Lab for Making

Page 1

Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems

General Notes

Sheet Index

1. All work shall conform to the International Building Code and all related documents published by the ICC. Please find these documents in the Bunny Lounge. 2. A letter grade, issued by Laura Briggs upon her inspection of the work contained, shall be submitted to the registrar prior to our long-awaited graduation. 3. All work in the drawing shall be verified for dimension, grade , extent and compatibility to the existing site. Discrepancies are guaranteed. 4. All works contained are done during very late nights, and so these documents are not to be built and are by no means to be considered complete. Build it at your own risk.

Preliminary Site Studies L 101 Climate Studies (Wind, Solar Path, Shadow Cast) L 102 Urban Studies L 103 Landscape Studies L 104 Landscape Plan L 105 Light Studies

Zoning/ Site Statistics

Address: Jewelry District Providence, RI Proposed Use: Lab for Making Occupancy Group: Construction Type: Codes: International Building Code Rhode Island Building Code American Disability Act Federal Accessibility Standards Total Building Area: Total Core Area: Building Perimeter: Building Height: Building Volume:

Architectural A 100 Site Plan A 101 Ground Floor Plan A 102 Typical Floor Plan A 103 Circulation Diagram A 104 Roof Plan A 201 North & South Elevations A 202 East & West Elevations A 301 Cross Section A 302 Longitudinal Section A 303 Small Block Section A 304 Ground Floor West Elevation Detail A 305 West Wall Facade Detail A 306 South Wall Corner Detail A 307 Roof Detail A 400 Principal Wall Sections A 501 Vertical Circulation Detail A 502 Feature Stair Detail A 503 Elevator Core Detail A 700 Interior Detail A 800 Exterior Detail Structural

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making

S 101 Structural Framing Plan Mechanical M 101 Heating Diagram M102 Cooling Diagram Electrical E 101 Electrical Lighting Plan

Symbols

New Mill Building Providence RI Drawing No.

G-001 General Information

Scale: ------------Description:

G 001


Wilfred Leung Adrian Au Melissa Hauser

100

80

Integrated Building Systems

60

40

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Temperature Range

average high mean average low

20

January

February

March

April

May

June

July

August

September

October

November

December

Laboratory for Making

Chart 5 100

80

New Mill Building Providence RI

60

Drawing No.

40

20

L- 101 Climate Studies

Relative Humidity (%) 0 January

February

March

April

May

June

July

August

September

October

November December

Scale:

Description:

Chart 4 2,000

1,500

1,000

500

Direct Normal Radiation Average Daily Total (Btu/sq.ft)

0 January

February

March

April

May

June

July

August

September

October

November

December

L 101


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

L-102 Urban Studies

Scale:

Description:

L 102


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

L- 103 Landscape Studies

Scale:

Description:

L 103


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

L-104 Landscape Plan

Scale:

Description:

L 104


Daylight Factor

Wilfred Leung Adrian Au Melissa Hauser

Type: Reflective Double Pane Window Light Transmittance: 18% Brick Glass %Daylight 9000 3000 2000 700 0.1 0.9 0.162 1458 486 324 113 0.2 0.8 0.144 1296 432 288 101 0.3 0.7 0.126 1134 378 252 88 0.4 0.6 0.108 972 324 216 76 0.5 0.5 0.090 810 270 180 63 0.6 0.4 0.072 648 216 144 50 0.7 0.3 0.054 486 162 108 38 0.8 0.2 0.036 324 108 72 25 0.9 0.1 0.018 162 54 36 13

Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making

Window Size Area of Bay: 20ft *14ft = 280 sq ft Glass Area (sq ft) 0.35 98 0.3 84 0.25 70 0.2 56 0.15 42

New Mill Building Providence RI Drawing No.

L- 106 Light Studies

Scale:

Description:

L 105


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-100 Site Plan

Scale:

Description:

A 100


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-300 Section

Scale:

Description:

Ground Floor

2nd Floor

A 300


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-300 Section

Scale:

Description:

Typical Floor

Roof

A 300


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-103 Circulation Diagram

Scale:

Description:

A 103


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI North Drawing No.

A-201 North South Elevation

Scale:

Description:

South

A 201


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making

East

New Mill Building Providence RI Drawing No.

A-202 East West Elevation

Scale:

Description:

West

A 202


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-301 Cross Section

Scale:

Description:

A 301


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-302 Longitudinal Section

Scale:

Description:

A 302


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-304 West Wall Detail

Scale:

Description:

A 304


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-305 West Roof Detail

Scale:

Description:

A 305


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-306 South Roof Detail

Scale:

Description:

A 306


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-307 Foundation Detail

Scale:

Description:

A 307


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-501 Vertical Circulation

Scale:

Description:

A 501


Wilfred Leung Adrian Au Melissa Hauser

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making

Laboratory for Making

New Mill Building Providence RI

New Mill Building Providence RI Drawing No.

A-300 Section

Drawing No.

A-502 Feature Stair Detail

Scale:

Scale:

Description:

Description:

A 300

A 502


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

A-503 Elevator Core Detail

Scale:

Description:

A 503


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

S-101 Framing Plan

Scale:

Description:

S 101


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

M-101 Heating Diagram

Scale:

Description:

M 101


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

M-102 Cooling Diagram

Scale:

Description:

M 102


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems

Rvalue Rvalue 速

34.39 25 T

Winter

25

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

2.08

Ti 70

Laboratory for Making

Surfaces Area Window East 6029 1176 West 7840 1176 North 1820 1820 South 3326 370 Roof 10240

Heat Loss 33331 35701 41757 12357 18432

BTU/yr BTU/hr

Total Loss 141578 6.4

New Mill Building Providence RI Drawing No.

M-103 West Wall Heating

Scale:

Description:

M 103


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems

Rvalue Rvalue ®

34.39 25 T

Summer

90

2.08

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Ti 75

Rvalue Rvalue ®

Surfaces Area Window East 6029 1176 West 7840 1176 North 1820 1820 South 3326 370 Roof 10240

Heat Gain 11110 11900 13919 4119 6144

Air flow

2788

gain from air solar gain Qfrom ppl BTU/yr BTU/hr

10037 999 56580 Total Gain 126290 5.7

34.39 25 T

Winter

25

2.08

Laboratory for Making

Ti 70

New Mill Building Providence RI

Surfaces Area Window East 6029 1176 West 7840 1176 North 1820 1820 South 3326 370 Roof 10240

Heat Loss 33331 35701 41757 12357 18432

BTU/yr BTU/hr

Drawing No.

M-104 West Wall Cooling

Scale:

Total Loss 141578 6.4

M 104


Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI Drawing No.

M-105 South Roof Cooling

Scale:

Description:

M 105


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.