AAR 680 PORTFOLIO

Page 1

AAR 680 : DESIGN IV PORTFOLIO PREPARED BY: AZRA ILYANI BINTI AZMAN 2017654762 MAR 2022 - AUG 2022


KUCHING, SARAWAK.

The site is located within the area of Kuching City Centre, about 850m from the Kuching Waterfront. The chosen site is located at the intersection of Jalan Ban Hock and Jalan Tabuan and the area is approximately 9000sqm (2.2 acres)


ABOUT THE SITE:

Undeveloped land; there is an abandoned house which was used as a transit hotel. Easy access, located near to the heart of Kuching City and commercial area. Surrounded by a few famous eating place and budget hotels






RE:HOMELESS

HOMELESS TRANSIT CENTRE

Homelessness is a form of urban poverty and can be identified whenever people are forced to live in informal settlements under sub-par living conditions due to sudden changes in their living circumstances. A fact lesser known amongst locals is that 90% of the homeless community are Malaysian citizens– not foreigners. The top reasons for homelessness in Malaysia include unemployment, low income and domestic violence. In Sarawak, as in its aspiration to be a developed city, the welfare of the people, including the poor and handicapped, is an essential fabric of a developed nation. We should take prompt action, including a long-term solution to help these homeless obtain proper accommodations and professional help and eventually assimilate them into society. At the same time, it will also help maintain the good image of the capital city; Kuching. A total of RM5 million has been approved under the 12th Malaysia Plan (12MP) to set up four temporary transit centres (TTG) for the homeless in Sarawak which is in Kuching, Sibu, Bintulu and Miri.

Kuching is home to most locals, but not everyone has a place to call home. On May 12th, 2022, the mayor of Kuching South, Datuk Wee Hong Seng, has suggested that a temporary shelter be created for the homeless to rest, clean up and sleep at night. Since homelessness is caused by unemployment, this homeless shelter aims to provide skills to the victims, in hopes of improving their self-esteem and confidence, other than providing basic necessities such as food, hygiene, and health care.



















BY-LAWS AND REGULATIONS DESIGNATION OF PURPOSE GROUP FIFTH SCHEDULE (BY-LAW 134, 138)

STAIRCASES SARAWAK ORDINANCE (BY-LAW 83) (1)In any staircase, the rise of any staircase shall be not more than 180 millimetres and the tread shall be not less than 260 millimetres and the dimensions of the riser and the tread of the staircase so chosen shall be uniform and consistent throughout. (2)The widths of staircases shall be in accordance with bylaw 155. (3)The depths of landings shall be not less than the width of the staircases, except in the case of straight flight staircase, the minimum depth of intermittent half landing shall be 900 millimetres.

*Note: Purpose Groups I,IV and VII are excluded from by-law 136 as there are no limits applicable under by-law 138.

R access way: -minimum 6m width -30 tonnes load -1:15 gradient -no overhead obstructions required portion of building facing the access way

T

R: T:

125mm 300mm


FIREFIGHTING REQUIREMENTS

ASSEMBLY AREAS ACCESS FOR FIREFIGHTING (BY-LAW 140) NO OVERHEAD OBSTRUCTION ROAD WIDTH MINIMUM OF 6M MINIMUM ROAD CLEARANCE 4.5M MINIMUM OVERHEAD CLEARANCE 4.5M

FIRE ACCESS ROAD VOLUME OF BUILDING =(FLOOR AREA) (HEIGHT) = [1408( 2) - 293 + 693](3.125) =3216(3.125) =10500 CUBIC METRE

FIRE HYDRANT EXTERNAL FIRE HYDRANT SYSTEM DESIGN REQUIREMENTS

- BY-LAW 225( 2) STIPULATES THAT EVERY BUILDING SHALL BE SERVED AT LEAST ONE FIRE HYDRANT LOCATED NOT MORE THAN 90M. -BY-LAW 225( 3) STIPULATES ADDITIONAL FIRE HYDRANT SHALL BE PROVIDED DEPNDING ON THE SIZE & LOCATION OF THE BUILDING

TOTAL BUILDING PARAMETER: =391m

DISTANCE OF ANOTHER H1 to H2: 83m H2 to H3: 53m H3 to H4: 64m H4 to H1: 78m

HYDRANT FROM

ONE


WATER SUPPLY DISTRIBUTION SYSTEM

Shower

DOMESTIC WATER TANK CALCULATION Rule of thumb (1m x 1m x 1m) 1 tank module = 400 gallons

Therefore, number of tanks required= 2040 gallons/400 gallons = 5 tanks

UNIVERSAL DESIGN Ramps, Disabled Parking & Toilet


REFUSE COLLECTION 600 mm

REFUSE CHAMBER CALCULATION Capacity calculation shall be based on minimum of 240 litres per ground floor unit and minimum of 120 litres per upper floor unit.

600 mm

Admin block = 240 l Donation block = 240 l Sleeping block = 240 l + 120 l = 360 l Total = 840 l Assume that use 1100 l dumpster, 1100/840 = 1.3 = 2 dumpsters Therefore, 1 refuse chamber = 2 dumpster x 1100 l = 2200 l

in

load

g

adin

nlo g&u

te

rou e c i erv

s

substation

refuse chamber


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.