+Brittany Peters
Professional Work 2019
[phone] 304-550-4638 [website] www.brittanypeters.net [email] brittcole9589@gmail.com
PAGE 2/16
+OFFICE & MULTI-FAMILY
+Office (top left) | Atlanta, Georgia +Responsibilities: Assist with Construction Documents. Including, Life Safety drawings, detailing, and door & partition schedules. +Office (bottom left) | Chamblee, Georgia +Responsibilities: Assist with Construction Documents and Revit construction. A large focus on the elevator lobbies and grand stair construction. Material, lighting, and wall notations, as well as door and partition schedules were also in my scope. +Multi-Family (above) | Atlanta, Georgia +Responsibilities: Collaboration with another design firm. Assist with final material changes, glass/balcony shop drawings, as well as checking glass ratios against building code requirements.
COPYRIGHT © 2016: MSTSD, INC.
PAGE 3/16
1' - 4"
8"
1' - 0"
1.0 8"
2' - 0"
MSTSD, INC.
TYP.
5 CAST STONE PATTERN 1/2" = 1'-0"
7 12' - 0"
12' - 0"
2017.01.13 - ISSUED FOR CONSTRUCTION
2' - 0"
4"
1.0
B.O. DECK - HIGH POINT 46' - 11"
1.0
No.
1.0
1.0
revisions Date
Description
1.0
1.0
1.0
1.0
FA 1
M1
3
4"
4" 26' - 0"
GF 4
GF 1
T
EQ
GF 3
EQ
EQ
1' - 7"
T
P1
GF 4 T
GF 3
GF 1
T
T
GF 3
CS 6
T
T
T
T
T
= TEMPERED GLASS
drawn by
MRJ
checked by
CS 4
1
2 NORTH ENLARGED ELEVATION
1/4" = 1'-0"
SLOPE AWAY FROM BLDG: 1/8" / 12" MIN.
SLOPE AWAY FROM BLDG: 1/8" / 12" MIN.
3' - 6"
A210
18' - 0"
3' - 6 1/8" This drawing is the property of the architect and may not be reproduced or used without his written permission.
submittals
3 ELEVATION SOUTH - BLDG A
STUCCO
project name
NEW WALL BEYOND
A502
PACES FERRY PLAZA PACES FERRY PLAZA project name
NEW WALL BEYOND
STUCCO
4
43
1
A303
A304
REGENCY CENTERS
2 WALL SECTION 2 WALL SECTION
BNP
3/4" = 1'-0"
+Master Plan (left) +Alpharetta, Georgia +Transformed sketch into working master plan. +Calculated & executed parking requirements +Organized multi-family units and green spaces
10' - 9" 4' - 4" 6' - 1"
49
1
2
3
4
1
2
A305
A305
A305
A305
A306
A306
53 52
51
TJM
No.
3/4" = 1'-0"
45
3/4" = 1'-0"
2012-043
A303 A303 sheet no.
sheet no.
2' - 4"
EQ
EQ
10' - 9"
4' - 4"
17' - 6"
5' - 0"
3' - 10"
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
8' - 3" 2' - 2"
6' - 5"
19' - 0"
2"
4' - 0"
5' - 0"
4' - 6"
2' - 3"
9' - 6"
2' - 3"
5' - 0"
4' - 6"
4' - 0"
17' - 3"
architect's seal
3/16" = 1'-0"
20' - 1 1/2"
25' - 0 1/8"
20' - 1 1/2"
91' - 10 1/2"
35' - 0"
1
2
A301
A301
4
3
A301
A301
45' - 5 7/8"
54
41
20' - 5 7/8"
3
2
1 A302
55
4
A302
A302
46' - 0"
A302
2
1
A303
A303
3
42
43
A303
20' - 0"
project name
20' - 6"
PACES FERRY PLAZA
20' - 6"
EQ
EQ
EQ
EQ
EQ
EQ
3' - 4"
3' - 0"
10' - 0"
EQ
12' - 3"
3' - 4"
15' - 0"
EQ
EQ
EQ 10' - 0"
3' - 0"
EQ
EQ EQ
5' - 3"
SECTION Description 3 WALL
46
2 ELEVATION 2 - BLDG A
40
Date
2012-043
EQ
6' - 9"
revisions
4 WALL SECTION
project no.
8' - 3" 5' - 0"
1' - 0"
50
project no.
TJM
checked by
3/16" = 1'-0"
10' - 9"
3/4" = 1'-0"
2' - 4"
44
4 A304
WALL SECTIONS
WALLdrawn SECTIONS checked by by
1 WALL SECTION 1 WALL SECTION
3/4" = 1'-0"
3/4" = 1'-0"
A304
A304
3535 NORTHSIDE PKWY ATLANTA, GA. 30327 3535 NORTHSIDE PKWY sheet title ATLANTA, GA. 30327
drawn by
3
2
REGENCY CENTERS
BNP
3/4" = 1'-0"
3/4" = 1'-0"
3' - 6"
Issue Date
A502
3
sheet no.
3 WALL SECTION 3 WALL SECTION
21' - 9"
101' - 0"
A502
3
sheet title
3/4" = 1'-0"
21' - 9"
3' - 6"
2
4
3
3/4" = 1'-0"
21' - 9"
2
A303
4 WALL SECTION 4 WALL SECTION
3' - 1"
A502
2012-043
4
1 NORTH ENLARGED ELEVATION
1/4" = 1'-0"
A301
Atlanta, Georgia 30309 404.962.9680
3/4" E.G. GYP SHEATHING CONTINUOUS architect's seal AIR & WEATHER BARRIER CONTINUOUS architect's seal AIR & WEATHER BARRIER
A502
A503
1776 Peachtree Road, N.W.
6" MTL STUD FRAMING 16" O.C. 3/4" E.G. GYP SHEATHING
ALUMINUM STOREFRONT WINDOW
project no.
PJD
MSTSD, INC. SLOPE AWAY FROM BLDG: 1/8" / 12" MIN.
Suite 700 South
ENLARGED EXTERIOR ELEVATIONS
3/4" E.G. GYP SHEATHING
A502
5/8" GYP BOARD 5/8" GYP BOARD 6" MTL STUD FRAMING 16" O.C.
ALUMINUM STOREFRONT
sheet title
M1
4
1
A503
A502
A503
CS 4
3/4" E.G. GYP SHEATHING
6
A502
10'-0" AFF T.O. STOREFRONT 9'-4" AFF T.O. EXISTING
ALUMINUM STOREFRONT
3535 NORTHSIDE PKWY ATLANTA, GA. 30327
3/4" E.G. GYP SHEATHING
LEVEL 1 24' - 6"
69' - 0"
2
MTL CANOPY BEYOND
ALUMINUM STOREFRONT WINDOW
5/8" GYP BOARD
CS 3
LEVEL 1 24' - 6"
CS 4
5/8" GYP BOARD
9'-4" AFF T.O. EXISTING
1
CS 4
101' - 0"
10'-0" AFF T.O. STOREFRONT
A502
A502
5/8" GYP BOARD
M1
47
EXISTING WALL
1' - 5"
T
MTL CANOPY BEYOND
8
PACES FERRY 8 PLAZA
REGENCY CENTERS
C
SF 1
CS 3
1 A307
EXISTING WALL
6" MTL STUD FRAMING
C
T
T
4 A306
A502
project name
6" MTL STUD FRAMING
2' - 0"
CW 1
GF 2
FA 1
2' - 0"
GF 4
8"
3' - 6 3/4"
3' - 6 1/4"
GF 3
GF 3
2' - 4"
1' - 6" GF 1
EQ
Printed: 4/21/2017 6:00:18 PM
GF 2
EQ
4"
GF 2 23' - 0"
EQ GF 3
8" 4" 2' - 8"
3' - 9"
MTL 1
GF 1
EQ
3' - 8"
GF 4
EQ GF 2
7' - 0"
1' - 7"
7' - 4"
EQ
6' - 6"
EQ
3' - 6"
EQ
7' - 0"
EQ
10'-0" AFF T.O. EXISTING
12' - 0"
EQ
2' - 0"
EQ
Printed: 4/21/2017 6:00:18 PM
EQ
7' - 2"
EQ
18' - 0"
EQ
10' - 2"
EQ
3' - 7"
EQ
3' - 8"
EQ
10'-0" AFF T.O. EXISTING
6" MTL STUD FRAMING
3 A306
6
B.O. DECK - HIGH POINT 46' - 11"
E
10'-0" AFF T.O. EXISTING
CS 5
3' - 8"
2' - 6"
EQ
1' - 6"
EQ
3' - 5"
GF 1 31' - 11"
EQ
5
A503 A503
A502
A503
48
ALUMINUM COMPOSITE PANEL
5
MTL 1
EQ
B.O. DECK - HIGH POINT 46' - 11"
1' - 6"
CW 1
28' - 8"
1' - 6"
8
5
Description Description
13'-0" AFF T.O. METAL PANEL 13'-0" AFF T.O. METAL PANEL ALUMINUM COMPOSITE PANEL
1' - 0" TYP.
10' - 8"
7' - 6"
28' - 11"
Date
Date
STEEL ANGLE
A502
EXISTING WALL
1' - 0" TYP.
13' - 0" 56' - 5" 1' - 6"
No.
STEEL ANGLE A502
7
EXISTING WALL
T.O. FRONT PARAPET 53' - 2"
EXISTING WALL
M2
No.
CAST STONE
7
EXISTING WALL
7' - 0"
EIFS 1
17'-0" AFF revisions T.O. MASONRY
17'-0" AFF T.O. MASONRY CAST STONE
EXISTING WALL EXISTING WALL
1/2" REVEALS IN EIFS - TYP.
12' - 0"
Sim
BENT PLATE
17'-0" AFF T.O. MASONRY
revisions
CAST STONE
BRICK
A310 26' - 0" CS 1
7' - 0"
5
A210
18'-8" AFF T.O. MASONRY BENT PLATE
A502
STUCCO
architect's seal
2
T.O. ENTRY PARAPET 57' - 4"
CS 2
5' - 1"
BENT PLATE
STUCCO
16'-8" AFF B.O. MASONRY & T.O. TILE BRICK
6
EXISTING WALL
18'-8" AFF T.O. MASONRY
A502
10
18'-8" AFF BENT PLATE T.O. MASONRY
17'-0" AFF CAST STONE T.O. MASONRY
16'-8" AFF B.O. MASONRY & T.O. TILE
A310
5
2017.04.07 - ISSUE FOR CONSTRUCTION
2017.04.07 - ISSUE FOR CONSTRUCTION
10
18'-8" AFF T.O. MASONRY 18'-8" AFF T.O. EXISTING 18'-8" AFF T.O. EXISTING
1/4" = 1'-0"
4
3 A310
4
BRICK VENEER
PRE CAST COPING PRE CAST COPING
18'-8" AFF T.O. EXISTING MASONRY
7' - 0"
3 NORTH ENLARGED ELEVATION
1/4" = 1'-0"
2
12' - 0"
18'-8" AFF T.O. EXISTING MASONRY
4 NORTH ENLARGED ELEVATION A301
CS 4
7' - 0"
submittals
EQ
EQ
EQ
3' - 0"
4' - 6"
EQ
EQ
EQ
EQ
EQ
20' - 0" 4' - 6"
19' - 0"
12' - 0"
BRICK
This drawing is the property of the architect and may not be reproduced or used without his written permission.
EQ
EQ
EQ
45' - 9" 4' - 6"
5' - 6"
8' - 7"
10' - 6"
5' - 6"
24' - 6"
REGENCY CENTERS
3535 NORTHSIDE PKWY ATLANTA, GA. 30327 sheet title
23' - 0" 19' - 0"
1' - 0"
91' - 9"
EXTERIOR ELEVATIONS drawn by
20' - 0"
Author MATCHLINE
CS 4
7' - 0"
BRICK VENEER
LEVEL 1
6" MTL 24' - 6" CONTINUOUS FRAMING AIR & WEATHER BARRIER CONTINUOUS AIR & WEATHER BARRIER
16'-8" AFF B.O. MASONRY & T.O. TILE
1776 Peachtree Road, N.W.
This drawing is the property of the architect and may not submittals be reproduced or used without his written permission.
2' - 0"
12' - 0"
CONTINUOUS AIR & WEATHER BARRIER
WALL BEYOND
1' - 0"
T
Printed: 4/21/2017 6:00:18 PM
T
3' - 6"
CS 4
7' - 0"
5
T
16' - 6"
CS 4 30' - 0"
A603
7' - 0"
M1
T
2' - 8"
T
2' - 8"
T
LEVEL 1 24' - 6"
CS 4
EQ
M1
T
EQ
EQ
T
Atlanta, Georgia 30309 404.962.9680
25' - 10"
T
7' - 0"
7' - 0" 3' - 6"
4" 2' - 8"
M1
8"
T
Suite 700 South 404.962.9680
JUNCTION BOX FOR SIGNAGE & LIGHTING JUNCTION BOX FOR SIGNAGE & LIGHTING
10' - 7"
EQ
7' - 0"
2' - 0"
10' - 0"
3' - 9"
EQ
T
CONTINUOUS AIR & WEATHER BARRIER
17' - 7"
EQ
T
22'-8" AFF T.O. MASONRY
22'-8" AFF T.O. MASONRY
EXISTING PARAPET TO BE REMOVED EXISTING PARAPET WALL BEYOND TO BE REMOVED
1 / A201
EQ
T
22'-8" AFF MSTSD, INC. Suite 700 South T.O. MASONRY 1776 Peachtree Road, N.W.30309 Atlanta, Georgia
22'-8" AFF T.O. MASONRY
4' - 6"
23'-8" AFF 3/4" E.G. GYP T.O. MASONRY SHEATHING
3/4" E.G. GYP SHEATHING JUNCTION BOX FOR SIGNAGE & LIGHTING JUNCTION BOX 6" MTL FOR SIGNAGE & LIGHTING FRAMING
CS 3
24' - 4"
EQ
T
MSTSD, INC. BRICK
23'-8" AFF T.O. MASONRY
SF 1
CS 3
Printed: 1/6/2017 6:00:26 PM
3' - 3"
T
4' - 6"
C
9
9
A503
CS 3
1 / A201
C SF 1
CS 3
MATCHLINE
C
A503
7' - 0" T
3' - 4"
7' - 0" CS 4
SF 1
T T
MATCHLINE
7" 2' - 11"
C
B
SF 1
P1
DOOR STILES & RAILS ONLY
24'-8" AFF T.O. MASONRY BRICK
24'-8" AFF T.O. MASONRY
MTL 1 B
CONTINUOUS AIR & WEATHER BARRIER
24'-8" AFF T.O. MASONRY
24'-8" AFF T.O. MASONRY
12' - 0"
FA 1
EQ
FA 1
31' - 0"
6" MTL FRAMING
18'-8" AFF T.O. EXISTING MASONRY
EQ
1' - 11"
1' - 11"
2' - 4" 4"
CS 5
EQ
E E CS 5
EQ
E
CS 5
23'-8" AFF T.O. MASONRY
JUNCTION BOX FOR SIGNAGE & LIGHTING
EQ
1' - 0" TYP.
7' - 1"
B.O. DECK - HIGH POINT 46' - 11"
EIFS 1
CS 2
M2
4' - 6"
9
A503
3/4" E.G. GYP SHEATHING
1' - 0" TYP. 10' - 8"
1' - 0" TYP.
1' - 0" TYP.
5
submittals
12' - 0"
T.O. FRONT PARAPET 53' - 2"
EIFS 1
A210
This drawing is the property of the architect and may not be reproduced or used without his written permission.
8
1/2" REVEALS IN EIFS - TYP. CS 1
12' - 0"
2 / A201
12' - 0"
MATCHLINE
2' - 0" T.O. FRONT PARAPET 53' - 2"
11' - 4"
A311
3' - 6 3/8"
11' - 1"
12' - 0"
1 ELEVATION 1 - BLDG A 3/16" = 1'-0"
+Retail (top left & right): New Construction & Renovation | Atlanta, Georgia +Create a new, free-standing grocery store shell, and renovate the facade of the adjacent shopping center. +Responsibilities (Grocery Store): Material selections. Assist in detailing of the grocery store, both plans and wall sections. Research and execute loading dock and parking drainage and lighting. Coordinate structural drawings with our Revit model. +Responsibilities (Renovation): Use personal field measurements to create existing conditions in Revit. Material selections. Discuss design concepts with client and consultants. Create entire construction document set, including demolition and detail views.
checked by
Checker
project no.
2012-043
2 / A201
1
12
1/2" REVEALS IN EIFS - TYP.
12' - 0"
9' - 6"
11
A311 CS 1
12' - 0"
Atlanta, Georgia 30309 404.962.9680
COPYRIGHT © 2016: MSTSD, INC.
3
10
A311
10' - 0"
1776 Peachtree Road, N.W. Suite 700 South
COPYRIGHT © 2016: MSTSD, INC.
2
9 2' - 0"
+RETAIL & MASTER PLANNING
8"
1' - 4"
1' - 0"
4"
8" 1' - 4"
B.O. DECK - LOW POINT 43' - 8" 8"
A201 sheet no.
+Brittany Peters School Projects
[phone] 304-550-4638 [website] www.brittanypeters.net [email] brittcole9589@gmail.com
PAGE 5/16
+NEUHOFF ARTIST COMMUNITY
0
50’’ 1 100’
200’
400’
+Fourth Year Spring, Off-Campus Study +Partners: Journey Roth + Ruxin Tao +Program: Transform Neuhoff Slaughterhouse campus ruins into a new Nashville neighborhood for artists. +Location: Nashville Tennessee +Objectives: Each section of the site was addressed by a different team member. Together we created a walkable neighborhood that combines residential, retail, and event spaces. My section, the old Holding Pen, was designed to be a high-end furniture showroom and fitness center for those living in the residential units. Each space is connected to one another through the landscaping.
PAGE 6/16
+URBAN GRAND HOTEL
+Fourth Year Spring +Program: An urban hotel with rooftop bar and conference center, with easy access into the neighborhood surrounding it. +Location: Downtown Nashville, Tennessee +Objectives: Create an urban hotel in which visitors can dine, relax, and enjoy the city life at a grand scale. The neighborhood and grounds are designed to constantly direct one’s attention back out into the landscape and city. The large circular atrium pulls the visitor towards the sky then pushes them back out towards the Nashville skyline on the rooftop.
PAGE 7/16
+TENNESSEE VALLEY AUTHORITY (TVA) MUSEUM
+Fourth Year Fall, Integrations +Partners: Elizabeth Carter + Allison Sonnenberg +Program: A 300,000 sqft Museum for the Tennessee Valley Authority. Including a Visitor’s Center, Boat Marina connection to the Greenway, and Restaurant. +Location: Knoxville, Tennessee +Objectives: Create an environmentally conscience, open plan interior that is flexible enough that it can be adapted for several uses and exhibits.
PAGE 8/16
+STUDY ABROAD: FINLAND STUDIO
+Third Year Summer, Study Abroad Finland +Program: Design spaces in which students will Live, Dream, and Pray while attending the Finland Summer Architecture Institute. +Location: Helsinki, Finland +Objectives: Using different materials for each programmatic element allows one to experience special moments from different vantage points when moving through the site.
PAGE 9/16
+WOODLAND CEMETERY VISITOR’S CENTER
+First Year Spring +Program: A Visitor’s Center with a small gallery. +Location: Skogskyrkogården, Sweden +Objectives: Embrace the vast forest that surrounds the cemetery to create an appropriate learning space.
PAGE 10/16
+LAWSON MCGHEE LIBRARY ADDITION
+Third Year Spring +Program: Expansion to the existing Lawson McGhee Library, with emphasis on areas for technology, children and retail. +Location: Knoxville, Tennessee +Objectives: Introduce a large Reading Atrium surrounded by different aspects of the program.
PAGE 11/16
+MODELS
PAGE 12/16
+SKETCHES & DRAWINGS
PAGE 13/16
+STUDY ABROAD: ITALY SKETCHES
PAGE 14/16
+PHOTOGRAPHY
PAGE 15/16
+PHOTOGRAPHY
+Thank You.
[phone] 304-550-4638 [website] www.brittanypeters.net [email] brittcole9589@gmail.com