3 minute read

Rates increase of 7.8% in difficult times

Councillors unanimously agreed the Annual Plan 2023-24 Budget proposal on Thursday, which maintains current levels of service and continues a significant capital expenditure programme focused on Marlborough’s core infrastructure needs.

A number of small new expenditure items were supported, leaving an overall proposed rates increase of 7.8% for the year beginning 1 July 2023.

Mayor Nadine Taylor said it was a very unusual year.

The proposed rise of 7.8% was set at a full council budget meeting on Thursday.

Marlborough District Council chief financial officer Martin Fletcher said the council was “pitching in the middle” if not the “lower end” of proposed rates rises across the country.

Other regions across the country were also facing increases.

Environment Canterbury was facing an average 10% rates rise, Wellington City Council proposed 12.8%, Palmerston North City Council a 6.4% rise and Waikato Regional Council 6.1%.

Blenheim ward councillor Jamie Arbuckle said he had struggled to see how the council could keep the rise below 10%, given the “current climate” – referring to the cost of living, high inflation and the number of government regulations the council faced. But he thought to go through with a starting point under 8% was a “good starting point” for consultation.

“I know some people will react with a knee-jerk reaction to whatever increase we put out,” he said.

Mayor Nadine Taylor says

“Like every council in New Zealand, we are facing much higher than normal levels of inflation, with the Consumer Price Index expected to peak at over 7% this year. Supply chain issues are driving up costs and affecting many parts of the New Zealand economy, including local government.

The two biggest drivers of Council’s rates increases are the Local Government Cost Index (LGCI) and capital expenditure.

The LGCI is a price index that includes the cost of bitumen and water pipes - in other words the main goods and services that local government purchases.

This year’s LGCI was forecast to be 2.4% but is actually running at 5.9%.

New Government requirements on councils and the increasing cost of servicing debt are also major factors.”

Nadine said Council’s proposed Budget maintains its capital expenditure programme - primarily in roading, sewerage and water treatment - and no services had been cut from the next ten year period.

“However we have reviewed our

75

Suited for drilling metal, wood and plastic. For use in portable and pedestal drilling machines.

user pays fees and we’ve reduced expenditure where possible.

“New revenue sources have also been identified and we’ve made good use of three of our reserves – the Infrastructure Upgrade, Depreciation and Covid-19 Rates Relief reserves.

In other words, we’ve worked hard to address this inflationary challenge and made every effort to bring down what would have been a much bigger rates increase - well above 10 per cent - without cutting public services.” continuing its investment in core services including roads and footpaths, flood protection, water supply, sewerage and environmental management. control - would see increases.

Release Date: February 2023

Release Date: February 2023

Release Date: February 2023

“I’m very aware of the cost of living pressures on households and recognise that 7.8% is a relatively high rates increase.

75

Suited for drilling metal, wood and plastic. For use in portable and pedestal drilling machines.

She said residents could also be reassured that despite the inflationary pressures, Council was

“By increasing those fees we are reducing the impact on ratepayers next year by just over $1 million - we believe that that is a fairer way of spreading our costs. Most of our fees are at least 60 per cent funded by user pays and we want to maintain that proportionality.”

Suited for drilling metal, wood and plastic. For use in portable and pedestal drilling machines.

Suited for drilling metal, wood and plastic. For use in portable and pedestal drilling machines.

It’s not something that any mayor or councillor wants to propose but our budgets are under significant inflationary and interest cost pressure - and it’s the same for every council in the country.”

She said Council’s user pays fees - including resource consenting, environmental health and building

Release Date: February 2023

The 2023-24 Annual Plan Consultation Document will be adopted by the Council at its 6 April meeting. Public consultation will be open for submissions from 6 April to 8 May 2023. Public hearings are on 6, 7 and 8 June with the final Annual Plan 2023-24 adopted on 29 June.

75 Pce HSS-Bright Drill Set

135° Split Point Minimiseswandering whenstarting

SPECIAL PRICE $99

135° Split Point Minimiseswandering whenstarting

Suited for drilling metal, wood and plastic. For use in portable and pedestal drilling machines. Contents whenstarting

This article is from: