Tel
+64 9 520 6444 +64 9 520 6443 info@youngrichards.com www.youngrichards.com BP121069
Web
RL: 1.55 PARKING
LBP
ENTRY
02 A11.50
Sheet Scale
EXTERIOR ELEVATION - MARINA OFFICE
SCALE: 1 : 50
@ A1 SCALE: 1 : 50
Sheet Number
A11.02
EXTERIOR ELEVATION - MARINA OFFICE
SCALE: 1 : 50
SOUTH
NORTH
02
02
50
100
G
01 A11.50
EXTERIOR ELEVATIONS - COMMUNITY BUILDING 1 : 50
4d Edwin Street Mt Eden Auckland 1024 New Zealand
Post
01 A11.50
Sheet Description
EXTERIOR ELEVATION - COMMUNITY BUILDING
Studio
Fax
Sheet File
02 A11.51
SCALE: 1 : 50
F
RL: 4.45 FIRST FLOOR FFL
16-YR22-KPBL CONCEPT
01
02 KENNEDY POINT MARINA E A11.50
D
RL: 6.65 ROOF
RL: 4.45 FIRST FLOOR FFL
RL: 4.45 FIRST FLOOR FFL
Job Number
04 A
05
RL: 6.65 ROOF
0
2016 Young + Richards Ltd.
Issue Date Issue Description
KEY NOTES
KEY NOTES
KENNEDY POINT MARINA
05
KENNEDY POINT MARINA
04
A RL: 6.65 ROOF
03 B
02
01 A11.50
C
D
01 E
02 A11.50
G F
F
By
Check
KENNEDY POINT MARINA
E
KENNEDY POINT MARINA
D
02 A11.50
C
B
A
G
RL: 6.65 ROOF
RL: 6.65 ROOF
SHEET NOTES
RL: 4.60 COM ROOF
Seal / Signature
RL: 4.45 FIRST FLOOR FFL
RL: 3.42 BAY LEVEL
RL: 1.55 Parking Level RL: 1.05 COMFFL
Studio
4d Edwin Street Mt Eden Auckland 1024 New Zealand
Post
PO Box 8171 Symonds St Auckland 1150 New Zealand
Tel
+64 9 520 6444 +64 9 520 6443 info@youngrichards.com www.youngrichards.com BP121069
Fax Email Web LBP
RL: 4.45 FIRST FLOOR FFL
RL: 4.45 FIRST FLOOR FFL
RL: 2.05 OFFICE FFL RL: 1.55 PARKING
RL: 2.05 OFFICE FFL RL: 2.05 OFFICE FFL
EXTERIOR ELEVATION - COMMUNITY BUILDING
4d Edwin Street Mt Eden Auckland 1024 New Zealand
Post
PO Box 8171 Symonds St Auckland 1150 New Zealand
Tel
+64 9 520 6444 +64 9 520 6443 Job Number 16-YR22-KPBL info@youngrichards.com www.youngrichards.com Job Status BP121069 CONCEPT
Fax Email Web
RL: 1.55 PARKING
RL: 1.55 PARKING
LBP
LEGEND
THE FINE PRINT All work shall comply with the N.Z.B.C. and all other relevant and associated standards, codes and Territorial Authority by-laws. All work shall comply with the terms and conditions of the Building, Resource and Demolition Consents issued for this project. All proprietary items and materials shall be fixed, installed or applied in strict accordance with the manufacturers recommendations. Architectural drawings shall be read in conjunction with all relevant Engineers documentation. Contractor shall check and confirm on site all dimensions and discrepancies or differences within the contract documents prior to starting the works. This drawing must not be scaled. This drawing must be read in conjunction with relevant specification clauses. This drawing and the intellectual property it represents remain the copyright of Young + Richards Ltd.
SELECTED TIMBER CLADDING
ENTRY SCALE: 1 : 50
Studio
03
GLAZING
01 A11.50
02 A11.50 02 A11.50
Sheet File
EXTERIOR ELEVATION - MARINA OFFICE
SCALE: 1 : 50
NORTH
Sheet Description
02
EXTERIOR ELEVATION - MARINA OFFICE
SCALE: 1 : 50
WEST
01
200
SCALE: 1 : 50
EXTERIOR ELEVATIONS - MARINA OFFICE (SOUTH & WEST)
EXTERIOR ELEVATION - MARINA OFFICE EAST
01
Sheet Scale
1 : 50
@ A1
100
Sheet Number
A11.01
50
RL: 4.60 COM ROOF
By
Check 2016 Young + Richards Ltd.
0
Issue Date Issue Description
RL: 3.42 BAY LEVEL KEY NOTES
KENNEDY POINT MARINA Issue Date
By
Check
Issue Description
RL: 1.55 Parking Level
KENNEDY POINT MARINA
G
F
E
02 A11.50
D
C
B
A
RL: 1.05 COMFFL RL: 6.65 ROOF
RL: 4.60 RL: 0.00 COM ROOF sealevel
EXTERIOR ELEVATION - COMMUNITY BUILDING
10
09
RL: 1.55 Parking Level
02 A11.51
08
07
02
06
4d Edwin Street Mt Eden Auckland 1024 New Zealand
Post
PO Box 8171 Symonds St Auckland 1150 New Zealand
Tel
+64 9 520 6444 +64 9 520 6443 info@youngrichards.com www.youngrichards.com BP121069
Email Web LBP
NOITAVELE ETIS DESOPORP
EXTERIOR ELEVATION - COMMUNITY BUILDING
N YEK SETO
- 10 MOC TINUM IUB Y GNIDL 20 RAC KRAP
NNEK P YDE M TNIO ANIRA NNEK
Job Number
RL: 2.05 OFFICE FFL
M - 30 ANIRA VRES CIFFO CI DNA E IDLIUB SE GN
E OP YD M TNI ANIRA
16-YR22-KPBL Job Status
CONCEPT
LEGEND
RL: 1.55 PARKING
THE FINE PRINT All work shall comply with the N.Z.B.C. and all other relevant and associated standards, codes and Territorial Authority by-laws. All work shall comply with the terms and conditions of the Building, Resource and Demolition Consents issued for this project. All proprietary items and materials shall be fixed, installed or applied in strict accordance with the manufacturers recommendations. Architectural drawings shall be read in conjunction with all relevant Engineers documentation. Contractor shall check and confirm on site all dimensions and discrepancies or differences within the contract documents prior to starting the works. This drawing must not be scaled. This drawing must be read in conjunction with relevant specification clauses. This drawing and the intellectual property it represents remain the copyright of Young + Richards Ltd.
SELECTED TIMBER CLADDING GLAZING
03
Job Number
16-YR22-KPBL Job Status
Sheet File
02 A11.51
RL: 3.42 BAY LEVEL
Sheet Description
01
200
EXTERIOR ELEVATION - COMMUNITY BUILDING
SCALE: 1 : 50
EXTERIOR ELEVATIONS - COMMUNITY BUILDING Issue Sheet ScaleDate Issue Description
1 : 50
RL: 1.55 Parking Level
By
20
oidutS
d4 niwdE teertS nedE tM A nalkcu laeZ weN 4201 d dna oB OP 1718 x omyS dn A tS s N nalkcu dnalaeZ we 0511 d + 5 9 46 2 0 4446 6+ 25 9 4 3446 0 @ofni rgnuoy drahci .www moc.s rgnuoy drahci 1PB moc.s 96012
Sheet File
Sheet Description
EXTERIOR ELEVATION - MARINA OFFICE
SCALE: 1 : 50
EAST
tsoP
01
EXTERIOR ELEVATIONS - MARINA OFFICE (NORTH & EAST) Sheet Scale
1 : 50
@ A1
Sheet Number
100
GLAZING
RL: 1.05 COMFFL RL: 4.60 RL: 0.00 COM ROOF sealevel
02 A11.50
P SOPOR TIS DE VELE E NOITA
leT xaF
A11.00
50
THE FINE PRINT All work shall comply with the N.Z.B.C. and all other relevant and associated standards, codes and Territorial Authority by-laws. All work shall comply with the terms and conditions of the Building, Resource and Demolition Consents issued for this project. All proprietary items and materials shall be fixed, installed or applied in strict accordance with the manufacturers recommendations. Architectural drawings shall be read in conjunction with all relevant Engineers documentation. Contractor shall check and confirm on site all dimensions and discrepancies or differences within the contract documents prior to starting the works. This drawing must not be scaled. This drawing must be read in conjunction with relevant specification clauses. This drawing and the intellectual property it represents remain the copyright of Young + Richards Ltd.
SELECTED TIMBER CLADDING
200
CONCEPT
LEGEND
RL: 1.55 Parking Level
liamE beW
2016 Young + Richards Ltd. 0
SCALE:
Studio Seal / Signature
Fax
RL: 3.42 1 : 50 BAY LEVEL
Seal / Signature
RL: 4.45 FIRST FLOOR FFL
SHEET NOTES
RL: 1.05 COMFFL RL: 4.60 COM ROOF
PBL
Check
@ A1
50
100
Sheet Number
A11.02
RL: 1.05 COMFFL
0
2016 Young + Richards Ltd.
RL: 0.00 sealevel
EXTERIOR ELEVATION - COMMUNITY BUILDING
SCALE: 1 : 50
10
09
02 A11.51
08
07
02
SHEET NOTES
06
Seal / Signature yB kcehC
etaD ussI cseD e noitpir
eussI
RL: 4.60 COM ROOF
RL: 3.42 BAY LEVEL
HS N TEE SETO
Job Number
16-YR22-KPBL :ELACS 333 : 1
Job Status
CONCEPT
LEGEND
eS giS / la erutan
THE FINE PRINT All work shall comply with the N.Z.B.C. and all other relevant and associated standards, codes and Territorial Authority by-laws. All work shall comply with the terms and conditions of the Building, Resource and Demolition Consents issued for this project. All proprietary items and materials shall be fixed, installed or applied in strict accordance with the manufacturers recommendations. Architectural drawings shall be read in conjunction with all relevant Engineers documentation. Contractor shall check and confirm on site all dimensions and discrepancies or differences within the contract documents prior to starting the works. This drawing must not be scaled. This drawing must be read in conjunction with relevant specification clauses. This drawing and the intellectual property it represents remain the copyright of Young + Richards Ltd.
SELECTED TIMBER CLADDING GLAZING
200
tS boJ
suta NOC TPEC HT ENIF E TNIRP lA row l llahs k pmoc ,sdradnats htiw yl c .N eht T dna sedo ow llA e .C.B.Z ahs kr dna a dna htuA lairotirr moc ll ehto ll tiw ylp noitilomeD veler r wal-yb ytiro t eht h C llA na tna .s a smre ssi stnesno yrateirporp ossa d a noc dn ti eu detaic snoitid rp siht rof d a sme w ecnadrocc eht fo tam dn ti .tcejo idliuB s slaire funam eht h larutcetihcrA eR ,gn a eb llah ecruos ,dexif ocer srerutc hs sgniward atnemucod llatsni m .noit oC r eb lla a ro de snoitadnem ni dae otcartn id . i deilpp ujnoc llahs r f tcirts n noitcn kcehc tiw secneref c dna lla htiw mrifno rtnoc eht nih niward sihT aveler tis no gnE tn mg od tca d lla e sreeni ton tsu rd sihT a snemi irp stnemuc b i w e o i n n s s c g a T .dela sum sid dn ts ot ro ard sih er eb t naperc w eht gnitra c ni da eht dna gniw gnuoY ro seic cnujno .skro i + iw noit p lautcelletn tL sdrahciR eler ht r .d s tnav ytrepo cificep rper ti lc noita amer stnese .sesua eht ni rypoc fo thgi teehS
Sheet Scale
1 : 50
@ A1
Sheet Number
100
ES
WN
EXTERIOR ELEVATIONS - COMMUNITY BUILDING
A11.02
50
01
E
EL DNEG
J uN bo
rebm 61 22RYLBPK-
Sheet Description
EXTERIOR ELEVATION - COMMUNITY BUILDING
N
Sheet File
02 A11.51
SCALE: 1 : 50
EN
RL: 0.00 sealevel
S
W
RL: 1.05 COMFFL
WS
RL: 1.55 Parking Level
2016 Young + Richards Ltd. 0
0
SHEET NOTES :ELACS 052 : 1
RL: 3.42 BAY LEVEL
SCALE: 1 : 50
10
eliF
hS eD tee
0002
cs noitpir RP ESOPO ETIS D NALP ehS lacS te
e dni sA detaci S N teeh rebmu
005
ORP DESOP
0
Y 6102 + gnuo rahciR .dtL sd
0001
1A @
0A P.05.0
TIS NALP E
Name: Kennedy Point Marina Team: Y+R Ltd. Role: Architectural Graduate. Build BIM model for existing proposal
03 Portfolio
Assad Jaffer
052 : 1
A Court that acts as a lung through the section. Passive ventilation enabling lesser dependency on HVAC
Service spaces tucked into the main building, additionally serving temperature responsive design solutions.
Double glazed units at the entry is a response to the climate at Rourkela. This acts as a temperature enables convection cooling.
Fire safety plays an important role in servies. The response included an axial service core
Portfolio
Assad Jaffer
04
Name: National Institute of Technology Golden Jubilee Building. Location: Rourkela, India Budget: 17 million NZD appx. Team: InForm Architects. Role: Junior Architect BIM coordination. Detail design Documentation
05
SCALE: 1 : 100
-
Portfolio
Assad Jaffer
Name: #2 Tizard Rd,. Team: Y+R Ltd. Role: Architectural Graduate RC documentation. BIM model.
06
Name: 15 Parkside St Team: A+E Role: 3D model Optimization for best practices in 3D printing. Mesh Correction. Design Changes
Redesign of the stairway, foyer and Retain the existing proposal for the
Portfolio
Assad Jaffer
Roof
Structure: -
07
Proposal: Roof for Zayed College for Girls Team:Jaffer Design Studio Role: Architectural Designer Algorithmic design. Material research for sheet metal folding. Structural design optimization using L-systems. Material steel were implemented in the parametric process.
Portfolio
Assad Jaffer
-
rafter profile** rafter profile** rafter rafter profile** profile** rafter rafter profile** profile**
cvr.
cvr.
cvr. cvr.
cvr. cvr. cvr.
cvr. cvr. cvr.
cvr. min. cvr. min. cvr. cvr.min. min. cvr. min.
cvr. min.
bearer
bearer bearer
cvr. min.
cvr. min.
cvr. min.
cvr. min.
cvr. cvr.min. min.
cvr. cvr.min. min.
cvr. cvr.min. min.
min. cvr. min. lap
min. cvr.
high span timber
high span timber
less than 1.0m
high span timber
high span timber high span timber high highspan spantimber timber
cvr. min.
cvr. min.
cvr. min.
cvr. min.
high span timber rafter profile**
rafter profile**
high span timber
min. cvr. min. cvr. min. lap min. lap
min. lap
cvr. min.
cvr. min.
post fdn.post fdn. cast cast
extg. fdn. extg. fdn . extg. fdn. extg. fdn .
extg. fdnextg. . fdn.
min.
min.
min.
min.
*barrier*barrier *barrier *barrier *barrier*barrier air **barrier cavity **barrier match match match **barrier**barrier **barrier **barrier barrier need extg. extg. extg.
extg. canopy over extg. vert. wb
RISK MATRIX FOR WEST ELEVATION -COMPLIES
min.
min.
min.
This is part of a technical set for a typical timber framed 03 documentation PROPOSED SOUTH-WEST ELEVATION 1:50 @ A3 the least amount of information necessary structure. The idea isA3.01 to convey to build a structure.
extg.
extg.
extg.
H3.2 timber batten over junction
plumb line @ jamb to saw cut w/b to sill
extg. fdn . extg. extg. fdn. fdn.
min. min. min. min. cvr.
high highspan spantimber timber
rafter profile**
rafter profile**
min. rafter profile** cvr. rafter rafterprofile** profile** min. lap
bearer
cvr.
min.
cvr.
cvr. cvr.
cvr. cvr.
**barrier
01 intent WEST + ELEVATION VERANDAHinformation + clarity) ART of Crafting a detail: technique- (technical A3.01 1:50 @ A1
extg.FFL
steel reinf. steel reinf.
min. cvr.
min.
min.
cvr. cvr.
new garden level
bearer
bearer
bearer bearer bearer
min.
min.
clear
steel reinf. steel reinf. steel reinf. steel reinf.
new handrail
in order to understand the architectural intent. Name: Awning for 34 Curran St. air cavity air cavity air cavityair cavity Team: A+E air cavity air cavity barrier barrier barrier barrier barrier barrier Role: Architectural Designer LACS: Location Assembly Coordination & system gap Preliminary Design match Technical documentation is never seen as an art form. Concept Design extg. flush to gap gap gap gap new extg. gap gap new FFL Design Detail The intent behind this exercise is to attempt an art from through a LACS threshold threshold match match match match match match system. Like rules for Parametric architecture is to design. Art is intent extg. extg. extg. extg. flush toflush to Construction flush toDocumentation flush toextg. extg. flush toflush to extg. FFL extg. FFL extg. FFLextg. FFL extg. FFLDocumentation. extg. FFL pieced together. Can it become art ? Tender
extg. fdn.
pailing pailing extg. fdn.fdn. post post fdn. post fdn. post fdn. cast cast brackets brackets brackets cast cast brackets bracketsbrackets
pailings direct fix piles
75x25 flat soaker H3.2 timber batten over junction
post fdn. cast
min. min.
cvr.
cvr. cvr. min. min.
**barrier**barrier **barrier
*barrier
min.
pailing pailing pailing steel reinf. pailing
clear
min.
min. pailing
min. min.
cvr
steel reinf
min. min. min.
min. min. cvr
min. min.
min. min.
cvr cvr
min. clear
steel reinf
min.
steel steel reinf reinf
cvr. cvr. min. min.
cvr. cvr. min. min.
steel reinf. steel reinf. steel reinf.
brackets
min.
min.
bracketsbrackets
cvr. min. cvr. min. min. min. min. min. lap cvr. lap cvr. min. min. cvr. lap min. min. min. min. lap cvr. lap cvr.
min. cvr. min. lap
clear
min. min.
min.
cvr cvr cvr
clear min. clear
min. clear clear
min.
min. min.
brackets brackets brackets brackets steel reinf steel steel reinf reinf
rafter rafterprofile** profile**
rafter profile**
min. min.
min. min.
bearer
min.
min.
min.
birdnose
steel reinf.
min. min.
cvr.
brackets
cvr.
cvr.
cvr
min. min.
cvr.min. min.
raking raking raking raking raking raking bearer steel bearersteel bearer bearer steel bearer bearer pailing reinf reinf reinf post fdn. cast brackets
min.
clear clr.
cvr
min. min
cvr
min.
*barrier *barrier *barrier
extg.FFL
extg.
new new min. new new min. threshold threshold match clear threshold threshold clear extg.
min. min. clear clear
pailing pailing cvr. pailing post fdn. post fdn. post fdn. min. cast cast cast bracketsbrackets brackets
min.
min.
cvr
cvr
clear
bird- birdbirdbird- birdnose nose nose nose nose raking brackets min. brackets min. brackets bearer
min. min.
clr. cvr.
cvr
clear
birdnose
min.
min. min.
eave lineeave line
min.
min.
min.
raking rakingraking bearer bearerbearer bolts bolts
bolts bolts bolts bolts
profile**
Lorem ipsum
min.
min.
stringer
stringer
bolts
min. min.
min. min.
min. min.
min.
joist bearer
joist bearer
fixing fixing fixing fixing
min.
min
r
min. min.
bird- bird- birdnosefixing nose fixing nose
eave line eave line eave line eave line
new threshold
min. clear
gap min. min. clear clear flush to extg. FFLcvr. min.
new post thresholdpost
min. post post post post clear
bearer
profile**
profile** Lorem ipsum
stringer
stringer stringer
stringer stringer
stringer stringer
eave line
bolts bolts post
fixing eave line
min.
post
barrier
5 gap
tread nosing tread nosing tread tread profiled profiled
08
plasterboard steel bolt
new post
air cavity air cavity air cavity barrier barrierbarrier
plasterboard plasterboard plasterboard plasterboard plasterboard plasterboard steel str. *barrier steel bolt steel bolt steel steel bolt gapboltgap steel boltgap new steel bolt new new min. min. **barrier threshold threshold threshold clear clear steel str. steel str. str. flushstr. to flush steel to flush to steel str. steel str.steel extg. FFL extg. extg. FFL FFL air cavity
min. clear
plate plate steel str.
steel str.steel str. steel str.
5 gap
post post plate plate plate plate eave line eave is line is eave line is line eave is eave is flush to deck eave line is line flush to flush deck to deck eave line flush to deck eave line eave line tread flush to deck flush to deck tread
rafter
ap gp 55ga
post
plasterboard steel bolt
rafter
rafter profile** rafter profile**rafter rafter profile** rafter profile**rafter profile** profile** profile** rafter profile** rafter profile** rafterrafter rafter profile** rafter profile** profile** barrier p p p la la min. min. min. la min. lap min. lapmin. lap extg. rafter barrier barrier barrier barrier barrier barrier plasterboard plasterboard plasterboard extg. extg. extg. extg. extg. extg. steel bolt steel bolt steel bolt rafter rafter rafter rafter rafter rafter
5 5gagpap
bolts
plate
5 gap
ead
rafter rafter rafter rafter
eave line is flush to deck
plate
eave lineprofiled is flush to deck nosing nosing nosing nosing profiledprofiled profiled profiled fixing fixing fixing
rafter rafter rafter
rafter profile** barrier post extg. rafter profile** rafter profile**rafter profile** rafter profile** rafter profile** rafter profile** rafter min. min. min. min. post post post plate plate plate post cvr. cvr. ispost eave line is line eave eave linecvr. is post cvr. rafter flush to flush deck to deck flush to deck
rafter
tread
nosing
rafter profile**
5 gap
stringer
profile**
Lorem Loremipsum ipsum
profile**
profile**
Lorem ipsum
profiledprofiled profiled
rafter profile**
min. lap
min. lap
min. min. cvr. cvr. tread tread
extg. extg. rafter rafter rafter profile**
5 gap
nosing nosingnosing tread
post post rafter profile**
min. cvr.
extg. rafter
5 gap
profile* cvr. profile* post min.
post
barrier barrierbarrier
5 gap
min. cvr.match profile* profile* cvr. match cvr. profile* profile* cvr. extg. min.extg. min. min. & new & new
min. min. cvr. cvr.
profile** Lorem ipsum
rafter profile**
cvr. tch tch cvr. min. tg. tg. min. new new
min. cvr.
Lorem ipsum profile** profile** Lorem Loremipsum ipsum profile** profile** profile**
profile*
cvr. min.
w
profile** Lorem ipsum
Lorem ipsum
profile**
h
r r
rafter profile**
rafter profile** rafter rafter profile** profile**
cvr. profile* cvr. cvr. tch match profile* profile* min. tg. extg.min. min. new& new
min. lapmin. lampin. lap
cvr.
Portfolio
Assad Jaffer
RISK SEVERITY medium A. wind zone low B. number of storeys low C. roof/wall junction low D. eaves width low E. envelope complexity medium F. decks medium TOTAL SCORE
RISK MATRIX FOR SOUTH ELEVATION -COMPLIES RISK SEVERITY A. wind zone medium low B. number of storeys low C. roof/wall junction medium D. eaves width low E. envelope complexity low F. decks low TOTAL SCORE
Low poly iteration
Structural Optimization
Planar addition to inform Structural optimzation case study
Structural optimization is selecand the current process uses -
Proposal: Roof structure Team: A. balaji, Kurian. Role:
09
Structural Optimization using Inspire 3D Low Poly modelling for Inspire. Re-iterate base conditions for best practice.
uration to force optimization
-
Force optimization to enable Alternatively, this can also be -
tion for wave-form and plane
Portfolio
Assad Jaffer
Aerial robotic assembly for 3D printing. Synchronousity between aerial robot, computer intelligence function and 3D printing mechanism.
Layering as a means for achieving behavour resulting in a loss of material behaviour. Stiffness and quick drying time allow for a generative construction methodology.
Material behaviour research is selective for a 2.5D printing process. While varous material properties were discovered. Conditions for aerial deposition were preferred.
Acheiving grid based behaviour resulted in a lack of structural stability in the printing process. This was later informa-
Material behaviour as a result of printing process as op-
This material mixture was a result of aerial printing behaviour deployment and additive mixture resulting in a stable structure and a successful printing methodology.
Implementing the successful mixture with the printing process in a layered system, we were able to successfully propose a layered aerial 3D printing methodology derived
3D printing mechanism was developed in conjuction with material behaviour. Viscous behaviour that resulted in a quick drying time allowed for material behaviour and aerial deposition.
-
Project Plinthos Team: Rithu, Maria-Eleana, Raissa Role: Aerial Adobe material research. Aerial 3D printing mechanism Robitic Fabrication Process and documentation Robitic Ecology within project proposal; Computer-vision systems implementation Portfolio
printing process as the cross movements of the printing
10 Assad Jaffer
Model sand printed using 2.5D printing process using sand as a temporary support structure. Layering process allows for in conjuction with sand, which acts as a temporary support structure.
Flight behaviour is useful in some level of material behaviour and deposition.
Slumping of the printing material allowed for larger spans of 3D printing and combining this with layering resulted in long-span dune structure.
Computer simulations are able order to build structural methodoly for aerial 3D printing.
Portfolio
Assad Jaffer
areas requiring additional material and areas which are sel-supporting adobe shells.