Construction as alchemy_1C

Page 1

7 degree fall within 7.5 degree is suitable for rainfall ARI of 200mm/ hr in Melbourne region(Table 6.2.1 - Lysaght Roofing Walling installation Manual)

Gutter is connected with two shelters which is allowed water to go through the cover and then flows down the gutter to the ground

elev

1

5924 3971

7 degree fall

123

1830

7 degree fall

The egde of shelter is covered by capping board and decking in order to decorate and fix the egde

section

section

A

1

elev

4965

The capping use 75PFC which is distributed at the top and bottom of the edge

A

The opening is not covered by shelter which is suitable for tree to grow freely

Three roofs are joined together and expand to 4965 milimeters long

Area of roof: These part of shelter is not connected with decking which strengthen the connection to the ground and also allow people to go through

N

A1:(west side roof) 4965 x 4060 =20157.9 mm2

The gutter is placed at the intersection of the two shelters which a little spout (250*28*50mm) outside of the shelter but supported by I-beam

The shelter does not go with wall but provides another Shade area for people on the left side

A2(east side roof): 1909 x 4965 =9478.2 mm2 A1 + A2 =20157.9+9478.2 =29636.1 mm2

ROOF PLAN (including site) Scale: 1:50

Construction as Alchemy ARCH10002

2019 Studio Leader: Paul Di Nello Semester 2 Studio: 12

Name: CHUYIN QI Student Number: 1020385

Part 1C : Steel Shelter

C1


994

column spacing

cL

4000

MEMBER SCHEDULE

848

ROOF SHEET

cL

Beam weled together in mitre joints

cL

profile type:Lysaght Klip-Lok 406/ thickness : 0.48(BMT) / min. roof pitch permitted: 1(1 in 50) / max. span: 2100 / max. allowable span: 1500(single span),1800(end span), 2100(internal span)overhang : 600/ min. radii /

cL

references for this information: http://www.buildinglifeconsultancy.com/content/experimental-project-born

PURLINS

section size:150 / shape: CEE Section / thickness: 1.2 (BMT ) / max. span:4900 / max. spacing:1423(dependant on max.span of roofing) / material: Coldformed steel / finish: galvanised / references: https://professionals.lysaght.com/sites/default/files/technical_specs/ LysaghtZedsCeesPurlinsGirtsUserGuideJune2017.pdf

BEAMS

section size & shape: 180UB16 / max. span:6225 / max. spacing: 3000 / max. cantilever: 1200/material: Hot rolled steel / finish: galvanised / references: https://professionals.lysaght.com/sites/default/files/ LysaghtRoofingWallingInstallationManualJul2015.pdf

COLUMNS

section size & shape:c / material:steel / finish:galvanised / spacing:4000 x 3000/references: https://blackwoods.com.au/steel-and-metals/steel-rhs-rolled-hollow-section/ rhs-rectangles-primed/rhs-steel-c350-150x100x6-0mm-8-0m-lgth/p/02049157

4868

B1

C1

cL

Purlin spacing

Beam spacing

cL cL

1211

cL 1014

cL

1211

cL

1211

cL cL

1498

333

5464

cL

cL

3959 5840

OTHER

cL cL 867

Capping

cL cL

section size: 75PFC& shape : CEE Section/ material:Hot rolled section / finish:galvanised / references:

Beam span

cL

cL

column spacing

3000

P1

https://professionals.lysaght.com/sites/default/files/ LysaghtArchitecturalDetailingManualRoofWallFlashingJune2016.pdf

ROOF FRAMING PLAN Scale: 1:50

4965 955

100

911

ELEVATION 1

3044

786

Lowest height of the roof is 2444 mm

3830

The column extends into the baffle and is connected to the beam by plate

2444

3830

136 74 73 267 236

75 233 266 213

The height of the roof can allow people to go through

ELEVATION 2

Scale: 1:50

Construction as Alchemy ARCH10002

2900

4060

1909

2444

The shelter is 2444 mm above decking and 3044 above ground

100

Scale: 1:50

2019 Studio Leader: Paul Di Nello Semester 2 Studio: 12

Name: CHUYIN QI Student Number: 1020385

Part 1C : Steel Shelter

C2


structure

span

beam sp

an

purlin spa

n

cL

cL

c

197 L

873

The two cappings are connected by wooden boards, which modifies the edge of the shelter

1909

3990

cL

1500

cL

c 334 L

1219

cL

1022

cL

4066 1219

cL

1219

cL

cL197cL

detail

2

7 degree detail

1

Purlin is fixed with beam by using 125 x 75 x 8 purlin cleat plate The gutter is supported by gutter bracket

The underneath is the same roof shelter which is connected with I-beam and purlin

The column is fixed with beam by using 310 x 100 x 10 column cap plate

SECTION A-A [CUTTING ACROSS THE PURLIN CROSS SECTION] Scale: 1:20

Construction as Alchemy ARCH10002

2019 Studio Leader: Paul Di Nello Semester 2 Studio: 12

Name: CHUYIN QI Student Number: 1020385

Part 1C : Steel Shelter

C3


Gutter bracket hang on purins on both sides which helpes to support the gutter

There is a small opening at the end of the edge which becomes a spout

The texture of the roof divert water in to the gutter

Using 75PFC capping on the edge of the shelter Purlin is fixed with beam by using 125 x 75 x 8 purlin cleat plate

type your annotations into this text box and adjust the size of the text box to suit

Using timber to fill the gap between beam and plate

The two cappings are connected by wooden boards, which modifies the edge of the shelter

51x21mm timber prackers are used to provide an extra depth for purlin so that the purlin has the same depth as beam

small overhang on the roof helps to divert the water into the gutter

type your annotations into this text box and adjust the size of the text box to suit

The bottom of the roof is joined together to prevent the water

DETAIL 1: BOX GUTTER DETAIL Scale: 1:5

Construction as Alchemy ARCH10002

2019 Studio Leader: Paul Di Nello Semester 2 Studio: 12

Using 125 x 75 x 8 purlin cleat plate

Using nail to fix the shelter with beam

the top of the shelter is fixed with beam , which makes the structure more stable

The capping use 75PFC which is distributed at the top and bottom of the edge The bottom of the shelter is fixed with capping

Using timber to fill the gap between beam and plate

DETAIL 2: ROOF EDGE DETAIL Scale: 1:5

Name: CHUYIN QI Student Number: 1020385

Part 1C : Steel Shelter

C4


250*28*50mm spout helps to divert the water to the ground

The capping use 75PFC which is distributed at the top and bottom of the edge

The texture of the roof divert water in to the gutter

There is a small opening at the end of the edge which becomes a spout

PERSPECTIVE 1

The opening is not covered by shelter which is suitable for tree to grow freely

The gutter bracket has 500mm for each spacing

The purlin is strong enough to support the shelter

There is a small opening which allows the column pass through

3D HERO VIEW

Construction as Alchemy ARCH10002

PERSPECTIVE 2

2019 Studio Leader: Paul Di Nello Semester 2 Studio: 12

Name: CHUYIN QI Student Number: 1020385

There is a small opening at the end of the edge which becomes a spout

Part 1C : Steel Shelter

C5