Week 10 Journal On Site (Take 2) The white wires have also been installed in the roof structure. These are used for utilities and services which run through the ceiling.

For the site visit, we returned to the Oval Pavilion to see the progress made over the past weeks. From the visit, we observed that the foundations and main steel frame structure of the building have been constructed. The timber rafters for the roof structure has also been constructed.

Constructing Environments Brian Siu (635900)