he modern Chief Procurement Officer currently occupies a space within enterprise hith-
erto unheard of in years gone by. The CPO and the procurement team are now armed with an incredible array of insights and skills that embolden the aims and ambitions of the business units. This shift heralds the procurement function as an integral strategic tool far more sophisticated than a merely savings-led practice. Procurement now has the ability and freedom to align itself to, and inform and strengthen, a company’s goals, through the provision of a 360-degree vision of a company’s operations. As a result, the origin stories of many modern CPOs are not following the traditional path of working their way from the top to the bottom of the procurement function. Many modern CPOs now have an array of skills and expertise that underscores this shift. Jonathan Sims is Chief Procurement
by background. A development surveyor
Officer for the UK and Ireland business
and I worked in that field for about 10
of the French multinational electric utility
years before moving into mechanical and
ENGIE. However, Sims is not a procure-
electrical engineering in a work-winning
ment guy through and through. “I came
role before ending up in strategic busi-
into procurement a little later on in my
ness projects. And one of those change
career, having only been in procurement
programs was around procurement.”
for about eight or nine years,” he explains
Sims’ work involving the procure-
from the ENGIE offices in London’s
ment function was the springboard
Canary Wharf. “I’m a commercial surveyor
for a number of increasingly senior
4
ENGIE UK & IRELAND
procurement roles that led to his current position at ENGIE. “Procurement lends itself to a lot of transferable skills,” he explains. “So, as a team, even through to our group CPO, many individuals have had a very transversal route into that role. I think the generalist skill set lends itself to procurement and I think as long as you have that kind of business acumen and an affinity with people and suppliers, then it’s a great function to work in. The ability to make a significant fiscal impact on a business and to have that breadth of reach across people, teams and functions appeals to me significantly.”
5
The UK arm of ENGIE turns over £3.6bn
in 2018. The way procurement was posi-
with 17,000 staff while ENGIE as a group
tioned within the organisation “probably
is active in 70 countries with a turno-
wasn’t correct” according to Sims with,
ver of around £60bn and 170,000 staff.
from an engagement perspective, people
Sims’ role is responsible for all procure-
who were not as engaged as other
ment within the UK operation that has
central services teams.
a procurement team of around 60, split
Sims managed to retain and develop
across five operating divisions. The team
a significant proportion of the staff he
manages all aspects of procurement of
inherited, with a clear succession plan for
goods and services where they spend
the next two or three years in terms of
approx. £1bn annually. The procurement
where they were going as individuals and
community at ENGIE needed a little bit of
how ENGIE could get them to that next
a reinvigoration at the time of Sims’ arrival
level of procurement excellence while
6
ENGIE UK & IRELAND
driving performance. “For me, having
based on robust competency mapping
that succession plan within the business
and some really clear and insightful
is fundamentally important. I think for a
people assessments, which is particularly
number of key roles, when I joined about
important. We’re launching a strategy with
15 months ago, we didn’t have the right
the business where the key stakeholders
succession within the business and we’ve
have contributed and feel very much an
changed that significantly. So, all levels,
integral part of that.”
myself included, we have a clear line of
Retaining key talent has been one of
sight for who will be taking that next role.
the most important challenges for Sims
That’s something we’ve looked to drive
at ENGIE with an historically “higher than
across the wider group business whether
desired attrition rate” amongst procure-
the opportunity is within the UK business
ment staff. “It’s a very buoyant market
unit or another global business line. It’s
for senior procurement individuals at the 7
moment. So, creating that clear pathway
within finance, many of whom felt a little
where people could see the next three
remote from previous procurement strat-
or so years of their working life at ENGIE,
egies within the organisation. Sims’ strat-
while enjoying incremental milestones of
egy was very much building a transversal
development linked to reward, was really
cross functional team with non-procure-
fundamental. Once we got that stability
ment execs as sponsors for each strand
in the team, we could then really start to
of the strategy. “I think that really helped
take things forward.”
us get traction and slip under the skin of
Integral to the procurement strategy
what the key stakeholders in the business
at ENGIE is early stakeholder engage-
wanted,” he says. And Sims feels fortu-
ment. Sims’ primary focus in the first few
nate to have garnered senior sponsor-
weeks involved concentrated stake-
ship from the CEO of the UK and Ireland
holder engagement with the divisional
business: “That really helped us drive that
chief operating officers, the commer-
message through the wider business.”
cial directors and the key stakeholders
ENGIE’s three-year strategy is
NATIONAL COVERAGE: REGIONAL DELIVERY! Newcastle | York | Birmingham | Bristol | Glasgow | London | Manchester
ENGINEERING EXCELLENCE SES Engineering Services is recognised as one of the leading M&E partners in the UK, delivering for a wide range of customers by creating environments where our clients can excel. As a market leader, SES delivers building services that are derived from an exceptional level of technical authority. We deliver bespoke design-led solutions and optimise productivity for the whole construction team, by maximising offsite manufacture in our quadruple award-winning production facility, Prism.
CONTACT DETAILS: NORTH EAST OFFICE Centre for Advanced Industry Coble Dene, North Shields NE29 6DE
“Newcastle Energy Centre showcases building services engineering at its best delivering one of the most significant developments in the region. The offsite prefabrication strategy for constructing the M&E element of this scheme removed in excess of 70% of labour activities from site. Best value was delivered for the client by the collaborative and effective working relationship between ENGIE and SES.” STEVE JOYCE Business Director North and Scotland
TELEPHONE 0191 258 6627 EMAIL sjoyce@ses-ltd.co.uk
CREATING TOMORROW TOGETHER
ses-ltd..co.uk
Rethinking Procurement and one of
a better result for them. Responsible
the major focuses for Sims is around
procurement remains at the heart of
its Supplier Of Choice Strategy. “That’s
everything we do, making sure that we’re
ensuring we’ve got the right relationships
eradicating any potential risks of modern
with the right suppliers in the right place
slavery within our supply chain, while miti-
to really make a difference for our clients,”
gating any risks of counterfeit product or
he says, “so we’re engaging suppliers in a
child labour.”
mature and considered way. We need to
The biggest element to the new
stay at the forefront of innovation and our
procurement strategy lays with people,
clients are demanding much more than
as seen in some bold new ambitions in
just a compliant price. We really need to
that area. The Competency Matrix maps
be demonstrating over the duration of a
all procurement people to one of the
contract, how we’re going to fundamen-
seven strands of the strategy. “Working
tally enhance our offering and deliver
through 70 different competencies, we’ve 9
understood how best placed that particular individual is to support a particular strand, or aspect of the strategy, be it innovation or responsibility or supply chain consolidation. All members of the team have objectives set specifically to a strand of the strategy and then from an overarching perspective, we have an executive director that’s non procurement who leads in a particular area, plus one member of the procurement SLT. To some extent it’s cascaded through the business and we’ve had some key conferences along the way with the procurement community to share how we’re launching the strategy, what it means for them and how we’re looking to evolve that over the next 12 months.” There are of course challenges linked to any transformation, especially where people and work culture are concerned, with change management often cited as the number one obstacle. “I think the first few months were particularly crucial around that because there was a lot of change in a very, very short period of time; including change in personnel at senior level within the procurement function. There was definitely an aspect of winning hearts and minds, while moving very quickly to turning what we said we’d do into tangible action with people going through that Competency Matrix.” The manifestation of this action were individual training plans and incremental steps, so staff were being rewarded for delivery. “I think that helped to build that positive messaging. And I think the sponsorship we’ve had from the exec level and how that’s repositioned procurement has been particularly useful. I don’t think procurement had that profile within the business previously. The Competency Matrix has created some real expectation 10
ENGIE UK & IRELAND
11
“Externally, we’ve got a strategic partnership with EcoVadis and they’re really supporting our Responsible Business Development Initiative within the UK” — J O N AT H A N S I M S C P O, E N G I E U K & I R E L A N D
in our people. We’ve got a lot to deliver
down into a set of initiatives that we’re
on over the next 12 months to make sure
going after as a team. We attack that as a
people really feel that those commit-
team. We deploy the individuals with the
ments we made last year are being borne
best placed and most appropriate team
out in their development. That’s a real
members leading in that certain area.
pressure.”
But we deliver that target collectively
Procurement has always been decep-
and success or failure is determined by
tively people driven while from the
that rather than one individual feeling
outside appearing very much, the oppo-
they’re exceeding and another individual
site. Sims’ early conversations with
with a different set of addressable spend
stakeholders around how things had
or more complicated dynamics feeling
operated previously, had been incred-
unable to make the same level of contri-
ibly savings orientated and yet had
bution. For the first time in a number of
struggled to perform against savings.
years we exceeded our savings targets.
“The way we moved things forward last
So that said to me it was the right
year was very, very people driven. One
approach.”
Target, One Team is a new initiative
“Hopefully the team is more engaged
that has helped procurement at ENGIE
in that method of working and feeling that
to fully harness its new agility. It was us
they’re contributing their talents more
trying to break away from people feel-
effectively and more appropriately. But
ing constrained and restricted by a huge
it takes a lot of maturity to do that. Other
individual savings target. We broke that
stakeholders potentially can feel that
there isn’t the same level of accounta-
co-create together. There are also chal-
bility perhaps. We’ve been quite effec-
lenges in terms of what we’re doing with
tive in working through that, but it has
our people; how we’re retaining them,
been a challenge. People centrally didn’t
while mapping their skills for a changing
have an individual savings target, but we
marketplace in zero carbon. For procure-
delivered that collectively through initi-
ment professionals, this is a different set
atives, so people understood what we
of metrics in terms of how we’re look-
were going after, plus they didn’t neces-
ing at success. It’s put particular focus
sarily feel the personal burden of having
on what we’re doing within responsible
a number over their heads. I think that
procurement and innovation. We currently
drove a different mindset and culture and
have a £4m innovation fund in the UK
ultimately, we’ve been better for it. I think
where we’re actively looking to invest in
it’s demonstrating to the business that
organisations to drive new solutions. And
we’re more than just a savings depart-
that’s something that’s very, very new for
ment. There’s a lot of intellect within that
us. It’s also created changes in terms of
team, a lot of ability to add far greater
our overarching systems and processes.”
value to commercial, to finance, to oper-
Project Mercury is a completely new
ations. We’re definitely on that journey to
ERP system that ENGIE is developing
emphasise that.”
jointly with Capgemini, partners in that
It is hard to escape sustainability, no
space. Project Mercury will effectively
matter the sector, and for an energy
change the way that ENGIE does busi-
company it pretty much drives every
ness. “Mercury will help us become a
aspect of ENGIE’s focus going forward.
truly data-driven business with data driv-
The past six to nine months has seen the
ing the right decisions for the business
company position itself at the forefront of
and more robust procurement decisions
leading the zero-carbon transition, creat-
based on science.”
ing some new challenges for procure-
Jonathan Strelitz, Head of Category
ment. “It creates challenges in terms
Management is also looking forward to
of the types of suppliers and subcon-
the benefits of Project Mercury. “We’re
tractors we should be working with,”
about to embark on a £17 million trans-
Sims explains. “It also affects how we
formation program by bringing our five
engage with them and what solutions we
ERP systems to one. This is a fantastic w w w . c p o s t r a t e g y. c o m
13
opportunity for us. We are now leading the P2P work stream and embedding that within Jonathan’s strategy. So, it becomes almost like the DNA of the strategy in terms of how we move that forward. It then allows us to embrace that within the whole team, so everybody has an understanding of that program.” With procurement evolving so much outside of ENGIE, and within, how does Sims remain at the forefront of what’s going on in this transformational space? “Our partnerships with a number of organisations have really helped that,” he enthuses. “Externally, we’ve got a strategic partnership with EcoVadis and they’re really supporting our Responsible Business Development Initiative within the UK, which is where we’re forming a strategic alliance with more than a thousand organisations to build a community investment fund, where we’re going to invest in the communities we serve. Our ongoing relationship with EcoVadis is fundamental. Our Mercury Change Program will be really, really pivotal this year to start to change the way that we buy and enable us to make better decisions.” Sims has also taken on the Solutions Director role for the P2P aspects of Mercury. “Having procurement 14
ENGIE UK & IRELAND
Jonathan Sims CPO, ENGIE UK & Ireland Jonathan Sims has more than 20 years’ experience working in the UK Construction, Engineering, Facilities Services and Energy Sector. Jonathan spent 10 years working in commercial property development as a development surveyor, before joining the Shepherd Group Ltd in a variety of business development and strategic business projects roles. Jonathan has held senior procurement leadership roles for a number of major UK construction companies including Kier PLC and Morgan Sindall PLC, before taking on a leadership role at NG Bailey Ltd, the largest privately owned construction and engineering organisation in Europe. Currently, Jonathan is the CPO and Solution Director at ENGIE UK&I, which has a turnover of c£3.6bn and employs 17,000 staff across its energy, regeneration and facilities portfolios, with an annual spend of goods and services of c£1bn. Jonathan is passionate about developing procurement teams, talent and culture and is currently in the final stages of his PhD. Jonathan has strong associations with academia, and has been an external advising practitioner at Nottingham Business School since 2013, supporting the MSc programmes, with a particular focus on international business. Jonathan has also been a guest lecturer on the Durham MBA programme for a number of years. Jonathan is also a non-executive director of a major multi academy schools trust in the UK. Jonathan lives in Nottingham with his wife, two children and French bulldog
15
“I think it’s probably one of the strongest procurement teams I’ve ever worked with. We’ve got people being seconded into the business units and I think that’s really starting to create a positive message” — J O N AT H A N S I M S C P O, E N G I E U K & I R E L A N D
stakeholders really embedded in that
the way that the team present themselves;
process, positions procurement differ-
they’re enthused, they’re engaged,
ently within the organisation and enables
they’re all very ambitious and they can
us to really shape that process rather
see where they’re going within ENGIE. I
than it happening to us. Sometimes we
think it’s probably one of the strongest
inherit some systems and processes that
procurement teams I’ve ever worked with.
we wouldn’t necessarily have created in
We’ve got people being seconded into
those ways.” There is a lot of transformation taking place within procurement at ENGIE and so how does Sims gauge his departmental success? “The level we came from at the start of last year was fairly low compared to other central services teams within ENGIE, in terms of engagement. We were about 16% less than other central services teams and we made a huge step forward in that engagement score last year. So, this is something that happens every single year, which is very, very important for the wider business. We made a 16% improvement in one year, which was a huge step. And I think you can see that in 16
ENGIE UK & IRELAND
international business units and I think that’s really starting to create a positive message. Plus, we over-delivered on our group savings target last year, which again shows that we’re backing that up with business results. The procurement team are now involved in cross-functional initiatives, working with business and innovation teams while being identified as stakeholders that can add a lot of additional value. For me, it’s about having that desire to continually keep moving the function forward. We’re always looking for that next iteration in how we improve. We’ve had recognition at group level, from a supply chain perspective, for best practice being deployed in other business units through relationships we’ve developed and nurtured in the UK, and that gives me a warm feeling. We’re really making a positive change.” 17
ONE TEAM, ONE GOAL Jonathan Strelitz, Head of Procurement Energy Solutions, ENGIE “Procurement really was seen as the compliance police and the savings function. And I think for me, with the experience that I’ve had and with the people that we now have within the team, it’s trying to allow us to show the business, we’re more than just about saving money and stopping people from ordering goods and services. I think it’s more about trying to look at the end-to-end process and the strategy we have where
Sustainable and innovative building service solutions With 16 regional offices throughout the UK, Lorne Stewart Group are leaders in mechanical and electrical engineering services, Design for Modular Assembly (DfMA) and post construction facilities services. By having a clear understanding of our customers, their drivers, and working in collaboration with them, we ensure that we offer the right, bespoke solution every time! Through our high-level, ongoing strategic partnership with Engie, we are delivering excellence through innovative and sustainable
engineering solutions. For example 80% of the St James Energy Centre in Edinburgh has been manufactured by our in-house prefabrication facility. Our DfMA strategies optimise building services designs to achieve the most sustainable and efficient solution. This allows our customers to exceed sustainability targets as Lorne Stewart minimise site waste and improve site safety, while delivering a quality product. Lorne Stewart Group & Engie – Working together for the right solution
Lorne Stewart Group – Celebrating our continued success in delivering excellence through our People, Processes and Performance.
www.lornestewartgroup.com
Contact Paul Briars CEO, Lorne Stewart Engineering paul.briars@lornestewart.co.uk
07967 165 699
savings is just really one lever of what we
having a long-term strategy, we need the
try to bring here at ENGIE in the UK.
right people in the right places at the right
I think the importance of having the right
levels. And then it’s incumbent on us as
people within the team, is that they create
the senior managers to try and develop
their own networks. So, within that they’re
and train these people so they can be
not then reliant on the management or
successful. Not just in terms of generating
the whole team in driving our strategy
savings, but generating overall value for
through. It means that there are CPO
the business.”
interfaces at the senior level. Then, there’s the next layer down and below that. So it enables us to try and communicate the
Charlie Roberts, Hard Services Category Manager, ENGIE
right messages in terms of what we are
“We have a good mix of services and
doing in making a compelling argument
solutions and projects, which means we
of why we want people to go and spend
have to keep a fairly open mind and have
their money in certain areas or use certain
a holistic approach rather than being
suppliers within our supply chain.
a purely CapEx driven strategy. That’s
For me, if we are to be serious around
helped us mould a very diverse range of 19
skill sets and a growing number of more youthful category category members growing from an apprenticeship position to lead buyer. I think we’ve got one or two who are knocking on the door for category manager in the next few months. So, it’s definitely moved to a much better place than it was where I think we had a very siloed approach, poorly integrated team from the top down prior to Jonathan’s appointment. We struggled to build the general morale that we needed to then go out to the wider business. That’s changed completely now we’ve opened the doors and we’ve kept those doors open with the wider business who actually see us as generating real value.”
Lisa Boumaza, Category Lead Buyer, ENGIE “It’s a really nice place to work and I can
in developing us. They’ve built up this
really see the difference from when I
competency assessment tool to map our
started in 2017 where I was in an opera-
profile against our current role, but also
tional procurement role. Now, we’re look-
where we want to be in the next three
ing at category management, which is a
years, building a development plan for
bit more strategic. We look at spend on
each individual so they can get where
a national scale working with the Group
they want.
and we have a team where we really get
When I began working for ENGIE in
on well altogether with great leadership
2017, we were in a much different place;
within the team. We know where we’re
it was all very operationally, almost
going and our managers are interested
commercially, driven, with no early
20
ENGIE UK & IRELAND
category management has really helped in giving us a path in terms of what we prioritise for the business, and locating the higher value categories of spend where we could drive better performance and savings.”
George Mangham, Procurement Manager, ENGIE “My apprenticeship scheme was brand new to Engie when I started. It was a two-year apprenticeship scheme with three rotations. I’ve done a rotation in operational procurement, so I understand that side. I also did a placement in the bids and mobilisation procurement and so I understand the initial forefront where we mobilised contracts and bid for them with our potential clients. I am also familiar with the category management side as well. I’ve had quite a rounded experiprocurement involvement. So, it was
ence in two years of the apprenticeship
always too late to build any proper strat-
scheme. I’ve had a lot of opportunities
egy. It was all very reactive. And now we
in there and the mentors I’ve had are
have a much different approach, which
fantastic. The scheme’s been fantastic.”
is building three-year category plans. We engage with the business to get sign off and work closely with operations
Vincent Tissendie, Category Manager, ENGIE
to implement their strategies, making
“For a long time, we were seen as
sure that it’s good from a technical
people who only looked after cost
and commercial and legal level. So, it’s
prediction and spend, which is not the
very different to where we were. I think
exact purpose of a procurement function. 21
“ The past six to nine months has seen the company position itself at the forefront of leading the zerocarbon transition, creating some new challenges for procurement” — J O N AT H A N S I M S C P O, E N G I E U K & I R E L A N D 22
ENGIE UK & IRELAND
other, because we have some cross-functional, cross-category project where we’ll work together and plan in advance to deliver at the right time. We are working in an industry where things happen very quickly, so when we meet for a project, we’ll mobilise and when the contract is mobilised, we need to ensure delivery. So, things need to be ready. It’s not when the contract goes live that we need to think about how we can add value to this contract. We need to be ready before to engage with our key stakeholders and make sure that we can deliver on time. We look at the full spectrum of the value chain, and not work only around savings. We look after innovation, sustainability, zero carbon emission, processes, digitalisation, technology. That’s what allows us to deliver bigger, better and faster, to be honest, because if we do not take these into account, we will be basic procurement people without any category plan or structure. And I think that’s what will take We tend to cover the full spectrum of the
us through to the next level as procure-
value chain and deliver across all aspects
ment individual and as a function too.”
of it. Yes, of course, it’s savings, but it’s also innovation processes, sustainability, zero carbon emission processes. So, yeah, that makes us much more interesting for the business. I love the way we engage with each 23