Bro brca kirklandlake mining sept2014

Page 1

C O M P A N Y O V E R V I E W


Kirkland Lake Gold Kirkland Lake Gold Maintains Standards

Kirkland Lake’s mission statement is to produce gold in a s sustainable and profitable manner Written by: Andrew Rossillo

Produced by: Bobby Meehan


ns High Grade

safe,

3


C O M PA N Y N A M E

K

irkland Lake Gold operates in Northern Ontario, Canada, one of the safest mining jurisdictions in the world. The Company mines one of the highest-grade ore bodies in the world at 0.44 opt (14 g/t) with massive exploration and growth potential in the immediate area. Kirkland Lake’s mission statement is to produce gold in a safe, sustainable and profitable 4

September 2014

manner such that the Company generates a return on investment for its shareholders while providing benefits to all stakeholders with the goal of improving the lives of their employees and the residents within the communities that they operate. The Company remains true to this mission statement by considering safety, sustainability and profitability in every decision they make within the business each and every day.


SECTOR

Kirkland Lake operates with the core values of safety, trust, respect, equity, environmental, teamwork and social responsibility. “We want our employees to go home in the same condition as they came to work. Subsequently, safety is at the forefront of every decision we make while all meetings start with a safety talk. In the workplace we believe in trust through honesty, commitment and open dialogue and communication,” says Kirkland

Lake’s CEO George Ogilvie. “We respect everyone’s contribution no matter how small and regularly reward and acknowledge our employees when we see good results and the right behavior. More often than not it requires a team effort to get the best results. We also treat our people with dignity. All of these values are part of how I conduct myself as the CEO so that they can cascade down into the business. Environmental w w w. k l g o l d . c o m

5


Kanuck Rock Drill Services Manufactures and repairs mining products which include rock drills, component rebuilding, custom machining, mechanical drawings, manufacturing drill parts, air motors, jackleg and stoper airlegs. Owned and operated by Lawrence Beaucage. Mr. Beaucage has been employed in this industry for over 35 years. Kanuck Rock Drill Services serves the Sudbury Region, and Northern Ontario Areas.

For more information please visit our website at www.kanuckrockdrillservice.ca

WE SERVICE NORTHERN AREA OF ONTARIO, CANADA

Your Northern Ontario Provider.

North Star Linen can supply your operations with a wide range of coveralls and uniforms to suit your work environment. From high visibility coveralls, Arc Flash coveralls, to regular coveralls and uniforms, we have a great selection available for you. North Star Linen offers the Locker System to facilitate the distribution, control inventory and losses. Our weekly program also includes bins or carts to manage the soiled inventory.

Phone: 705.335.2208 I Toll Free: 1.800.461.5756 I Fax: 705.335.6875 E-mail: uniforms@northstarlinen.com I www.northstarlinen.com


KIRKLAND LAKE GOLD stewardship and sustainability is also a very important core value for us; which is highlighted in our main energy conservation program. We take our social responsibility very seriously and subsequently invest in the community and groups when the right opportunities present themselves.” A concrete example of how these values are applied to their employees includes the Company’s improved management: “I think the management here is enjoying the new management style. I encourage collaboration amongst managers and staff, support and consider new ideas or suggestions on how we can improve. Now it’s much more of a partnership and collaborative process where we determine the targets and hold ourselves accountable and responsible for our results towards our targets. And we’re constantly monitoring, giving positive recognition and feedback when we’re doing well, as well as addressing weaknesses through discussion and action planning.” Continuous Improvement Among the many factors that

MINING

help keep Kirkland Lake among the leaders in the mining industry is their dedication to continuous improvement. This includes raising cut-off grades and stopping the practice of mining incremental tonnage, which is mineralization not in any reserve and resource category, but previously was mined when encountered. Something that is unique to the Kirkland Lake Gold Camp is their high reserve grade of 0.44 ounces per ton. “Prior to my appointment, mined grades were significantly below reserve grades. This was creating an adverse effect on costs and margin. Stopping this practice has increased our calendar year grade to 0.39 ounces per ton, a significant improvement over the 0.30 ounces per ton the Company was averaging prior to January 2014,” says Ogilvie. The primary methods of achieving these particular results through continuous improvement include tighter dilution control, tighter scrutiny with onsite requests for capital (managers required to show IRR, payback and NPV’s and other justifications on capital requests), w w w. k l g o l d . c o m

7


UNITED PERSONNEL CARRIERS UNITED PERSONNEL CARRIERS

4-PERSON

WWW.UPC-CANADA.CA

MULTIPURPOSE, AFFORDABLE AND INNOVATIVE

OEM

EMT

2-PERSON

· Engineering Services · Project Management · Mine Hoisting Systems, Audits, Certification · New and Upgraded Installations · Headframe, Shaft Design, FEA · Hoist Controls, Automation

Tel: +1.905.689.7375 Fax: +1.905.689.5361 info@tiley.on.ca www.tiley.on.ca


KIRKLAND LAKE GOLD and aggressively looking at new ore sources on our existing land package to feed the mill and lower costs. In addition, Ogilvie shared a particularly promising element regarding improved productivity through new equipment: “We’re looking at productivity gains in the mine department. In some areas where we should be more productive, we ordered new electricity powered equipment from Atlas Copco. Typically, all the drilling is done with handheld

MINING

drills, which operate through compressed air, which is very inefficient and not particularly effective...so once our new electric drills arrive we think in the second half of the calendar year we should see better productivity.” Operations Kirkland Lake Gold Camp has been producing for a very impressive 100 years. One of the most recent releases from the company provided details regarding why we might be able to expect 100 more.

w w w. k l g o l d . c o m

9


becker varis...

we speak your language.

Pro Filtration offers the most complete line of industrial filtration products and services on the market today. Through years of experience, Pro Filtration is able to optimize your filtration requirements, it being through our in-house expertise or our on-site visits. Our knowledge and

• SMARTCOM Leaky Feeder System

experience ensues that the customer is supplied with the best product for each filtration application.

• Voice, Data and Video • WLAN High Speed Data Solutions • RFID Tagging and Tracking System

Phone:(705) 253-4578

Fax:(705) 253-4730

www.profiltration.com

• Collision Avoidance System • SMARTBLAST Remote Control Blasting System ENERGY DISTRIBUTION AUTOMATION COMMUNICATION TRANSPORTATION

705-674-8111 | www.varismine.com

ABF Mines began operations in 1995 with a dozen employees working mainly in the mining sector. Thanks to its innovative vision, the company has grown steadily to remain in the forefront in the industry. Since its inception, always excels in the mining sector in industrial mechanics and was able to expand its services in related areas such as forestry , building , engineering , plumbing , electrical and welding.

138, Chemin des Boisés Val-d'Or, Québec J9P 4N7

PHONE: (819) 738-5289

www.abfmines.com

According to the report, it included near-surface mineralization within 1,000 feet of surface of 152,000 oz. gold (104,000 oz. indicated and 48,000 oz. inferred category) at 0.35 opt grade. “We believe this represents an expansion opportunity in the future; which could be mined cost effectively while the mill has excess capacity. Subsequently, one exploration drill is currently expanding the resource with a second doing in-fill drilling with the hope of having a mineable reserve in 12 months with plans to


MINING

mine the orebody at that time. All of this could be completed with minimal capex and could be undertaken quickly once given the green light due to the near surface proximity.”

Company Information INDUSTRY

Mining

Next Phase of Development The strategy for Kirkland is to return the mine to producing at its historical grade averages of 0.4 – 0.44 ounces per ton. The Company also plans to lower unit costs through scale and efficiencies and return to generating free cash flow. Once this is achieved the company will look to further increases output through self-funded exploration and development of other sources of ore from their current property position. “The Company’s share count of 70 million shares in issue, 83 million fully diluted permits that once the company’s production is steady state and generating significant free cash flow significant return on investment would be seen by shareholders,” says Ogilvie. With its new business plan in place, the Company has a strong focus on higher grade. The Company expects to return to breakeven and profitability in the next several quarters. Once profitability has been returned any future uplift in the gold price will result in a corresponding uplift in free cash flow, meaning greater return on investment for shareholders. All signs point to Kirkland Lake being a solid investment.

FOUNDED

2001 EMPLOYEES

250-499 REVENUE

$100M - $250M

w w w. k l g o l d . c o m

11


KIRKLAND LAKE - MACASSA MINE OFFICE P.O. Box 370 1350 Government Road West Kirkland Lake ON P2N 3J1 Tel: 705-567-5208 Fax: 705-568-6444 www.klgold.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.