Capital Improvement Projects
Location Project Description
BMS - Prairie Campus Asphalt pavement rejuvenation application BMS - Prairie Campus Replace circulating pumps BMS - Prairie Campus Replace unitventilators BMS - Prairie Campus Reconstruct front parking lot BMS - Station Campus Resurface play area BMS - Station Campus Replace basketball hoops Countryside Replace building circulation pumps
Countryside Countryside Asphalt pavement rejuvenation application Replace rear shingled roof
Grove Grove Grove Grove Hough
Update playground equipment Repair/paint/replace exterior doors and frames Replace building circulation pumps Replace music room unitventilator Repave asphalt play area North Barrington Update playground equipment North Barrington Repave play area North Barrington Thermoplastic striping Sunny Hill Asphalt pavement rejuvenation application
Sunny Hill Roslyn Thermoplastic striping Replace corridor flooring
Roslyn Roslyn Replace building circulation pumps Replace front office roof top unit
Roslyn Asphalt pavement rejuvenation application
Roslyn Roslyn Lines Thermoplastic striping Replace rear shingled roof Replace building circulation pumps
Lines ELC Replace boiler pumps Replace building circulation pumps
ELC ELC BHS BHS HMA Repair Thermoplastic striping Construct signalized intersection at Main St Replace remaining carpeting in department offices
Rose
Thermoplastic striping Administration Bldg Replace exterior windows and add security film Administration Bldg Asphalt pavement rejuvenation application Administration Bldg Thermoplastic striping Administration Bldg Roof Replacement Administration Bldg Secure reception desk
2022-2023 Estimated Total
Estimated Project Cost
21,420 21,420 315,000 1,920,000 63,000 22,680 40,320 12,600 315,000 190,000 170,100 40,320 31,500 75,600 190,000 34,020 10,710 11,592 10,710 315,000 40,320 75,600 15,120 10,710 315,000 46,620 40,320 40,320 63,000 10,710 1,260,000 201,600 10,710 189,000 11,592 10,710 460,960 25,200
6,638,484
On March 17, 2020 registered voters in the Barrington 220 community passed a $147 million bond referendum, which will greatly impact the future of our schools. The question was approved by more than 60% of voters.
Barrington 220 is working with architecture firm DLR Group and Pepper Construction to complete the projects. The timeline for construction is anticipated to last until 2025. It is divided into three phases: • Design: time needed to review concepts, produce construction documents, and receive authorization from the Board to release for bidding • Bid: time needed for prospective bidders to get drawings, estimate and submit bids for the design, and the construction team to analyze and formulate recommendations for Board approval • Build: time needed to award contracts, purchase materials, construct, and once completed, turn over the facility to the school district to occupy
The District’s Referendum Construction Steering Committee is helping lead the Design, Bid, and Build phases. Schools which are currently in the “Build” phase include: BHS, Prairie, Station, Countryside, Grove, Hough, Roslyn, and Sunny Hill. Barbara Rose, Lines, North Barrington, and the Early Learning Center will enter the “Build” phase in Summer 2023.