BRYAN FAN
Architecture Portfolio 2011-2013
2
4 ................................................. SIR CONAN DOYLE MYSTER THEATER 16 ........................................................... CITY OF WYNDHAM GATEWAY 28 ................................................................................... CARA(S)PACE 36 ..................................................................................... BODYSPACE 44 .............................................................. STUDLEY PARK BOATHOUSE 52 .......................................... ABORIGINAL ARTS AND CULTURE CENTRE 60 ............................................................... DOCUMENTATION PROJECT 70 ............................................................................. OTHER PROJECTS 76 ........................................................... PROFESSIONAL EXPERIENCES 3
4
SIR CONAN DOYLE MYSTERY THEATRE
Studio Fire, Semester 2 2013
5
6
SIR CONAN DOYLE MYSTERY THEATRE
Sir Conan Doyle Mystery Theatre is dedication to Sir Arthur Conan Doyle, the authur of Sherlock Holmes detective stories. Located at the junction of Spencer Street and Bourke Street, the theatre challenges the conventional Theatre typologies with the stage opens to both the public and the paid audience. Its simplistic form and ornamental facade reflects the site location between a heritage listed area and the contemporary designed Southern Cross Station. The concept of “double skin� creates a dialogue between its external form and the internal volume of the Theatre functions. In addition to the light and shadow effects, the concept provide a sense of mystery and illusion to visitors. Programs are connected by a single ramp between the building skin and internal volume. The ambience and elegance of the architecture transcends the building into a piece of public art work and place making qualities to the western side of Melbourne CBD. The theatre will be an iconic festival place suitable for both day and night time activities. 7
Dual opening Fly Tower 8
Major Circulation
SIR CONAN DOYLE MYSTERY THEATRE Facade
Structure
Lift Shaft/ Fire stairs
Skylight Blackbox Theatre Dress rooms/ Rehearsal Room Balcony Entry Proscenium Theatre Flytower
Amphitheater/ Plaza Gallery Cinema 9
10
SIR CONAN DOYLE MYSTERY THEATRE
11
North elevation
12
East Elevation
West Elevation
SIR CONAN DOYLE MYSTERY THEATRE
13
14
SIR CONAN DOYLE MYSTERY THEATRE
15
16
CITY OF WYNDHAM GATEWAY
Studio AIR, Semester 1 2013
(in collaboration with Vincent Kong and Lisa Huang)
17
18
CITY OF WYNDHAM GATEWAY
The City of Wyndham Gateway project explores the impact of computation on architectural design. The design was aimed for a place making quality which helps the development of a community identity for the City of Wyndham. The theme of duality is used to sparkle longevity with the juxtapositions of defining new boundary of Wyndham, creating a cohesive cultural form symbolized the unity of the community, and to create a phenomenon of mutual and unique experience. The aspiration is to design a self-defining structure, which creates communal identity, through a non-discriminative design process. The design was chosen as one of the best works of Studio AIR and was invited by the faculty to design a pavilion based on the same design algorithm. (Refer to later projects)
19
20
CITY OF WYNDHAM GATEWAY
21
22
CITY OF WYNDHAM GATEWAY
Aesthetics evolves with time
23
24
CITY OF WYNDHAM GATEWAY
25
26
CITY OF WYNDHAM GATEWAY
27
28
CARA(S)PACE
MSDx 2013
(in collaboration with David Lister and Vincent Kong)
29
30
CARA(S)PACE
Cara(s)pace was a commissioned bar and installation for MSDx, the annual exhibition by the Melbourne School of Design. The design emerged from research into digital detailing and fabrication techniques of composite panels and employs an experimental structural system of flexible sheet metal that is actively bent and restrained by the panels. Like exoskeletal systems found in nature, this reciprocal structural system acts as surface and performative ornament and is informed by the heterogeneous localised conditions across the surface geometry, varying in density and depth. The brief called for two separate bar units to cater for future events of various size and an additional element was added to separate serving space and storage as well as create a wayfinding device amongst the campus for the event. The three design elements work individually or are locked together, the accuracy of geometry and fabrication allowing for seamless continuity with incredibly tight tolerances. The design uses 14 1200Ă—1200 sheets of lasercut 1mm steel sheet and 8 1200Ă—2400 aluminium composite panels, utilising CNC router engraving for sheet forming and profile cuts for connection details and panel cutout. 31
32
CARA(S)PACE
33
34
CARA(S)PACE
35
36
BODYSPACE
Virtual Environments, Semester 1 2011
37
38
BODYSPACE
BODYSPACE is a 1st year studio project that explores elementary computation design in building complex forms (i.e Lantern) out of paper, which can be worn on the body. The concept of based of stalactites its layering process. The layering allows lights to penetrates through which illuminates the lantern in a unique fashion. An ivory card rib structure was developed to support the panels strip which are made of cartridge paper. The design was selected as one of best works of Virtual Environments Semester 1 2011.
39
40
BODYSPACE
41
42
BODYSPACE
43
44
STUDLEY PARK BOATHOUSE
Studio WATER, Semester 2 2012
45
46
STUDLEY PARK BOATHOUSE
Studley Park Boat House project redesigns existing disrepair boathouse in the manner of a great architecture master. In this case, the works of Australian architect Glenn Murcutt was studied for this project. The boathouse consists of Restaurants, Cafes, Kiosk, open space and boat storage space. The connection to the wharf creates a new gathering space in front of the river.
47
North Elevation
South Elevation
48
STUDLEY PARK BOATHOUSE
49
Study model of Glen Murcutt’s Marie Short House
50
STUDLEY PARK BOATHOUSE
51
52
ABORIGINAL ARTS AND CULTURE CENTRE
Studio EARTH, Semester 1 2012
53
The Aboriginal Arts and Culture Centre situates on Herring Island Victoria. It explores the tension between prospect and refuge, between the settler and the aboriginal people of Australia. The theme of duality on the building form symbolizes the unity and difference between the settlers and the Aboriginals. Semi-underground exhibition space conceives the dark ages of aboriginal people. Water is the key concept of the design considering the importance of Yarra River to the Wurundjeri people (Aboriginal tribe settled around Melbourne). The undulating roof for is an abstraction of the water symbol of the aboriginal people whereas the amphitheater emphasized the yarra river as the background.
54
ABORIGINAL ARTS AND CULTURE CENTRE
55
56
ABORIGINAL ARTS AND CULTURE CENTRE
57
58
ABORIGINAL ARTS AND CULTURE CENTRE
59
60
DOCUMENTATION PROJECT
Construction Design, Semester 1 2013
61
62
DOCUMENTATION PROJECT
63
64
DOCUMENTATION PROJECT
65
66
DOCUMENTATION PROJECT
67
68
DOCUMENTATION PROJECT
69
70
OTHER WORKS
Drawings, Sketches, Parametric experiments
71
Cinema Interior Project
72
OTHER WORKS
Pencil sketch of South Lawn, University of Melbourne Visual Communication, Semester 1 2012
73
74
75
76
PROFESSIONAL EXPERIENCE
HjL Architecture, Melbourne
June 2013
77
Interior exploration for an unnamed project, courtesy of HjL Architecture
78
79
80
PROFESSIONAL EXPERIENCE Spence Robinson Ltd, Hong Kong
Dec 2012 - Feb 2013
81
3D reconstruction of Tin Chung Court Hong Kong, courtesy of Spence Robinson Ltd
82
83
NOTES :
U.F.A. & U.F.S. CALCULATION DOMESTIC (F22 - F24)
21
8P
FLAT NOS.
FLAT TYPE
01, 02, 03, 06, 07, 08, 10, 11, 12, 15, 16 & 17
NOS.
UFA (m²)
SUB-TOTAL OF UFA (m²)
UFS (m²)
SUB-TOTAL OF UFS (m²)
7P
12
1 + 2 = 22.220 + 4.698
12 x 26.918 = 323.016
1 + 2 + 3 = 22.220 + 4.698 + 3.650
30.568 x 12 = 366.816
8P
2
4 + 5 = 28.828 + 4.699
2 x 33.527 = 67.054
4 + 5 + 6 = 28.828 + 4.699 + 3.832
37.359 x 2 = 74.718
3
7 + 8 = 29.305 + 4.641
3 x 33.946 = 101.838
7 + 8 + 9 = 29.305 + 4.641 + 3.884
= 26.918
7P
2 3
= 30.568
7P 19
7P
05, 09 & 14
9P
= 33.527 = 33.946
= 37.359
491.908
TOTAL UFA PER FLOOR SUB-TOTAL (3 STOREY)
HOUSING DEPARTMENT SITE OFFICE
37.830 x 3 = 113.490
28-09-2012
WJ
Rev. 1
16-10-2012
CWL
18
7P 30 8P
555.024
TOTAL UFS PER FLOOR SUB-TOTAL (3 STOREY)
491.908 x 3 = 1,475.724
Rev. 0
7P 29
= 37.830
負責人
20
28
04 & 13
日期
修訂版本
7P
1 27
5
555.024 x 3 = 1,665.072
4
31
6
9P
7P
32
33
7P
7P 34
17
16
15
14
7 7P 9
DOMESTIC (F5 - F21)
7P
7P
9P
8 7P
FLAT NOS.
FLAT TYPE
01, 02, 03, 06, 07, 08, 10, 11, 12, 15, 16, 17, 18, 19, 20, 23, 24, 25, 27, 28, 29, 32, 33 & 34
NOS.
7P
UFA (m²)
SUB-TOTAL OF UFA (m²)
UFS (m²)
24
1 + 2 = 22.220 + 4.698
24 x 26.918 = 646.032
1 + 2 + 3 = 22.220 + 4.698 + 3.650
30.568 x 24 = 733.632
04, 13, 21 & 30
8P
4
4 + 5 = 28.828 + 4.699
4 x 33.527 = 134.108
4 + 5 + 6 = 28.828 + 4.699 + 3.832
37.359 x 4 = 149.436
05, 09, 14, 22, 26 & 31
9P
6
7 + 8 = 29.305 + 4.641
6 x 33.946 = 203.676
7 + 8 + 9 = 29.305 + 4.641 + 3.884
37.830 x 6 = 226.98
= 26.918
01
SUB-TOTAL OF UFS (m²)
7P 02
= 30.568
REFUSE ROOM
= 33.527 = 33.946
= 37.359 = 37.830
983.816
TOTAL UFA PER FLOOR SUB-TOTAL (17 STOREY)
1,110,048
TOTAL UFS PER FLOOR SUB-TOTAL (17 STOREY)
983.816 x 17 = 16,724.872
04 8P
1,110.048 x 17 = 18,870.816
U.F.A./U.F.S. DIAGRAM OF GROUND FLOOR
DOMESTIC (F4) FLAT TYPE
FLAT NOS.
NOS.
UFA (m²)
SUB-TOTAL OF UFA (m²)
7P 03
UFS (m²)
U.F.A./U.F.S. DIAGRAM OF F2
SUB-TOTAL OF UFS (m²) 8
9
24, 25, 27, 28, 29, 32, 33 & 34
7P
8
1 + 2 = 22.445 + 4.752
= 27.197
30.850 x 8 = 246.800
1 + 2 + 3 = 22.445 + 4.752 + 3.653
8 x 27.197 = 217.576
7
= 30.850
26
25
9P
30
8P
26 & 31
9P
1
4 + 5 = 28.828 + 4.699
2
7 + 8 = 29.053 + 4.745
= 33.527 = 33.798
1 x 33.527 = 33.527
4 + 5 + 6 = 28.828 + 4.699 + 3.832
37.359 x 1 = 37.359
2 x 33.798 = 67.596
7 + 8 + 9 = 29.053 + 4.745 + 4.063
37.861 x 2 = 75.722
= 37.359 = 37.861
318.699
TOTAL UFA PER FLOOR
7P
2
359.881 x 1 = 359.881
SUB-TOTAL (1 STOREY)
7P
1 27 3
7P 28
318.699 x 1 = 318.699
SUB-TOTAL (1 STOREY)
24
7P
7P
2
1 27 3
359.881
TOTAL UFS PER FLOOR
28
19
7P
7P 7P
DOMESTIC (F3)
18
29
29 7P
7P
FLAT TYPE
FLAT NOS.
NOS.
UFA (m²)
SUB-TOTAL OF UFA (m²)
30
UFS (m²)
7P
14
1 + 2 = 22.445 + 4.752
14 x 27.197 = 380.758
1 + 2 + 3 = 22.445 + 4.752 + 3.653
30.850 x 14 = 431.900
04 & 30
8P
2
4 + 5 = 28.828 + 4.699
2 x 33.527 = 67.054
4 + 5 + 6 = 28.828 + 4.699 + 3.832
37.359 x 2 = 74.718
14
9P
1
7 + 8 = 28.888 + 4.745
1 x 33.633 = 33.633
7 + 8 + 9 = 28.888 + 4.745 + 4.063
37.696 x 1 = 37.696
= 27.197
8
8P 5
01, 02, 03, 15, 16, 17, 18, 19, 27, 28, 29, 32, 33 & 34
4
32
7P
33
7P
17
16
7P
= 33.527 = 33.633
TOTAL UFA PER FLOOR
481.445
SUB-TOTAL (1 STOREY)
481.445 x 1 = 481.445
= 37.359
8P 5
7
6
= 30.850
30
9
7P 34 15
7P
= 37.696
7P 32
7P 33
7P 34
9P
7P MAC OFFICE
01
544.314
TOTAL UFS PER FLOOR
9P 31
6
14
7P
4
THE INFORMATION PROVIDED IN THIS AS-BUILT DRAWING REFLECTS THE ACTUAL SITE CONDITIONS
02
AS AT : 9th May 2012
7P
544.314 x 1 = 544.314
SUB-TOTAL (1 STOREY)
REFUSE ROOM
03 7P
DOMESTIC (F2)
CLIENT
04 8P
FLAT TYPE
FLAT NOS.
01, 02, 03, 15, 16, 17, 18, 19, 20, 27, 28, 29, 32, 33 & 34
NOS.
UFA (m²)
SUB-TOTAL OF UFA (m²)
UFS (m²)
7P
15
1 + 2 = 22.445 + 4.752
15 x 27.197 = 407.955
1 + 2 + 3 = 22.445 + 4.752 + 3.653
30.850 x 15 = 462.750
04, 21 & 30
8P
3
4 + 5 = 28.828 + 4.699
3 x 33.527 = 100.581
4 + 5 + 6 = 28.828 + 4.699 + 3.832
37.359 x 3 = 112.077
14 & 31
9P
2
7 + 8 = 28.866 + 4.638
2 x 33.504 = 67.008
7 + 8 + 9 = 28.866 + 4.638 + 4.063
37.567 x 2 = 75.134
= 27.197
= 33.527 = 33.504
= 30.850
= 37.359 = 37.567
U.F.A./U.F.S. DIAGRAM OF F3
575.544
TOTAL UFS PER FLOOR
649.961
575.544 x 1 = 575.544
SUB-TOTAL (1 STOREY)
649.961 x 1 = 649.961
U.F.A./U.F.S. DIAGRAM OF F4
PROJECT
AS-BUILT DRAWING FOR SHUN LEE ESTATE
8
9
TOTAL UFA PER FLOOR SUB-TOTAL (1 STOREY)
7
DOMESTIC ALL FLOORS GRAND-TOTAL
24
7P
23
7P
22
7P 1 27
UFA (m²)
7P 28
SUB-TOTAL OF UFA (m²)
SUB-TOTAL OF UFS (m²)
UFS (m²)
19
7P
7P
M.A.C. OFFICE
1
GROUND FLOOR
HOUSING DEPARTMENT SITE OFFICE
1
= 12.892
= 12.892
= 12.892
= 12.892
TITLE
18
29
F4
PROJECT NO.
20
3
NOS.
21
8P 2
FLAT TYPE
(FOR NON-DIVESTED PORTION ONLY)
9P
7P
1,665.072 + 18,870.816 + 359.881 + 544.314 + 649.961= 22,090.044
NON-DOMESTIC (G/F) FLOOR
25
9P
1,475.724 + 16,724.872 + 318.699 + 481.445 + 575.544 = 19,576.284
DOMESTIC ALL FLOORS GRAND-TOTAL
26
7P
7P 30 8P
= 33.190
= 33.190
NON-DOMESTIC GRAND-TOTAL
= 33.190
46.082
5
= 33.190
4
9P
7P
31
32
7P 33
7P 34
17
16
15
14
17
6
46.082
NON-DOMESTIC GRAND-TOTAL
7P
7P
7P
9P
16
7P
13
15
7P
14
7P
9P
8P 7P
7P
7P
7P
7P
7P
01
LOCATION
FLOOR
USE
8P
TOTAL CAPACITY SERVED BY STAIR (PERSON)
TOTAL CAPACITY PER FLOOR (PERSON)
FACTOR
494.812
4.5
DOMESTIC
989.624
4.5
DOMESTIC
318.699
4.5
DOMESTIC
F4
F2 F3
DOMESTIC DOMESTIC
4.5 4.5
576.132 481.610
7P
01
12
327 + 3,716 + 71 + 106 + 128 = 4,348
(494.812/4.5) x 3 STOREYS = 327 (989.624/4.5) x 17 STOREYS = 3716 318.699/4.5 = 71
20 (F5 - F24)
STAIRCASE NO. 1 1 550 STAIRCASE NO. 2 1 550
03
= 759 + (51 X 10) = 1,269
05
7P
06
7P
07
08
9P
10
7P
REFUSE ROOM 7P
9P 04
7P
03
10
PERMITTED
20 (F2 - F21)
8P 9P
4 05
9
U.F.A./U.F.S. DIAGRAM OF F5 - F21
= 1,269 + 1,422 + 1,269 = 3,960
7P 06
7P 07
9P
7P 08
AS SHOWN
DRAWN :
AA/HYY
DATE : 22 / 07 / 2012
09
7
= 759 + (51 X 13) = 1,422 = 759 + (51 X 10) = 1,269
SCALE :
04 5
09 6
23 (F2 - F24)
STAIRCASE NO. 3 1 550
576.132/4.5 = 128 481.610/4.5 = 106.
11
7P
STOREYS SERVED ABOVE GROUND LEVEL
EXISTING STAIRCASE (WIDTH)
DRAWING NO.
7P 02
DISCHARGE VALUE CALCULATION
8P
LEE CHEUNG F22 - F24 HOUSE F5 ( BLOCK A ) F21
7P 1 3
11
02
UFA PER FLOOR (m²)
2
12
DISCHARGE VALUE SCHEDULE
13
CHECKED : CWL
APPROVED : KCY
8
U.F.A./U.F.S. DIAGRAM OF F22 - F24
This Drawing is Prepared Under The Supervision of:
3,960 (PERMITTED) < 4,348
FLOOR
USE
UFA PER FLOOR (m²)
FACTOR
PERSON PER FLOOR
MIN. NO. OF EXIT DOORS (FROM ROOM) OR EXIT ROUTE (FROM STOREY) REQUIRED
F22 - F24 LEE CHEUNG HOUSE F5 - F21 (BLOCK A) F4 F3 F2 G/F
MIN. TOTAL WIDTH OF (mm) EXIT DOORS
PROVIDED REQUIRED
PROVIDED
MIN. WIDTH OF EACH (mm)
EXIT ROUTES REQUIRED
PROVIDED
EXIT DOORS REQUIRED
LOCATION
PROVIDED
DOMESTIC (HIGH BLOCK)
494.812
4.5
110
2
2
1 750
NO DOOR
2 100
2 700
850
NO DOOR
1 050
DOMESTIC (HIGH BLOCK)
494.812
4.5
110
2
2
1 750
NO DOOR
2 100
2 700
850
NO DOOR
1 050
1 350
DOMESTIC (LOW BLCOK)
494.812
4.5
110
2
2
1 750
NO DOOR
2 100
2 700
850
NO DOOR
1 050
1 350
4.5
36
2
1 750
NO DOOR
2 100
4.5 4.5
36 54
2 2
1 750 1 750
NO DOOR NO DOOR
2 100 2 100
2
1 750
DOMESTIC (HIGH BLOCK) DOMESTIC (LOW BLCOK) DOMESTIC (HIGH BLOCK) DOMESTIC (LOW BLCOK)
159.350 (take average each block) 159.350 (take average each block) 240.805 (take average each block) 240.805 (take average each block)
2 2 2 2
4.5
54
NO DOOR
2 100
4.5
64
2
1 750
NO DOOR
2 100
DOMESTIC (LOW BLCOK)
288.066 (take average each block)
4.5
64
2
2
1 750
NO DOOR
2 100
HOUSING DEPARTMENT SITE OFFICE
33.190
9
4
--
1
--
DOMESTIC (HIGH BLOCK)
288.066 (take average each block)
2
900
--
2 700 2 700 2 700 2 700 2 700
850
NO DOOR
850 850
NO DOOR NO DOOR
850
NO DOOR
850
NO DOOR
2 700
850
NO DOOR
DIRECT ACCESS
750
860
FLOOR
USE
EXIT ROUTES
PROVIDED REQUIRED
1 050 1 050 1 050 1 050 1 050
1 350
1 350 1 350 1 350 1 350 1 350
1 050
1 350
1 050
DIRECT ACCESS
LEE CHEUNG HOUSE (BLOCK A)
F1 - F38
DOMESTIC
RATE OF UFA / UFS UFA/UFS (m²) PER PERSON 33.798 (take max.)
W.C.
BASIN.
BATH / SHOWER
CAPACITY
9
REQUIRED 4
1
PROVIDED
REQUIRED
1
1
PROVIDED REQUIRED 1
1
PROVIDED 1
CONSULTANT
REFUSE ROOM CALCULATIONS DOMESTIC
MINIMUM AREA REQUIREMENT (m²)
NON DOMESTIC
22,090.044 / 347
63.660 SUB-TOTAL
63.660
SUB-TOTAL
0.563
46.082 / 925
0.397
TOTAL 64.057
AREA PROVIDED (m²)
YUEN KWOK CHEUNG
RIBA ARAIA HKIA RA AUTHORIZED PERSON (LIST 1) COMPUTER REF :
31.663 m² < 64.057 m² (REQUIREMENT)
As-built drawings of Hong Kong Public Housing, courtesy of Spence Robinson Ltd
84
REFUSE ROOM
4345
CAPACITY
LOCATION
7290
SCHEDULE OF SANITARY FITMENTS
MINIMUM REQUIREMENT OF EXIT DOORS AND EXIT ROUTES
AREA DIAGRAM OF REFUSE CHAMBER AT LEE CHEUNG HOUSE ( BLOCK A )
NOTES :
日期
修訂版本 1
2
3
4
5
6
7
8
9
Rev. A
10
34010
3250
2325
4570
4570
4570
4570
4570
2325
3250
380
380
380
3175
Q
1540
24
22
7P 7P
9P
7P 7P
650
7P
1350
4570
1000
1000
PART PLAN OF STORE ROOM AT F18-F21
380 1540
THE INFORMATION PROVIDED IN THIS AS-BUILT DRAWING REFLECTS THE ACTUAL SITE CONDITIONS
3250
DN 17R
1540
K
2320
230
8P
2335
2335
230
230
2335
3190
150
2335
17
1560
7P
14
9P
7P 7P 1000
2425
3250
7P
15
13
PROJECT
1000
METAL GRILLES
01 1350
1350
12
AS-BUILT DRAWING FOR SHUN LEE ESTATE
7P
F
1000
7P
7P
7P
E
03
10 1100H RAILING ON KERB
C
09
1540
8P
B 1540
3250
2325
4570
4570
4570
4570
4570
009
2325
3250
SCALE :
1:150
DRAWN :
AA / HYY
CHECKED : CWL
3175 380
PART PLAN OF PUMP ROOM AT F14
380
DRAWING NO.
CONC GRILLES 4800
1540
9P
08
DN 15R
7P 07
650
06
01
UP 15R
05
2170
1800
7P 7P
9P
7P
D
1000
1350
04
7P
TITLE
TYPICAL FLOOR PLAN (F5 - F21 ) OF LEE CHEUNG HOUSE
4570
7P
34
(FOR NON-DIVESTED PORTION ONLY) PROJECT NO.
11
4570
02
AS AT : 9th May 2012
CLIENT
G
230
A
A
16
H
230 230
3075
150
J
8P
2320
2425
34
A
4575
33
A
4570
32
7P
1350
31
7P
235
4575
650 UP 17R
230
1350
1000
7P
9P
380
F'
WEN
METAL GRILLE
J'
G'
WEN
25-01-2013
18 1100H RAILING ON KERB
H'
CM
Rev. I
7P
PART PLAN OF LIFT MACHINE ROOM AT F17
7P
29
30
LSQ
25-12-2012 07-01-2013
17
1560
7P
7P
7P 4570
17
1560
19
7P
KL
17-12-2012
Rev. G Rev. H
34010
34010
MD
K'
17-10-2012
Rev. F
METAL GRILLE
DN 17R
DN 17R 1350
UP 17R
4570
20
28
Rev. E
18 METAL GRILLE
21
27
L
KL
650
1350
18
1000
7P
UP 17R
9P
1800
METAL GRILLE
1540
N
M
24-09-2012
7P
1540
DN 15R 1540
CONC GRILLES
2170
23
WEN
Rev. D
1540
25
HYY
15-09-2012
1540
26
AA
23-08-2012
Rev. C
8P
650
4800
UP 15R 1540
P
負責人
15-08-2012
Rev. B
A
DATE : 22 / 07 / 2012 APPROVED : KCY
This Drawing is Prepared Under The Supervision of:
380
34010
7'
8'
9'
10
11
12
13
14
15
TYPICAL FLOOR PLAN (F5 - F21) OF LEE CHEUNG HOUSE
16
YUEN KWOK CHEUNG
RIBA ARAIA HKIA RA AUTHORIZED PERSON (LIST 1) COMPUTER REF : ESE124 009 CONSULTANT
85
86
2011 - 2013
2013 2012 - 2013
Tel Email
EDUCATION
Bachelor of Environments, University of Melbourne
PROFESSIONAL EXPERIENCE
HjL Architecture (Melbourne), Architectural Assistance Spence Robinson Ltd (Hong Kong), Summer Intern
CONTACT
+(61) 410 094 822 bryanfan11@gmail.com
Please refer to my CV for details and my other involvements in the University.
87
88