portfolio.
aditya wiratama Selected Works 2012 - 2017
Aditya Wiratama Portfolio 2017
“ The idea is my own and I have copied from nothing ” Frank Lloyd Wright
Hi, I’m very passionate in Architecture, since I was child I read my Father’s Architectural books for many times. I studied Architecture formally in Tenth of November Institute of Technology. After graduated I decided to works in Hijjas kasturi associates Malaysia, after that I decided to back to my country to works in URBANE indonesia, which is the principal is the mayor of Bandung city. Now, I will continue my journey abroad before build my own Architectural firm in my hometown, Surabaya.
TABLE OF CONTENTS 01. Resume 02. List of project 03. Selected works 04. Photography
01. Resume. ADITYA WIRATAMA Graduate Architect4 years experiences as an Architect
| PERSONAL INFORMATION Nationality Date of birth Sex Mobile Email
1
Indonesia November 26, 1990 Male
+62822 82 22 23 24 adityawiratama11@gmail.com
| PROFESSIONAL SKILLS Auto CAD Sketchup
PHOTOSHOP
COREL DRAW
Indesign
RHINOCEROS
3Ds MAX
PREMIERE
MS. OFFICE
2017
| LANGUAGE SKILLS BAHASA ENGLISH
Portfolio
日本語
| PUBLICATIONS, HONORS AND AWARDS
| INTEREST
Architectural Photograph
Sketch
Traveling
Architectural theory books
2011 1st prize of Tunjungan market competition
2011 Top 50 arbbi design awards
Aditya Wiratama
2016 1st prize homestay "nusantara" competition by Ministry of Tourism category Borobudur
2016 1st prize homestay "nusantara" competition by Ministry of Tourism category Kota tua
2016 2nd prize "Gedung wayang orang" Solo by City Government of Solo
| EDUCATION BACKGROUND 2008-2012 Tenth of november Institute of technology, undergraduate student of Architecture
| WORK EXPERIENCES 2009-2012 Founder, Architect Tatamatra design studio
2013 Intern Architect Hijjas kasturi associates, Sdn. Malaysia
2013-present Founder, furniture designer Ikidami Indonesia
2013-present Architect PT. URBANE indonesia
2009-2010 staff general secretary HIMA Sthapati Architecture ITS (architecture student organization ) 2009-2010 staff, department of external relations HIMA Sthapati Architecture ITS 2009-2010 Chairman, department of external relations HIMA Sthapati Architecture ITS
2009-2010 Staff, Department of internal relations BELM-FTSP ITS (Faculty student organization)
2008-2012 Member BPR V East Java (Community of Architecture student in East Java)
2010-2011 Chairman Forsiga (Community of Architectural photographer)
2008-present Member Kami Arsitek Jengki (Community of "jengki" Architecture enthusiasm)
2
Aditya Wiratama Portfolio 2017
| COMITTE AND ORGANIZATIONS
02. List of projects. Commercial.
Residential.
Pelindo III apartment. Surabaya,2016 on going URBANE
Banyuwangi resort. Banyuwangi,2016 Concept URBANE
Antapani house. Bandung,2016 On going Freelance
Maritime tower. Jakarta,2016 on going URBANE
Tamansari emerald. Surabaya,2015 On going URBANE
Belitung house. Belitung,2016 Hold Freelance
SDA coffeshop. Sidoarjo,2015 Concept Freelance
Ubud waterfall resort. Ubud,2015 On going URBANE
Baciro house. Yogyakarta,2016 Conceptual Freelance
Papinka business park. Ciwaruga,2015 Concept URBANE
PP royal apartment. Surabaya,2015 On going URBANE
Jogja house. Yogyakarta,2016 Conceptual Freelance
Matahariland resort. Ciwaruga,2015 Concept URBANE
Ivillage. Jakarta,2016 On going URBANE
Mahmud residence. Kuala Lumpur,2013 Built Hijjas Kasturi Associates
Ceger apartment. Jakarta,2015 On going URBANE
BDG creative hub. Bandung,2015 On going URBANE
Dago village. Bandung,2013 Concept URBANE
HKR Cawang hq. Jakarta,2015 Concept URBANE
Aruna Indonesia. Yogyakarta,2013 Concept Freelance
Bandungan hotel. Semarang,2015 On going URBANE
Turtle house. Bandung,2013 Concept Freelance
Samawi hotel. Bandung,2013 On going URBANE
Wiyung house. Surabaya,2016 On going Freelance Page
Aditya Wiratama
Portfolio
2017
3
07
Competition.
Religious. Cisarua boarding school. Bandung,2016 Concept URBANE
Titik temu. Jakarta,2016 1ST prize winner Freelance
Babakan seni. Bandung, 2017 Competition entry URBANE
Al Jabar mosque. Bandung,2016 Concept URBANE
Gnomon urip. Borobudur,2016 1ST Prize winner Freelance
Awicarita sriwedari. Solo,2016 2nd prize winner URBANE
Mapolda mosque Bandung,2016 On going URBANE
Weaving the sky. Alor,2016 Competition entry URBANE
Morotai morotia. Morotai,2016 Competition entry Freelance
Shadow impromptu. Bandung,2015 Competition entry Freelance
Elevating erie. Newyork, 2015 Competition entry Freelance
Iftihar boarding school. Bandung,2016 Concept URBANE
Asean secretariat hq. Jakarta,2015 Competition entry Freelance
Dew catcher. Riau,2016 Competition entry Freelance
Sungailiat religious walk. Bangka belitung,2016 Concept URBANE
Tanjungpura university. Tanjung pura,2015 Competition entry Freelance
Gelanggang Gajahmada. Yogyakarta, 2015 Competition entry Freelance
ADWF boarding school. 2013 Concept freelance
Layers of evolution. Pacitan,2015 Competition entry URBANE
Sembalun lawang. Sembalun lawang,2015 Competition entry Freelance
Tama school. Surabaya,2011 Concept freelance
Al Rajhi mosque. Riyadh,2013 Competition entry Hijjas Kasturi Associates
Regenerating cell (human + ecology). Bandung,2015 Competition entry
4
Pasar tunjungan. Surabaya,2012 2nd prize winner Freelance
Aditya Wiratama
Lightning flash. Kuala lumpur,2013 Competition entry Hijjas Kasturi Associates
Portfolio
2017
Makassar mosque. Makassar,2016 Concept URBANE
Aditya Wiratama Portfolio 2017
03. Selected works.
5
residential. commercial. religious. competitions.
Belitung House
Wiyung House
Portfolio
2017
6
Aditya Wiratama
Shadow Impromptu
| TYPE Residential
7
| LOCATION Surabaya Indonesia
| SITE AREA 260 m2
| BUILT AREA 200 m2
| HEIGHT
| YEAR
2 Storeys
2015
Wiyung House.
Aditya Wiratama
Portfolio
2017
A House that I designed for my parents Designed with love, memories from the previous one and plan for the better future.
| TEAM Freelance : Aditya Wiratama
Aditya Wiratama Portfolio 2017
8
Skylight.
There are skylights that extend along the main hall to make the atmosphere inside the house to be bright, this is due to the many activities undertaken in this room such as cooking, eating, chatting, and many others. The use of exposed concrete material adds accentuation to the room due to the dominant white color in this room.
Aditya Wiratama
Portfolio
2017
9
Aditya Wiratama
Portfolio
2017
Shadow in Living Room .
10
Aditya Wiratama Portfolio 2017
11
Customize skin.
Aditya Wiratama
Portfolio
2017
Inner court.
12
Floor plan.
| TYPE Residential
13
| LOCATION Bandung Indonesia
| SITE AREA 260 m2
| BUILT AREA 200 m2
| HEIGHT
| YEAR
2 Storeys
2017
Dago Village.
Aditya Wiratama
Portfolio
2017
Villa Verde, Inovative Construction with Traditional Adaptation.
| TEAM URBANE : Ahmad D Tardiyana Aditya Wiratama
Aditya Wiratama Portfolio 2017
14
Aditya Wiratama
Portfolio
2017
15
Perspective sketch. Section.
Front Elevation. Structure diagram. Front perspective.
Aditya Wiratama Portfolio 2017
16
Aditya Wiratama
Portfolio
2017
3
17
6
7
Cluster view. Exploded axonometry (structure and roof). Floor plan.
Aditya Wiratama
Portfolio
2017
18
| TYPE Residential
19
| LOCATION Belitung Indonesia
| SITE AREA 207 m2
| BUILT AREA 200 m2
| HEIGHT
| YEAR
2 Storeys
2015
| TEAM Freelance : Aditya Wiratama
Belitung House.
Aditya Wiratama
Portfolio
2017
The big idea is to makes the space in between two buildings more interesting. This space not only connecting two buildings but also makes something blurry between outdoor and indoor space.
Aditya Wiratama Portfolio 2017
1
20
1st phase
Aditya Wiratama Portfolio 2017
21
3
This building has two phases, the first phase is the main building that covers all the space needs, the next phase is the addition of rooms to be built next to the first phase. That condition will create a space between the two buildings that can be utilized as outdoor area.
2nd phase
Space in between
Aditya Wiratama Portfolio 2017
22
4
Front perspective.
Aditya Wiratama Portfolio 2017
Floor plan. Bed room.
23
Aditya Wiratama Portfolio 2017
Outdoor terrace.
24
| TYPE Residential
25
| LOCATION Yogyakarta Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
3 Storeys
2013
Aruna Indonesia.
Aditya Wiratama
Portfolio
2017
Our future dream house.
| TEAM Freelance : Aditya Wiratama
Aditya Wiratama Portfolio 2017
26
Aditya Wiratama Portfolio 2017
Sketch concept. Elevation.
27
This location is strategic enough for us, after searching for so many Beach, it seems this beach is quite okay to live in, because the location is on the top Beach and under the hill, and it takesjustover1hourtogettotown Yogyakarta, but it is also because it is an area with parangtritis make this beach is good enough serve as a means of tourist attraction, making it possible to Made resort here
Location.
Circulation.
Zoning.
Site orientation.
28
Zoning mass.
Wind path.
Aditya Wiratama Portfolio 2017
Sun path.
Aditya Wiratama
Portfolio
2017
29
Aditya Wiratama Portfolio 2017
30
Aditya Wiratama Portfolio 2017
03. Selected works.
31
residential. commercial. religious. competitions.
Tamansari Emerald PP Royal Apartment Dago Village
Aditya Wiratama
Maritim Tower
Portfolio
2017
32
| TYPE Mixed use
33
| LOCATION Surabaya Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
42 Storeys
2015
Tamansari Emerald.
Aditya Wiratama
Portfolio
2017
A better quality living environment for now and the future.
| TEAM URBANE : Ade Yudirianto Aditya Wiratama
Aditya Wiratama Portfolio 2017
34
Building concept. Swimming pool. Outdoor Environmental.
Aditya Wiratama Portfolio 2017
35
Indoor Environmental Quality.
Material & Resources.
Location & Linkages.
Climate Response.
Aditya Wiratama Portfolio 2017
36
Lift lobby. Entrance. Exterior perspective
Aditya Wiratama Portfolio 2017
37
Aditya Wiratama Portfolio 2017
38
| TYPE Commercial
39
| LOCATION Jakarta Indonesia
| SITE AREA 5.400 m2
| BUILT AREA - m2
| HEIGHT
| YEAR
30 Storeys
2016
Maritim Tower.
Aditya Wiratama
Portfolio
2017
This tower has skin that inspired from fish gill which in application serves to protect the building from the sun heat.
| TEAM URBANE
Aditya Wiratama Portfolio 2017
40
Lift lobby. Entrance. Exterior perspective.
Aditya Wiratama
Portfolio
2017
41
Aditya Wiratama
Portfolio
2017
42
Aditya Wiratama Portfolio 2017
43
Aditya Wiratama
Portfolio
2017
44
Exterior perspective. Outdoor area. Core details.
| TYPE Mixed use
45
| LOCATION Surabaya Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
42 Storeys
2015
Royal Surabaya.
Aditya Wiratama
Portfolio
2017
This tower located nearby the Tanjong perak port in Surabaya. The concept is to maximize sequences to surrounding area and also in order to respond the condition of the site, the podium designed like quarter circle.
| TEAM URBANE : Ade Yudirianto Aditya Wiratama
Aditya Wiratama Portfolio 2017
46
Aditya Wiratama Portfolio 2017
View from balcony.
47 4
Aditya Wiratama Portfolio 2017
Swimming pool.
48
Aditya Wiratama Portfolio 2017
49
Outdoor area. Swimming pool. Exterior perspective
Aditya Wiratama Portfolio 2017
50
| TYPE Hotel
51
| LOCATION Bandung Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
5 Storeys
2013
Samawi Hotel.
Aditya Wiratama
Portfolio
2017
SAMAWI HOTEL, The concept of “Village” which inspired Dago Village is adopting environmentally Kampung ecosystem characters, which is,grow and evolve organically and naturally follow the social conditions, culture and local nature.
| TEAM URBANE : Achmad D Tardiyana Aditya Wiratama
Aditya Wiratama Portfolio 2017
52
Block plan area. Swimming pool area.
Aditya Wiratama
Portfolio
2017
53
Facade concept. Mass study. Main lobby.
Aditya Wiratama Portfolio 2017
54
Aditya Wiratama Portfolio 2017
Aerial view.
55
Aditya Wiratama Portfolio 2017
56
Aditya Wiratama Portfolio 2017
03. Selected works.
57
residential. commercial. religious. competitions.
Portfolio
2017
58
Bintang samudra Al Jabar Mosque Cisarua Boarding school
Aditya Wiratama
Al Rajhi Mosque
| TYPE Worship place
59
| LOCATION Riyadh
| SITE AREA 6.447 m2
| BUILT AREA 6.164 m2
| HEIGHT
| YEAR
2 Storeys
2013
2017 Portfolio
Hijjas Kasturi Associates Sdn.
Sheikh Saleh Al-rajhi Mosque. In approaching the design brief for the new Sheikh Saleh Al-Rahji Mosque, we were keen to take the journey back to the ‘Fitrah’ of the relationship between Allah SWT and His servants. The concept of Du’a was the starting point in deriving this new proposal. The simple gesture of open hands turned with the palm facing upwards while reciting the Du’a and facing Qibla expresses the submission to Allah SWT that is taking place on a spiritual level.
Aditya Wiratama
| TEAM
Aditya Wiratama Portfolio 2017
60
Solar Analysis.
Structural Concept.
Deformed shape of horizontal plate - ground
Traffic.
Climate.
Deformed shape of horizontal plate - level 1
Landscape.
Vicinity.
61
Aditya Wiratama
Portfolio
2017
Mass.
Shape.
Concept.
Form.
Response.
Signature Form / Design.
Conventional RC flat slab.
RC flat slab with Bubble deck.
Flat slab with Bubble deck & Radiant cooling.
Conventional RC flat slab construction is improved through the use of Pulverized Fly Ash and recycled aggregates Recommended 30% replacement by PFA
By introducing void formers into the slab, concrete is removed from areas of low stress, reducing the overall amount of steel & concrete used.
The void formers can be combined with the radiant cooling system to take advantage of the thermal mass of the concrete, reducing its operational emissions too.
Embodied Carbon content 133 kg/m² kg CO2e/m²
Embodied Carbon content 75 kg CO2e/m²
Floor plates.
Fins and arches
These transfer the gravity loads to the core walls and the columns. The more sustainable voided deck option offers the added structural advantage of reducing the self weight of the concrete floors, with the advantage of reduced column sizes and reduced foundation loads.
RC Wall Stell Strut RC Flat Slab RC Column
62
The 10 fins which form the array of elements that define the roof, span across a column free space that varies from 20m to 40m. Due to the curving form, the gravity loads from roof impose an eccentric moment on the fin that deforms and de-stabilises the fin both laterally and vertically. 2017
The floor plates consist of grade 35 reinforced concrete flat slabs of thickness 275mm or void formed RC deck of thickness 300mm.
RC Fin
Portfolio
275mm thk flat slab
Embodied Carbon content 75 kg CO2e/m² Operational Carbon reduction 11kg CO2e/m²/year
Aditya Wiratama
300mm thk flat slab
Slab concept. Structural anatomy. Section.
Aditya Wiratama
Portfolio
2017
63
Aerial view. Heat distribution. Prayer hall.
Aditya Wiratama Portfolio 2017
64
| TYPE Boarding school
65
| LOCATION Cisarua, Bogor Indonesia
| SITE AREA 12.000 m2
| BUILT AREA - m2
| HEIGHT
| YEAR
2 Storeys
2017
cisarua boarding school.
Aditya Wiratama
Portfolio
2017
A boarding school that will provide a better generation for the future
| TEAM URBANE : Angga Lathief Aditya Wiratama
Aditya Wiratama Portfolio 2017
66
Mosque section. Mosque exterior.
Aditya Wiratama Portfolio 2017
67
Slab concept. Structural anatomy. Section.
Aditya Wiratama Portfolio 2017
68
Aditya Wiratama Portfolio 2017
69
Aditya Wiratama Portfolio 2017
70
| TYPE Worship place
71
| LOCATION Bandung
| SITE AREA 20.000 m2
| BUILT AREA 35.000 m2
| HEIGHT
| YEAR
2 Storeys
2014
Al - Jabar Mosque.
Aditya Wiratama
Portfolio
2017
The biggest Mosque in West Java, Indonesia
| TEAM URBANE
Aditya Wiratama Portfolio 2017
72
Aditya Wiratama Portfolio 2017
View from lake.
73
Aditya Wiratama Portfolio 2017
Aerial view. Side perspective.
74
Aditya Wiratama Portfolio 2017
75
Prayer room. Bunk bed.
Aditya Wiratama Portfolio 2017
76
| TYPE Worship place
77
| LOCATION Sungai liat Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
2 Storeys
2014
Bintang Samudra.
Aditya Wiratama
Portfolio
2017
Religious tourism park, Sungai liat.
| TEAM URBANE
Aditya Wiratama Portfolio 2017
78
Aditya Wiratama Portfolio 2017
79
Slab concept. Structural anatomy. Section.
Aditya Wiratama Portfolio 2017
80
Aditya Wiratama Portfolio 2017
81
Mosque section. Mosque exterior.
Aditya Wiratama Portfolio 2017
82
Aditya Wiratama Portfolio 2017
03. Selected works.
83
residential. commercial. religious. competitions.
Remembrance of erie
Dew catcher Weaving the sky pasar toendjoengan.
Layers of evolution Gnomon urip Awicarita sriwedari Shadow impromptu Weaving the nation
Aditya Wiratama
Lightning flash Bintang samudra
Portfolio
2017
84
| TYPE Homestay
85
| LOCATION Borobudur Indonesia
| SITE AREA - m2
| BUILT AREA 36 m2
| HEIGHT
| YEAR
2 Storeys
2016
gnomon urip.
Aditya Wiratama
Portfolio
2017
Besides being a tourist spot and worship, Borobudur also has an influence on the science of astronomy, one of them is a time marker or commonly called gnomon.
| TEAM Aditya wiratama Tb Dimas dianggara putra Rizky rachmadanti
Aditya Wiratama Portfolio 2017
86
location.
cluster characteristic.
"Desa Wanurejo" is gate to reach Borobudur, it's only 600 meters from Borobudur area, so that, tourists will come to this village by themself, there are also many activities for tourist such as walking or cycling around the village , or see cultural performances that held annually by 9 "Dusun" in this village.
Aditya Wiratama Portfolio 2017
87
punden berundak.
modular type.
massing.
materiality.
Layers of acitivity.
gnomon urip
family cluster
village area
padi field
borobudur
Aditya Wiratama Portfolio 2017
Gnomon. Front view.
88
Aditya Wiratama
Portfolio
2017
89
Aditya Wiratama
Portfolio
2017
90
Village ambience. Floor plan. Section.
| TYPE Residential
91
| LOCATION Bandung Indonesia
| SITE AREA 260 m2
| BUILT AREA 200 m2
| HEIGHT
| YEAR
2 Storeys
2017
| TEAM Aditya Wiratama Nugraha Saputra
shadow Impromptu.
Aditya Wiratama
Portfolio
2017
To create innovative and sustainable work, we breakdowns the elements that can create something sustain, The first things is, the building should constructed and dismantled easily, other things is reduce artificial lighting to make all the rooms get natural light, and also, natural air thoroughly to the whole building, so it does not need air conditioners, and has a wide range of vista , Finnally, use environmentally friendly materials in this case using conwood as a substitute for wood materials.
Aditya Wiratama Portfolio 2017
92
Perspective section. Skin concept. Health and green concept.
Aditya Wiratama
Portfolio
2017
93
Portfolio
2017
94
Airflow.
Vista.
Circulation.
Drainage. Aditya Wiratama
Daylighting.
Floor plan. Living room.
This building is designed to be built easily and at certain times can be easily dismantled as well, because the design of this building almost all the space has an outward orientation so that all the rooms use screen, windows and doors that can be installed and dismantled easily, of course this is easier compared to buildings that have many massive walls.
Aditya Wiratama Portfolio 2017
95
Aditya Wiratama Portfolio 2017
96
Main entrance. Section.
| TYPE Museum
| LOCATION Pacitan Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
3 Storeys
2015
layers of evolution. 97
Aditya Wiratama
Portfolio
2017
The concept is a contemporary museum is often translated as a public space that is designed with the approach of an “event� by the architects. So that public spaces are flexible and dynamic to the activities of the local public as well as specific activities of the museum can be accommodated well. The public rooms are also articulated as the linchpin of the entire complex early this area As a great idea, the layers often describe a stage, and in the context of ancient civilization, the soil layer on the historic sites are tehapan his instructional media evolution of human civilization from time to time.
| TEAM URBANE: Achmad D Tardiyana Adli nadia Aditya Wiratama Hendryana Sudarman Nugraha Saputra
Aditya Wiratama Portfolio 2017
98
Block plan.
Orientation.
Shape of focus.
Horizontal timeline.
Vocal point concept.
Plaza concept.
Building zoning.
See through laboratorium.
Material & locality.
Isometric plan.
99
Aditya Wiratama
Portfolio
2017
Water plaza.
Building concept.
Open air plaza.
Stone plaza.
.The layers of the earth is translated into the language of architecture as space staircase structure gradually into the bowels of the earth and invites visitors to dive into the cave and back feel ancient times. As the binder layers such space, a neutral and rational geometry (square) is placed at the entrance to the cave that also functions as a gate of a time machine that gives the experience of “now” and “past” spatially.
Right and left side of the building.
Entrance area.
Water plaza.
Activities in plaza.
Stone plaza.
Deck panorama.
Materiality area.
Circulation.
axis
zoning
100
Aditya Wiratama
Portfolio
2017
Aerial view.
Ground Floor Plan.
Lower ground floor plan.
101
Portfolio
2017
3rd Floor plan.
Aditya Wiratama
Site section 2.
Stalactites Implementation for Interior.
Laboratory.
Mess Corridor.
Lobby.
102
Portfolio
2017
Exhibition Room.
Aditya Wiratama
Site section.
| TYPE Museum
| LOCATION Pacitan Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
3 Storeys
2015
weaving the nation.
Aditya Wiratama
Portfolio
2017
103 Woven fabrics for clothes are among the most commonly used in South East Asia. Eventhough there are some differences in motives and expressions, they share similar techniques and methods of weaving. So weaving the nations in the context of ASEAN is the notion that given the differences in customs and cultures, ASEAN should be fabrics that hold all the members together in harmony. In this context, the ASEC building is a meeting place where all issues and concerns of all member are discussed, debated, and reconciled. In short, all the issues and concerns are woven to strenghten the association.
| TEAM URBANE: Achmad D Tardiyana Adli nadia Aditya Wiratama Hendryana Sudarman Nugraha Saputra
Aditya Wiratama Portfolio 2017
104
Anyaman as continuity. In the architectural level, weaving is translated as a continuity or a continuous thread. This notion in this complex of buildings are represented in three form: 1. Continuity at the city scale: circulation and movement of people, vehicles and public transport (The site is located at the intersection or roads, MRT and busway) are integrated into a system of circulation. It can separated or coexist. 2. Continuity at the scale of building: the old and the new building are connected in various ways functionally and spatially. The complexity of various users and uses are subtly interwoven in various scales and levels 3. Continuity in the details of buildings mostly visible in the form of weaving pattern on the surface of the multi function and public building (gallery, multi purpose hall, ballroom, meeting rooms) wich graciuosly perch on the ridge of the “rice terraces�. This also symbolizes the continuity of rice tradition which significantly ties all the members
1
3
2
105 Programming.
Portfolio
2017
Public area.
Circulation. Aditya Wiratama
Pedestrian.
Vehicle.
Vertical circulation.
Mass concept.
Exterior perspective
Aditya Wiratama
Portfolio
2017
106
Aditya Wiratama Portfolio 2017
107
Aditya Wiratama Portfolio 2017
108
Aerial view. Interior lobby. Man eye view.
| TYPE Museum
| LOCATION Pacitan Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
3 Storeys
2015
awicarita sriwedari. 109
Aditya Wiratama
Portfolio
2017
Traditional Puppet Theater Building of Surakarta
| TEAM URBANE: Achmad D Tardiyana Adli nadia Aditya Wiratama Hendryana Sudarman Nugraha Saputra
Aditya Wiratama Portfolio 2017
110
Sriwedari typology.
Location.
King’s garden (the beginning).
Amusement park (present).
Cultural park (proposal).
Surakarta’s cosmis. toko buku gedungsriwedari
PERPUSTAKAAN
2017
tribun
MUSEUM
PESISIR
Portfolio
food stall
MANCANAGARA
SAMUDRA & TANAHSABRAN
Aditya Wiratama
TAMAN
tribun
gedungsriwedari rencana masjid
stadion
NAGARAAGUNG
TAMAN
teaterwayangorang
galeri
DALEMPRABASUYASA
tribun
111
restoran
tribun
Awicarita has the meaning of “good at telling stories”, while Arwicarita Sriwedari has the meaning of “Sriwedari heritage area that tells story”. As the basis for thinking in designing the Wayang Orang Performance Building, the keyword “story” is developed into 3 main elements: 1. “Stories” about manners that are conveyed through the staging of the wayang orang plays (mahabarata, ramayana, etc.) 2. “Stories” about the history and origins of Javanese wayang art through galleries, libraries, museums, and the absorption of Javanese architectural concepts and geometry (building symbolism, proportion, spatial structure to roof structure system). 3. “Stories” that motivate the community about the importance of preserving the wayang orang art through the restoration of the function of the people’s entertainment park in the area of Sriwedari into a cultural park. In relation to the preservation of the wayang orang art, the concept of staging is also restored as the early art of wayang orang was created, with the consequence of minimizing the use of sophisticated technology such as video mapping as supporting the show, but still consider the factor of audio visual comfort.
Aditya Wiratama Portfolio 2017
112
People circulation.
Structural concept. Closing Roof Tile Clay to strengthen the character of Solo city tradition.
“Kaso� from Canal C in wood with wooden battens 3/4 as clay roof tiles buffer.
Roof structure using mono beam steel structure with the largest size IWF 1000 profile wood coated as the main structure of the roof.
Tribune Structure using reinforced concrete structure plate.
The buffer structure of the spectator stands using a reinforced concrete structure.
Main Building Structure uses a reinforced concrete structure with the largest column diameter of 1.00 m with finishing using exposed concrete.
Aditya Wiratama
Portfolio
2017
113
Section.
Aditya Wiratama
Portfolio
2017
Main theater.
114
| TYPE Office tower
| LOCATION Petaling Jaya Malaysia
| SITE AREA 6.110 m2
| BUILT AREA 1.927 m2
| HEIGHT
| YEAR
41 Storeys
2013
lightning flash. 115
Aditya Wiratama
Portfolio
2017
In this proposal, there are two ingress & egress points. The drop off is at the main ingress which is located at the eastern road while service vehicles enter and exit the basement by the southern road. There is also a secondary dropoff through the southern route
| TEAM Hjjas kasturi Associates
Aditya Wiratama Portfolio 2017
116
1. Basic massing.
Circulation.
Aditya Wiratama Portfolio 2017
117
The tower is a rectangular planning with the core in its center to allow optimum space and circulation at its perimeter. As it rises, the plan maintains its geometry but slides gradually to form the lightning bolt elevation.
The tower has two self-regulated system which is the electrical and water system. Resources are collected respectively and kept within the storage areas.
2. Splitting of form.
Green concept.
3. Protrusion of points.
4. Final strike form.
118
We must provide an urban space that embraces PJ Central as the revitalised hub of Petaling Jaya – through urban regeneration. This regeneration aspect of urban life helps promote design excellence, as well as establishing social and economical wellbeing through GBI and LEED.
As one of the key buildings that defines the new PJ skyline, the proposed TNB Tower embodies not only the vision of PJ Sentral but also its own core values as Malaysia’s largest electrical utility company.
The main feature of the tower is its movements of the surfaces, as if a lightning striking the ground. Its distinctive shape makes it a bold and symbolic form, a very strong representation of the company it serves
Aditya Wiratama Portfolio 2017
The future of the way we live, work and play will be guided by our social infrastructures.
Our goal is to create a landmark that exemplifies TNB’s vision to be a leading global player in energy and relating businesses.
Exterior perspective.
Aditya Wiratama
Portfolio
2017
119
Kinetics of friction.
Solidifying the strike-form.
Such that a lightning is created through a friction of two clouds, the tower is divided into 2 parts, with its core at the centre for optimized circulation.
The movement of the lightning is obtained by protruding and pushing points of the towers, without disturbing the central structure. The points are emphasized by adding public green spaces on these levels
Conventional RC flat slab.
RC flat slab with Bubble deck.
Flat slab with Bubble deck & Radiant cooling.
Conventional RC flat slab construction is improved through the use of Pulverized Fly Ash and recycled aggregates Recommended 30% replacement by PFA
By introducing void formers into the slab, concrete is removed from areas of low stress, reducing the overall amount of steel & concrete used.
The void formers can be combined with the radiant cooling system to take advantage of the thermal mass of the concrete, reducing its operational emissions too.
Embodied Carbon content 133 kg/m² kg CO2e/m²
Embodied Carbon content 75 kg CO2e/m²
slab and core.
120
2017
exoskeleton.
Portfolio
frame.
Aditya Wiratama
skin.
Embodied Carbon content 75 kg CO2e/m² Operational Carbon reduction 11kg CO2e/m²/year
| TYPE Airport
| LOCATION Alor Indonesia
| SITE AREA - m2
| BUILT AREA 4.330 m2
| HEIGHT
| YEAR
3 Storeys
2015
| TEAM URBANE: Achmad D Tardiyana Adli nadia Aditya Wiratama Hendryana Sudarman Nugraha Saputra
weaving the sky. 121
Aditya Wiratama
Portfolio
2017
Indonesia as the largest archipelago state in the world needs more variety in infrastructure to connected the whole of its islands. Airport is the most reasonable solution to solve this problem.
Aditya Wiratama Portfolio 2017
122
View from the hill. Perspective section.
Aditya Wiratama
Portfolio
2017
123
Location of this project is in Alor Island that is one of beautiful place in East Indonesia. Many cultural village could be find in this island, one of them is Takpala village.
Dropoff area.
Furthermore, Alor island could be accessed from Australia and Bali Island. Base on this consideration, the regional government has a plan to upgrade their Local Airport into an International Airport.
Aditya Wiratama Portfolio 2017
124
Aditya Wiratama Portfolio 2017
125
Aerial view. Waiting room. Perspective section.
Aditya Wiratama Portfolio 2017
126
| TYPE Infrastructure
| LOCATION Pekanbaru Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
5 Storeys
2015
| TEAM Aditya wiratama M. Iqbal Tawaqal Yudha Prasetyo
dew catcher. 127
Aditya Wiratama
Portfolio
2017
The concept is a contemporary museum is often translated as a public space that is designed with the approach of an “event” by the architects. So that public spaces are flexible and dynamic to the activities of the local public as well as specific activities of the museum can be accommodated well. The public rooms are also articulated as the linchpin of the entire complex early this area. As a great idea, the layers often describe a stage, and in the context of ancient civilization, the soil layer on the historic sites are tehapan his instructional media evolution of human civilization from time to time. The layers of the earth is translated into the language of architecture as space staircase structure gradually into the bowels of the earth and invites visitors to dive into the cave and back feel ancient times. As the binder layers such space, a neutral and rational geometry (square) is placed at the entrance to the cave that also functions as a gate of a time machine that gives the experience of “now” and “past” spatially.
Aditya Wiratama Portfolio 2017
128
Issues.
Smoke disaster that hit large parts of western Indonesia and several ASEAN countries generally occurs during the dry season along the eastern coast of the Sumatra island. Peat soil condition which has many roots and fibers cause soil and grass burn easily when dry season. Palm oil plantations companies also had a big hand in making this haze disaster, and the condition of the boundary between the palm oil plantation and forest conservation in critical condition. Local also trigger to this haze disaster while they have land clearing for they plantation. Hotspot soared each year along with the growth of palm oil plantations. Urban conditions surrounded by hotspot are also affected, transportation delays, health problems of many citizens and residents, and also disrupted activities like school, office and bank.
Dew catcher.
Factor.
129
2013
2015
Portfolio
2017
2011
Aditya Wiratama
Pekanbaru city typology. critical zone / grey zone.
forest.
palm oil plantation.
smoke zone.
rural.
city centre.
critical zone / grey zone.
rural.
palm oil plantation.
forest.
Networks strategic.
Diagram concept. air humidity.
dew.
catch by net.
rain.
water drops.
supply for emergency tank.
supply for irrigation canal.
water supply for fire fighter.
Frontline Type network. Frontline type network shape guard lines between hotspot, forest or conserves areas and palm oil plantation. Preventing the fire and preventing hotspot to spread out to larger areas. This type have forest ranger post for accomodation, maintenance, for watch tower and control the supporting tower. Frontline type integrated with irrigation water canal and placed along the irrigation water canal.
130 filtration to soil.
Supporting Type network. Supporting type have same shape with frontline type but this type is smaller than frontline type and doesn’t have a forest ranger post. This network provide water supply for fire fighter in the vast and remote areas without irrigation water canal. Several supporting type controlled from Frontline tower.
makes soil wet and difficult to be burned.
Portfolio Aditya Wiratama
City defender type network placed in the neighbourhood, urban areas, along the road, and where the people are live in. This network aims for cities resilience from haze and reducing the haze. Defender type network managed by people in one neighborhood, local community,local authority, atau or several company.
2017
City Defender Type network.
Capacity.
Structure
Frontline type.
Supporting type.
Main structure.
Net structure & plat base.
Main structure.
Net structure & plat base.
Defender type.
Networks maintenance.
Aditya Wiratama
Portfolio
2017
131
Forest ranger team would control and maintenance one of the Frontline large type which there are already equipped with ranger posts and replacement tools for maintenance. Therefore, 4 supporting type would located scattered but under control and surveillance from frontline tower.
Defender type network managed by people in one neighborhood which consist of one leader and several household where live under the Defender tower. Defender tower have limited range for spray water and reduced haze in small area so the cities would have several tower which placed in every neighborhood. This strategic would shape defender tower network which spray together and make a shower to reduced haze problems.
Aditya Wiratama Portfolio 2017
Defender type
132
| TYPE Market
| LOCATION Surabaya Indonesia
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT
| YEAR
2 Storeys
2012
| TEAM Aditya Wiratama Angga Acdha R
pasar toendjoengan. 133
Aditya Wiratama
Portfolio
2017
Jalan tunjungan is a very famous street in the city of Surabaya, the revitalization of this tunjungan market is an attempt to make Surabaya famous for the song mlaku-mlaku nang Tunjungan back alive and not just be just a song, Because the concept is how to make this building is not memorable as the building and also walkable so that people who visit it not like visiting the mall that the impression of exclusive and full-oriented to the vehicle, here preferred for pedestrians, but it also makes a building that is not like a building This is glowing at night because the characteristic of Surabaya is sparkling Surabaya, well, rather than making a mall that is already mushrooming in this hero city, better create a walking area in this area!
Aditya Wiratama Portfolio 2017
134
Characteristic. Structural concept. green.
bonek (football suporters) .
sparkling. Surabaya. “mlaku-mlaku� cultural (strolling). bicycle.
alucopan.
135 hollow iron frame.
Aditya Wiratama
Portfolio
2017
WF steel
concrete
WF steel
Concept. Interior.
circulation.
circulation + building.
final.
136
Aditya Wiratama Portfolio 2017
connector.
Aditya Wiratama
Portfolio
2017
137
Aditya Wiratama Portfolio 2017
138
Perspective view. Section.
| TYPE Infrastructure
| LOCATION Pennsylvania U.S
| SITE AREA - m2
| BUILT AREA - m2
| HEIGHT -
| YEAR 2015
| TEAM Aditya Wiratama M. Iqbal Tawakal Melvina Pramadya P Yudha Prasetyo
remembrance of erie. 139 In the past, Erie canal brought important figure for Syracuse city. The figure as artery of transportation which connected Syracuse city to another cities in America by water transportation. Even though the current Erie canal condition mostly was cover by land but the spirit of Erie canal still exist in the heart of Syracuse citizen. So that, bring back the spirit as artery connection activity as in the past is a strategy for developing the site.
Aditya Wiratama
Portfolio
2017
Not only, Imagine that visitor will enjoy trail exploration with attractive activity such as ice skating park, outdoor swimming pool, community sharing park, gallery, outdoor movie park, parade yard and other possible activity but also the design keep sustainable environment.
Aditya Wiratama
Portfolio
2017
140
Issue. Less Spirit ex Erie Canal.
Vehicle Domination.
Inactive Commercial Activities. Less Activity in Human Scale. Urban Sprawl.
Solutions. Remembering Erie Canal.
Nodes Character.
Compact Corridor.
Connecting line.
Ecological Corridor.
Block site.
141
Boulevard erie road.
Section
Boulevard erie road.
Section
2017
Boulevard erie road.
Aditya Wiratama
Portfolio
Branch site.
Bridge site.
Reservoir Nodes.
Community sharing space. Block site has potential attractive as meeting point. The site character has pocket typology site that opportunity to provide public space with collecting access point on the site. So that, It will be great response to develop the site with sharing community concept. Sharing community concept with “Field of joy ambiance“ has strategy to provide public space for variety of activity such as open air theatre, city food festival, sun batting park, library, and other society possible activity. For Parking, the design provide “Park and Ride” typology that is integrated parking building with pedestrian way, bike shelter, bus stop. So that visitor can start exploring from the site by bike or foot to next site.
Concepts.
Connecting all urban zone.
Flow area.
Block Site Masterplan. 1. Field of Joy 2 2. Mix used retail 3 3. Erie Gallery 4. “Park n Ride” 5 (Parking structure & bike shelter) 5. Space for watch street parade
1
4
Possible bike Lane.
Gallery.
142
Field Of Joy
2017
Space for watch street parade
water collector. gallery.
water tank.
field of joy.
trail lane.
Aditya Wiratama
Portfolio
Bike Lane birds shelter.
Eco edutainment. Look at the existing environmental condition on Branch site, It will be good idea to propose this area with Eco-edutainment concept. The design is focused not only for remembering Erie Canal spirit but also give positive impact to nature and education. In this site visitor would be fun with attractive activity such as historical trilling, nature observation in circle observation, shooting photo of birds, outdoor swimming, playing ice skating, and barbecue outdoor party.
6 2 3
1
Our consideration of biodiversity that realized with limited hard construction, for examples bike way along the site design is elevated, filtration circle for waste water management, and island for nature revitalization.
5 2 1
Concepts.
4
View and interaction.
Access.
Branch Site Masterplan. 1. Circle pool park 2. Artificial island coversation 3. Water filter 4. Observation tower & snowboarding 5. Trail line (pedestrian and bike way) 6. Parking 7. Forest park
Zones.
Pond banks.
143
Elevated trail line.
2017
Amphiteater.
Aditya Wiratama
Portfolio
Nature pool park.
Artificial conservation island Trail lane Forest park.
Nature pool park.
Community sharing space. Bridge site has great environmental condition that over 70% area is covered by green space. So that, the design consider to keep quality of nature. The first strategy avoid hard construction in land, such as we propose elevated construction for pedestrian and bike bridge way. Then, the second strategy is nature connectivity that means we propose area as bridge not only for humans but also for animals. The last strategy is stimulated visitor to more care with nature with fun way. That is provide circle observation. In summer this area can use for biotic observation but in winter season it will be ice skating park. Overall to make unity of Erie canal story, all of the point site have pedestrian and bike way for connecting. It will stimulate for exploring Erie event activity.
Concepts.
View and interaction.
Access.
1. Field of Joy 2. Mix used retail 3. Erie Gallery 4. “Park n Ride� (Parking structure & bike shelter) 5. Space for watch street parade
1
2 3
4
Zones.
Riverside trail lane.
Active circle park.
Pedestrian and bike bridge.
144
Trail lane
Reforestation Outdoor iceskating park
Observation deck
Aditya Wiratama
Portfolio
2017
Pedestrian and bike bridge.
04. Photography.
Japan
Aditya Wiratama
Portfolio
2017
145
Singapore
Aditya Wiratama Portfolio 2017
146
Aditya Wiratama Portfolio 2017
147
Aditya Wiratama Portfolio 2017
Japan.
148
Aditya Wiratama Portfolio 2017
149
Aditya Wiratama Portfolio 2017
150
Tokyo big sight.
Aditya Wiratama Portfolio 2017
151
Expo 70’s commemorative park.
Aditya Wiratama Portfolio 2017
152
Aditya Wiratama Portfolio 2017
Sayamaike museum.
153
Aditya Wiratama Portfolio 2017
154
Aditya Wiratama Portfolio 2017
155
Aditya Wiratama Portfolio 2017
Jiyu gakuen myonichikan.
156
Aditya Wiratama Portfolio 2017
157
Aditya Wiratama Portfolio 2017
Singapore.
158
Aditya Wiratama Portfolio 2017
159
Aditya Wiratama Portfolio 2017
160
Aditya Wiratama Portfolio 2017
161
Aditya Wiratama Portfolio 2017
162
Khoo teck puat hospital.
Aditya Wiratama Portfolio 2017
163
The journey is not finished yet.
See you in another project.
Aditya Wiratama
Portfolio
2017
164