2.1.5 Continuous Improvement

Page 1

Version 6.1 January 2024
Improvement 2.1.5
Continuous
2.1.5 Continuous Improvement 2 of 9 Version 6.1 January 2024
Improvement Contents Preamble ............................................................................................................................. 3 Cycle of Continuous Improvement 3 From problem-faced to problem-solved 3 How BigDog ensures compliance .................................................................................... 4 Putting the PDCA Cycle into practice at BigDog 4 The SIF Process 5 The Audit Process ............................................................................................................ 5 Policy Reviews 5 In Summary 6 Supporting Documents ........................................................................................................ 6 Policies 6 Documents 6 Forms ............................................................................................................................... 6 NGO Training 6 NDIS Practice Standards and Quality Indicators 7 2.1 Governance and Operational Management ............................................................... 7 Human Services Quality Framework Standards Indicators 7 Governance and management 7 Feedback, complaints and appeals .................................................................................. 7 Human Resources 7 Delegation of Authority 8 Version Details ..................................................................................................................... 8
2 . 1.5 Continuous

Preamble

BigDog Support Services Pty Ltd (BigDog) is dedicated to a philosophy that requires us to promote the best possible lifestyles for those supported by the service. As we work with people it must be remembered that our own perception of what is right for an individual in their life may not always be how a person may wish to lead their life. The challenge therefore is to embrace all the possibilities and move forward on a journey toward full potential.

If full potential is the aim, then it is essential for any enterprise, person or group of people, who are seeking the best outcomes of an activity, to look at what they are doing, and for them to assess their outcomes against a measurable tool. Working within a continuous improvement model, allows a framework for the measurement of outcomes and the identification of areas that have scope for improvement or change.

Cycle of Continuous Improvement From problem-faced to problem-solved

The PDCA Cycle is a checklist of the four stages which you must go through to get from `problem-faced' to `problem solved'. The four stages are Plan-Do-Check-Act, and they are carried out in the cycle illustrated below.

We use the PDCA Cycle to coordinate BigDog continuous improvement efforts. It both emphasises and demonstrates that improvement programs must start with careful planning, must result in effective action, and must move on again to careful planning in a continuous cycle.

BigDog will also use the PDCA Cycle diagram in team meetings to take stock of what stage improvement initiatives are at, and to choose the appropriate tools to see each stage through to successful completion.

2.1.5 Continuous Improvement 3 of 9 Version 6.1 January 2024

How BigDog ensures compliance

BigDog is subject to many different forms of legislation, standard frameworks, by laws, regulations and case law. BigDog ensures compliance and also is informed of any changes to these requirements by:

Having the directors and workers attend professional development opportunities. These include workshops, training and conferences. All workers and directors are asked to bring back any pertinent information.

Being part of professional associations, which ensure up to date information is provided on any changes including Australian Disability Professionals, National Disability Services and Queensland Council of Social Services.

Management and Directors to be keeping up to date via websites, email and networking.

Having a Service Improvement System to ensure that any changes are put into practice.

Utilising external specialists whenever possible and

Having an internal audit schedule to ensure that policies, procedures, forms and information are regularly reviewed and updated.

Putting the PDCA Cycle into practice at BigDog

2.1.5 Continuous Improvement 4 of 9 Version 6.1 January 2024
Information SIF completed Director and team meeting Approval through SIF register Monitor and audit review

The SIF Process

The process for service delivery forms can be utilised to introduce:

Changes in legislation, Changes in standards, Changes in regulations, Changes in policy,

Changes in industry standards, Changes in practice,

Changes in service delivery,

Suggestions for improvement in service delivery,

Suggestions for improvement in processes, procedures and policies,

Suggestions from worker or client surveys,

Changes developed from feedback, grievances and appeals and Changes from critical incidents, WH&S incidents or hazard reports.

The Audit Process

At the last management team meeting at the end of each calendar year the quality schedule will be approved for the following year, with monthly audits set. It is the responsibility of the management team to ensure that all audits are carried out and that any SIFs are processed, actioned and monitored in a timely manner.

Policy Reviews

This policy will be reviewed every twelve (12) months unless circumstances deem it necessary to review earlier. The review process will involve an analysis of the usefulness of the policy over the period of implementation and to note any changes which are required in order to improve the policy.

Questions which may be considered during the review include:

Have there been any significant changes to relevant legislation?

Is the policy being implemented?

Are procedures being followed?

Is the policy clear?

What has changed that may prompt a change to the policy?

Can their concerns be resolved?

Have particular stakeholders had difficulty with any aspect of the policy?

If minor changes are made to the policy in wording or to clarify the intent, the version number will indicate this by adding a ‘point’ i.e. Version 1.1 indicates the original version with the first round of minor changes made. A significant change to the wording or intent of the policy will be indicated by a new whole number i.e. Version 2.0.

2.1.5 Continuous Improvement 5 of 9 Version 6.1 January 2024

In Summary

A continuous improvement model allows us a framework in which to measure an activity, a process to implement and change, a process to trial and a method to analyse our results. It is also something that is not foreign to us as we enact this process in everyday life without the formality. A continuous improvement model is not just something that has been drawn up to ensure that as service providers we strive for excellence, it is in fact how most of us behaved in our day to day lives.

However, as a service provider it is up to us to ensure that we do whatever is required to provide the opportunity for this to be formalised with service recipients, so that we have measurable, accountable and transparent mechanisms. Both the informal self-model described and the more formal programmed description both play an equal part in appropriate service delivery.

Supporting Documents Policies

2.1 Governance and Operational Management

2.1.4 Strategic Planning

2.3 Quality Management

Documents

Corporate Risk Management

Professional Development Forms

Client Grievance Report

Worker Grievance Report

Have a Say PATH plans

NGO Training

Managing Change

Positive Alternate Tomorrows with Hope (PATH)

2.1.5 Continuous Improvement 6 of 9 Version 6.1 January 2024

NDIS Practice Standards and Quality Indicators

BigDog Support Services Pty Ltd (BigDog) is a registered NDIS provider and is required to apply the scheme’s practice standard and quality indicators.

The standards have been developed to create an important benchmark to assess provider performance and ensure that high quality and safe supports and services are provided to NDIS participants.

The four core modules are:

1.0 Rights and Responsibilities;

2.0 Governance and Operational Management;

3.0 The Provision of Supports; and

4.0 The Support Provision Environment.

The supplementary modules cover:

5.0 Specialist Support

5.1 High intensity daily personal activities.

5.3 Implementing behaviour support plans.

2.1 Governance and Operational Management

Each participant’s support is overseen by robust governance and operational management systems relevant (proportionate) to the size, and scale of the provider and the scope and complexity of supports delivered.

2.1.5 The performance of management, including responses to individual issues, is monitored by the governing body to drive continuous improvement in management practices.

Human Services Quality Framework Standards Indicators

Governance and management

1.5 Mechanisms for continuous improvement are demonstrated in BigDog management and service delivery processes

Feedback, complaints and appeals

5.4 BigDog demonstrates that feedback, complaints and appeals processes lead to improvements within the service and that outcomes are communicated to relevant stakeholders

Human Resources

6.3 BigDog provides people working in BigDog with induction, training and development opportunities relevant to their roles.

2.1.5 Continuous Improvement 7 of 9 Version 6.1 January 2024

Delegation of Authority

Name Position Details

Steven Paull Director Authorise review and implementation

Courtney Carroll Director Authorise review and implementation

David Burrett Operations Manager Ensure information dissemination

Monique Paull HR Lawyer Ensure compliance by workers

Steven Paull PATH Facilitator Facilitate PATH Planning

Version Details

This policy will be reviewed every twelve (12) months unless circumstances deem it necessary to review earlier. The review process will involve an analysis of the usefulness of the policy and to note any changes which are required to improve the policy.

If minor changes are made in wording or to clarify the intent, the version number will indicate this by adding a ‘point’ i.e. Version 1.0 indicates the original version and 1.1 with the first round of minor changes made. A significant change or intent of the policy will be indicated by a whole new number i.e. Version 2.0.

The following rules also apply in interpreting this policy:

• Headings are for convenience only and do not affect interpretation.

• A singular word includes the plural and vice versa.

• A word that suggests one gender includes the other genders.

2.1.5 Continuous Improvement 8 of 9 Version 6.1 January 2024
Date V Details July 2009 1 New Policy August 2010 1.1 Inclusion of PDCA diagrams “Service Provider” to BigDog September 2010 1.2 Continuous Improvement Register, descriptor paragraph and form July 2011 ratified Community Committee – ratified policy March 2012 1.3 Header – new logo and page of pages applied October 2013 2.0 HSQF Standards replace Service Standard Indicators Inclusion of PATH Training sub-heading added to Supporting Documents Word converted to Office 2013 DOCX February 2015 2.1 Updated term ‘Client’ to NDIS term ‘Participant’ July 2016 3.0 Changed from a policy to a procedure Deleted reference to the Continuous Improvement Register

Updated policies and procedure references

information on ensuring compliance with legislation, standards and quality management

Updated to new logo and formatting

Included Operations Manager

Removed Procedure from title

Updated HSQF policies and documents

Included cover page and contents

Updated Responsible Officers details

Changed director to directors.

Introduction of BigDog Training Portal and modules

Policy includes NDIS Service Standards and title updated to 2.1.5 Continuous Improvement. Included Policy Reviews and updated responsible officers

review process included.

2.1.5 Continuous Improvement 9 of 9 Version 6.1 January 2024 Date V Details
August 2016 3.1
January 2019 4.0
Added
January 2021 4.1
May
6.0
2023
January 2024 6.1
Policy

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.