King Henry VIII Gatehouse, St Barts Hospital
Conservation Register | Giles Quarme Architects
Henry VIII Gatehouse is a Grade I listed gatehouse that leads into ‘Barts’ (St Bartholomew’s) Hospital, off Smithfield Square. It was constructed in 1702 by Edward Strong and contains an almost full-size sculpture of Henry VIII on the front elevation. The building would appear to have a brick core and was faced with Portland stone, probably Purbeck, according to George Ballard of GBG.
Roles and Responsibility:
- Surveyed on Grade I listed building regulation inspections and risk assessments to ensure PAYE stonemasons comply with ICOMOS guidelines.
- Marked down the cracks on the site by taking photos and attached inside the drawing before submission.
- Assiting in advising the health and safety for the King Henry VIII statues to avoid damage during the repairs.
Figure 01 - Remove cornice edge profile formed in cement, replace in stone
Figure 02 -
Figure
Figure 05 - Harsh brush down severely delaminated stones. Replace severely decayed ornament stones
St. Pancras Hospital
BIM Coordinator | Giles Quarme Architects
GDV = £150k
Roles and Responsibilities:
- Collaborated BIM level 2 linked models using ISOl9650-2 & PAS 1192-2.
- Rendered a retrofit interior and exterior for Argent.
CGI Retrofit interior for commercial purpose at St Pancras Hospital.
CGI Retrofit exterior for St Pancras Hospital access to St Pancras Garden.
Holland Park
BIM Modeler | KB Architects GA =1600sqft
KB Architects have been appointed by The Holland Park Dentist, who are situated in the heart of Holland Park high street to design and develop their existing dental clinic into a modern and contemporary facility. The design brief is to provide the following as part of this comprehensive refurbishment:
• Upgrade and modernise the entire level 1.
• Provide 2 fully functional Dental Surgery rooms.
• Introduce a new and inviting main reception and waiting area.
• Provide a fully complaint Decon Room.
• Provide a new X-Ray Room.
• Provide a clean and enclosed staff storage. area
• Upgrade and modernise communal areas .
• Upgrade and modernise main entrance and building signage.
• Provide a safe access route to external services.
Roles and Responsibilities:
- Collaborated with project team members to create a comprehensive 3D washer disinfector for the dental decomination room.
- Generated the technical drawings in BIM format in accordance to BIM level 2.
CLINICAL CABINET
Sungai Besi Airport
Part 1 Architectural Assistant | KDI Architects
GDV = £1billion
The overall masterplan is designed by SOM and BDP. KDI were invited to submit a masterplan for a competition for the redevelopment of Kuala Lumpur’s Sungai Besi airport and its surroundings. The mixed-use development will be centrally located at the terminus of the proposed Pan Asian high-speed railway which is envisaged as a catalyst for the regeneration of the Greater Kuala Lumpur area and will redefine areas of influence. The masterplan creates a sub-tropical city that aims to become the focus of business and cultural life in the region attracting investment and talent to consolidate Kuala Lumpur’s urban economy and its influence within the region. With the future prospect of Singapore a mere 90 minutes away, the city aspires to be the ideal place to work, live and enjoy the vibrancy of a world class urban environment. Our proposal explores new urban morphologies and innovative approaches to the design of urban infrastructure, landscape and public realm to respond to the brief requirements for a complex urban entity.
Roles and Responsibilities:
- Drafted a 50-acre proposal using photorealistic rendering techniques for exterior perspectives after feasibility studies were taken.
EkoQuay, KL River City
CGI Artist | KDI Architects
GDV = £130 million
The mixed development of approximately 298,375.37 m2 gross floor area (GFA) is only 9 kilometres from Kuala Lumpur City Centre and is easily accessible via Jalan Cheras, Middle Ring Road II, East-West Link, Grand Saga Highway and the SILK Highway.
The development is composed predominantly of 3 towers high-rise serviced apartments (1516 units) with facilities, 1 office tower and 1 hotel tower. Furthermore it is connected a vibrant lifestyle shopping complex with approximately 1 million square feet (GFA) consisting of retail spaces including a superm≈arket, gym & cineplex. The office tower is connected to the shopping mall as well The office tower has a secured lobby with 24 hours surveillance and 3 tier security system.
Roles and Responsibilities:
- Rendered the facode for 244 high-rise residential units within deadlines.
- Modelled from plans drawing and set a camera view before renderings.
- Utilized the Revit model from consultants to convert to Sketchup model for renderings.
- Generatefacade variations with concept.
06. Master Plan Amarawati GC 2017
Winner India
My team named the Assembly as Sacred Assembly, secretariat as People’s Secretariat and High Court as Temple of Justice. The designs reflect Telugu culture and Buddhism which was said to be prevalent in the area in the past. The company also presented the aerial view of the entire construction which will be spread over 900 acres.
RD Harris Company previously has the experience of taking part in the design of Putrajaya City. Putrajaya is an artificially created waterfront city while Amaravati will have a natural advantage, the company representatives said. The designs of the iconic buildings are likely to be finalized by this year end.
Roles and Responsibilities:
- Researched a feasibility studies on Amarawati, India.
Credit: RDA team + F+P team
Winner Malaysia
The Fabri-Cave is an Eco-friendly booth fabricated by recycled matterials such as corrugated cardboard and bamboo strip. The idea of this design intended to bring one’s individual back to the nature through the exploration in this man-made cave, as well as the raising of ecological awareness in the same time. The structure is a hand maded by gluing layers of corrugated cardboard, together with stipping and cutting of bamboo.
This booth design is intially conceptualised by applying addition and substraction in a cube shape. The internal space is cut, fill and articulate in order to create a transformation of space for exhibition purpose. Neither the inter and outer surface, are crafted into curve and smooth suface to imitate the shape of a cave.
Roles and Responsibilities: - Assisted in laser-cutting on corrugated cardboard.
Credit: DAR3 team
activist protest their rights in the open areas. Local businesses supports vulnerables in need. Local residents are having family outing days with kayak and swimming practices.
SITE PLAN Noise pollutions generated by aircrafts at London City Airport, Royal Dock.
Plan Fire Drawings. Exploded Axonmetric The swinging bridge are surrounded with winter garden and residential.
Public Space
Foodbank as Youth Club Skopje, Macedonia
“Whatever you do, small kids are begging for stuff. When you are walking, they ask you for money. When you are eating, they almost grab the meat from your plate. Kinda ruined the experience for me.”
A tourist commented on his experiences during his trip to Skopje. - TripAdvisor, July 2016
“To end poverty, we must start with children.” said Benjamin Perks, UNICEF Representative. - UNICEF, October 2018
The proposal tackles food waste by applying food composting cycles. Vertical farming is implemented as the fac;:ade of the building. The youth club partners with nearby restaurants and recycle their daily food scraps. This helps to increase awareness about using composted food scraps as soils for crops. People composts the food and apply the composting techniques to their neighbourhood courtyard.
Feasibility Studies Skopje overlaid by Plumes of Pollution.
Elevation Youthclub as a foodbank.
Sectional Axonmetric Daylights are entered through the atrium.
CGI Exterior Youth are having barbeque on Roof Garden.
CGI Interior Youth are having basketball indoor.