Architecture Portfolio 1.0 (RIBA Part 1) by Azim Noorazmi

Page 1

architecture

p o r t f o l i o azim noorazmi


"as an architect you design for the present, with an awareness of the past, for the future which is essentially unknown..."

norman foster



hi.

my name is al

azim bin noor azmi alazim92@hotmail.com +6 0134998089

Hometown Born

: Damansara, Malaysia : 10/03/92

Education

: 2010-2014 UiTM Perak, Malaysia Bachelor Science of Architecture (RIBA Part 1)

"I enjoy architecture especially when taking a complex problems and turning it into a simple, beautiful and workable designs.

"

: 2006-2009 SMK Taman Tun Dr. Ismail, Kuala Lumpur, Malaysia SPM (Sijil Pelajaran Malaysia) Working Experience

A

lhamdulillah, finally I’ve managed to complete this portfolio in a period of time given. I would like to thank to all of my lecturers from the day one as I started to blend myself in this field. It took them four years of an effort and precious time to taught me the meaning of architecture and designs in a building, cultures and religions.

: 2014-Current AKP Arkitek Sdn Bhd Asst. Architect

: 2013 (July-August) A. Hanapiah Architects Sdn Bhd Internship

Skills

:

Communication

Analog

Digital Graphicsoft Archicad 8/10 Autodesk Autocad 9.5/10 Adobe Photoshop 9.5/10 Adobe Indesign 7/10 Adobe Premeire 9/10 Sketch-up + Vray 8/10 Microsoft Office 8/10 : English Malay

Interest

Freehand sketch 9/10 Manual drafting 7/10 Model making by hand 9/10 Critical thinking 9/10 Photography 9/10

: Architecture, arts, travel, music & photography

Apart from that, i would like to thank to all of my studiomates for giving me a full support and teamwork throughout this years during the process of designing a project and completing all of the the assignments. Finally I hope that all of the efforts and achievements that I’ve been done for these past years of architecture will be a benefit to me and perhaps to everyone in the future. Thank you.

*All of the information and photos in this portfolio is being collected and captured by me based during class tutorials, crit session/discussion and case studies.


Preparing final boards and 3D models during submission week. (2011 - 2nd year/ sem 03)


extra+. Achievements

: Design Competition (Finalist) Pertandingan Rekabentuk Tandas Awam Perak organised by Jabatan Perhutanan Negeri Perak

: Dean's List (semester 01)

Curricular : 2014 President of 26th Architectural Workshop "TIANGSERI" organised by UiTM Perak 2013 "DUALISMA" Architectural Workshop in Kuala Lumpur organised by University of Malaya, Kuala Lumpur "PAM Exhibition" Architecture Student Works Exhibition organised by Pertubuhan Arkitek Malaysia, PAM 2011 President of Architectural Event "ADA" organised by Archisa, UiTM Perak "TERANG" Architectural Workshop in Skudai, Johor organised by Universiti Teknologi Malaysia Skudai, Johor "LIMAS" Lingkaran Integrasi Mahasiswa in Bota, Perak organised by Archisa, UiTM Perak with collaboration by Politeknik Ungku Omar, Perak "KUTAI" Tropical Architecture & Interior in Kampar, Perak organised by Faculty Architecture, Planning & Surveying

2010 "Jiwa Kampung" in Bagan Dato, Perak organised by UiTM Perak



overview. Arch's Firm

Sem 08

Sem 07

Sem 06

Sem 05

Project Type Site Phase Task

: : : : :

Kwasa Land Mix Development Kota Damansara Proposal Presentation Board

Project Type Site Case Study Duration

Project Type Site Case Study Duration

Project Type Site Phase Task

: : : : :

Oakland 2D Terrace House Seremban 2 Building Submission Preparing Documents

Research Paper : Communal Spaces Site : UTP Park, Perak Duration : 8 weeks

Project Type Site Case Study Duration

: University Wellness Centre : Service Building : Uitm Perak : UIA Gombak : 10 weeks

Project Type Site Case Study Duration

: Youth Extreme Sports Centre : Community Building : Lumut, Perak : Penang : 8 weeks

Sub-Project Site Duration

: Interior Space : : 4 weeks

Sub-Project Site Duration

: Urban Infill : Taiping, Perak : 6 weeks

Project Type Site Phase Task

: : : : :

S2 Height - Phase 3A2 Terrace House Seremban 2 Schematic Design Design Proposal

Project Type Site Phase Task

: : : : :

Shalom Condo. Highrise Bangsar, KL Tender Detailed Drawings

Project Type Site Phase Task

: : : : :

Kalista 2 Apartment Highrise Seremban 2 Tender Detailed Drawings

: : : : :

Shopping Mall Commercial Building Meru, Ipoh Kuala Lumpur 14 weeks

: : : : :

Vertical Housing Service Apartment Lumut, Perak Port Dickson 14 weeks

Group Project : Building Services Site : Damansara Duration : 4 weeks

Project Type Site Phase Task

: : : : :

WanAsia Mix Development Kajang Proposal Design Proposal

Group Project : Measured Drawing Site : Beruas, Perak Duration : 6 weeks


Sem 04

Sem 03

Sem 02

Sem 01

Others

Project Type Site

Project 3 Type Duration

: Space Modulator : Mood Box : 6 weeks

Project 2 Case Study Duration

: Essence of Nature : Cameron Highland : 4 weeks

Project 2 Site Case Study Duration

: Heritage Studies : Malacca : Individual Interest : 6 weeks

Project 2 Theme Case Study Duration

: Board Composition : Heritage Building : Penang : 6 weeks

Group Project Task Site Duration

: Tradisional Infill : 3D model : Malacca : 4 weeks

Project 1 Theme Case Study Duration

: Painting Drawing : Salvador Dali : Individual : 4 weeks

Project Design Stage

Project 1 Duration

: DCM Model : 4 weeks

Weekly : Sketchbook Assignment Site : Individual

Duration

: Thematic Shelter : Private Space : National Park, Pahang : 8 weeks

Sub-Project Site Duration

: Bus Shelter Cum Kiosk : Uitm Perak : 4 weeks

Group Project : Ergonometric Case Study : Uitm Perak Duration : 2 weeks

Project Group : Human Proportion Case Study : Individual Interest Duration : 4 weeks

: Pertandingan Rekabentuk Tandas Awam Perak : Public Toilet Entrance Sculpture Resting Booth : Finalist


AKP Arkitek sdn bhd

Project Type Site Phase Task

: : : : :

Kwasa Land Mix Development Kota Damansara Proposal Presentation Board

Project Type Site Phase Task

: : : : :

Oakland 2D Terrace House Seremban 2 Building Submission Preparing Documents

Project Type Site Phase Task

: : : : :

S2 Height - Phase 3A2 Terrace House Seremban 2 Schematic Design Design Proposal


Project Type Site Phase Task

: : : : :

Shalom Condo. Highrise Bangsar, KL Tender Detailed Drawings

Project Type Site Phase Task

: : : : :

Kalista 2 Apartment Highrise Seremban 2 Tender Detailed Drawings

Project Type Site Phase Task

: : : : :

WanAsia Mix Development Kajang Proposal Design Proposal


Kwasa Land - Mix Development Project Type Site Phase Task

: : : : :

Kwasa Land Mix Development Kota Damansara Proposal Presentation Board







S2 Height - 3A2 - Terrace Housing Project Type Site Phase Task

: : : : :

S2 Height - Phase 3A2 Terrace House Seremban 2 Schematic Design Design Proposal


E

D

C

Front Elevation 2,000

1,400

B

A

1,306

E

D

BD

CC

B

A

B

C

D

E

D

C

B

DB

E

EA

1,400

D

1,306

C

2,000

B

2,000

A

1,306

B

1,400

C

2,000

2,000

D

E

1,400

D

1,306

C

2,000

B

02A-Front-Link

Rear Elevation 2,000

1,306

E

A

B

C

1,400

D

2,000

C

2,000

B

D

B

C

D

E

D

C

B

A

B

C

D

1,400

1,306

2,000

2,000

A

E

2,000

A

1,306

B

1,400

C

2,000

D

2,000

E

1,400

D

1,306

C

2,000

2,000

B

A

1,306

B

1,400

E

C

2,000

D

Elevation

1,306

1,400

E

2,000

D

2,000

C

B

1,400

1,306

2,000

Isometric - Ground Floor E

1:100

2,000

1,306

1,400

2,000

2,000

1,400

1,306

2,000

2,000

1,306

1,400

2,000

Isometric - 1st Floor

A

E-11

6,706 2,706 1,400 1,306

2,000

A

2,000

2,000

AE

C

E-11

2,000

2,000

1

6,706 2,706 1,400 1,306

2,000

1,650

1,650

1

W

2

BATH 3 25 dp

YARD

1,650

1,650

2 75 dp

50 dp

3

3

BATH 2

25 dp

1

75 dp

2

3

4

4a

5

5a

66a 6b

6b 6a6

5a

5

4a

4

3

2

1

50 dp

KITCHEN

2,550

2,550

BEDROOM 4

4,200

4,200

50 dp

BEDROOM 2

BEDROOM 3

1,275

4 1,275

4

4a

18

Enclosed Area : 77.02

14

Semienclosed Area : 46.72

12 11

17

Ground Floor Area : 123.74

15

8,250

1,350

21,336

7 6

Total Area sqft : 2195.08

5

X9

LIVING

Semienclosed Area : 1st Floor Area : 80.19

10

5

3

up

9

5a

8

Total Area : 203. 93

7 6 5 4 3

X9

MASTER BEDROOM 2

375

100 dp

1

2,700

2

1

2,700

13 12 11

4

6 6a

14

FAMILY AREA

Total Area sqm : 203.93

21,336

5a

8

8,250

5

Enclosed Area : 80.19

16

10 9

19 18

13

DINING

dn

4a 12,450

2,550

15

2,550

16

1,350

12,450

17

375

6b

6 6a

TERRACE 50 dp

BATH 1

900

900

25 dp

CAR PORCH

7,236

1,650

1

7

7

Plan - Ground Floor

Plan - 1st Floor X10

X10

1,650

2,550

900

Section A-A 1,275

2,550

1,350

2,700

375

375

Section B-B

6b 6a6

5a

900

2,700

1,350

2,550

1,275

2,550

1,650

1,650

6,336

7,236

6,336

6b

2

3

4

4a

5

5a

66a 6b

5

4a

4

3

2

1


sem08

/year04

Project Type Site Case Study Duration

: : : : :

Shopping Mall Commercial Building Meru, Ipoh Kuala Lumpur 14 weeks

















sem07

/year04

The case study was at Port Dickson, Negeri Sembilan. Each group were given an assignment by lecturer to study on any service apartment within the area. Paradise Lagoon Apartment, located at the beach. We managed to get their drawings and study on planning, zoning and building services.

Project Type Site Case Study Duration

: : : : :

Vertical Housing Service Apartment Lumut, Perak Port Dickson 14 weeks


case study

Basically i managed to do some individual research on which material should i used, the green wall features and how the signage, greenery and material could effect the whole design easthetic value.


Nour Residence resort apartment







sem06

/year03

Group Project : Building Services Site : Damansara Duration : 4 weeks

Sub-Project Site Duration

: Interior Space : : 4 weeks

This is my first case study on highrise building. We were given an assignment on services such as lift core, fire escape, lift room, water tank, dry/wet riser and anything that required for bomba submission.

This project is to study on how the circulation and zoning inside the medical centre. We were given this task to apply it on our main project.

Project Type Site Case Study Duration

: University Wellness Centre : Service Building : Uitm Perak : UIA Gombak : 10 weeks


assignments

Lift room

Roof structure

Medical compartment

Lift lobby

Fire Tank

Courtyard

Community spaces

Ramp


project 01 Sub-Project Site Duration

: Interior Space : : 4 weeks


project 02 Project Type Site Case Study Duration

: University Wellness Centre : Service Building : Uitm Perak : UIA Gombak : 10 weeks

University Wellness Centre is a one-stop centre for the students, lecturers and staff mainly for medical purpose. It is located near the soccer field, courts and hostels. The advantage of the site is the slope which make it interesting when it comes to design. The design approach of this project is to insert more communal space in a University such as gymnasium, open spaces/ courtyard, admin and special spaces which related to medical purposes.


sem05

/year03

Group Project : Measured Drawing Site : Beruas, Perak Duration : 6 weeks

Sub-Project Site Duration

: Urban Infill : Taiping, Perak : 6 weeks

Measured on malay tradisional house. Study on basic layout and zoning of malay architectural design.

The lot was abandon and demolished, leaving a gap between the two existing shop houses. The main design strategy is to reflect the social culture of the site and give a good impact to the local surrounding. The design approach is to propose a space for the local vintage bicycle user. From the perspective, there are many locals whom uses a bicycle in their daily activities for casual purposes.

Project

Type Site Case Study Duration

: Youth Extreme Sports Centre : Community Building : Lumut, Perak : Penang : 8 weeks

The site is in Lumut, located 50m away from the beach. The context is an advantage to the site. It is surrounded by hotels, apartments, schools and shoplots. Basic services as a main requirement to apply in the design such as sewerage and electrical layouts.


assignments

The final product of measured drawing assignment. The typography of Infill facade design.


project 01 urban infill : shop house

LOCATION : TAIPING PERAK REQUIREMENTS : • 1 GROUP WORK • 1 INDIVIDUAL PROJECT

GROUP WORK : • SITE ANALYSIS ( ANALYSING LANDSCAPE & HARDSCAPE ARCHITECTURE,AND CIRCULATION. FINAL PRODUCT SHOULD BE COMPOSED IN A2 DRAWING. INDIVIDUAL PROJECT : • DESIGNING A SHOP HOUSE. IDEA , CONCEPT AND COMPOSITION DRAWING OF PLAN, SECTION , ELEVATIONS, WITH A COMPLETE MODEL OF 1 : 50

Final presentation boards.


project 02 extreme sport centre LOCATION : LUMUT , PERAK REQUIREMENTS : • 1 GROUP WORK • 1 INDIVIDUAL PROJECT GROUP WORK : DO A COMPREHENSIVE SITE ANALYSIS OF THE GIVEN SITE WITH AN A1 SIZE OF PRESENTATION BOARD, VERBAL PRESENTATION INDIVIDUAL WORK (DESIGN PROPOSAL) : IDENTIFY THE SUITABLE SITE FOR THE PROJECT,AND PREPARE CONCEPTUAL SITE PLANNING, DEVELOP DESIGN IDEA INTO Final presentation boards.

Final Model scale 1:200


sem04

/year02

Group Project : Ergonometric Task : Bamboo raft Case Study : National Park, Pahang Duration : 2 weeks

Sub-Project Site Duration

: Bus Shelter Cum Kiosk : Uitm Perak : 4 weeks

Project Site Duration

: Thematic Shelter : National Park, Pahang : 8 weeks


group project Ergonometric


bus shelter cum kiosk


thematic shelter


sem03

Project Group : Human Proportion Case Study : Individual Interest Duration : 4 weeks

/year02

Project 2 Case Study Duration

: Essence of Nature : Cameron Highland : 4 weeks

Project 3 Case Study Duration

: Space Modulator : Cameron Highland : 6 weeks


assignments


boards



sem02

Project 1 Duration

: DCM Model : 4 weeks

/year01

Group Project Task Site Duration

: Tradisional Infill : 3D model : Melaka : 4 weeks

Project 2 Site Case Study Duration

: Heritage Studies : Melaka : Individual Interest : 6 weeks


sem01

Weekly Assignment : Sketchbook Site : Individual

/year01

Project 1 Theme Case Study Duration

: Painting Drawing : Salvador Dali : Individual : 4 weeks

Project 2 Theme Case Study Duration

: Board Composition : Heritage Building : Penang : 6 weeks


sketches






Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.